
Würthwein
ARCADIS Varic
Disposal Instructions
System
SP
Disposal Instructions
08080017
Print No.:
Replaces: SPR2-310.861.01.01.02
SPR2-310.861.01.02.02
© Siemens AG
The reproduction, transmission or use
of this document or its contents is not
permitted without express written
authority. Offenders will be liable for
damages. All rights, including rights
created by patent grant or registration
of a utility model or design, are
reserved.
English
Doc. Gen. Date: 08.04
2004

2 Revision / Disclaimer
1Revision / Disclaimer
Document revision level
The document corresponds to the version/revision level effective at the time of system
delivery. Revisions to hardcopy documentation are not automatically distributed.
Please contact your local Siemens office to order current revision levels.
Disclaimer
The installation and service of equipment described herein is to be performed by qualified
personnel who are employed by Siemens or one of its affiliates or who are otherwise
authorized by Siemens or one of its affiliates to provide such services.
Assemblers and other persons who are not employed by or otherwise directly affiliated
with or authorized by Siemens or one of its affiliates are directed to contact one of the
local offices of Siemens or one of its affiliates before attempting installation or service procedures.
ARCADIS Varic SPR2-310.861.01.02.02 Siemens AG
08.04 CS SD 24
Page 2 of 6
Medical Solutions

Table of Contents 3
1- 0Table of Contents
1 _______ Environmental Protection Measures ________________________________ 4
Disposal list . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Siemens AG SPR2-310.861.01.02.02 ARCADIS Varic
Medical Solutions
08.04 CS SD 24
Page 3 of 6

4 Environmental Protection Measures
1Environmental Protection Measures
2-
Disposal list 0
• The items in the table below have to be turned over to a qualified disposal firm.
Component
Assembly
Item
Hazardous Sub-
stance/Risk
Tube assembly C-arm, lower part (1/Fig.1/p.5) Lead, oil / implo-
sion of X-ray tube
Tube collimator C-arm, lower part in
(2/Fig.1/p.5) Lead 1
tube assembly
I.I. 23 cm I.I. housing, inserted
in housing
I.I. 23 cm C-arm, upper part,
inserted in cap
Balancing
weight (only I.I.
C-arm, in beam near
tube assembly
(3/Fig.1/p.5) Lead / implosion of
I.I. tube
(4/Fig.1/p.5) Lead / implosion of
I.I. tube
(5/Fig.1/p.5) Lead 1
23 cm)
Basic unit Electronics box (6/Fig.1/p.5) Lead 1
TFT monitor(s) Monitor trolley, upper
(1/Fig.2/p.5) n.a. 1 / 2
part
PC PC in monitor trolley (1/Fig.3/p.6)
Lithium 2
(2/Fig.2/p.5)
Quan-
tity
1
1
1
Printer In monitor trolley (3/Fig.2/p.5) n.a. 1
Battery PC (1/Fig.3/p.6) Lithium 1
Battery UPS (4/Fig.2/p.5) Lead 1
ARCADIS Varic SPR2-310.861.01.02.02 Siemens AG
08.04 CS SD 24
Page 4 of 6
Medical Solutions

Environmental Protection Measures 5
Fig. 1: ARCADIS Varic system overview
Fig. 2: Monitor trolley
Siemens AG SPR2-310.861.01.02.02 ARCADIS Varic
Medical Solutions
08.04 CS SD 24
Page 5 of 6

6 Environmental Protection Measures
Fig. 3: PC overview
Pos. Lithium battery
Fig. 4: View of battery
Pos. Lithium battery
ARCADIS Varic SPR2-310.861.01.02.02 Siemens AG
08.04 CS SD 24
Page 6 of 6
Medical Solutions