SLXR40TBLW
SLXR40BLW Bundles Required:
ST175/80R13C Tire/TS Dir Rim .................2
(or)
ST175/80R13C Tire/Galv Dir Rim ..............2
66520 Bag with Chains, No Coupler .....................1
62340 Literature Bag - Trailers ..............................1
80340-- Frame Bundle - 2X4W XR40BLW .............1
66996-- Tongue Assembly 55”, W/UFP Actuator .....1
ShoreLand’r offers their product line in either galvanized or
painted nish. When ordering parts it is important that you
specify the nish or color you have on your product. The ve
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various nishes. When
ordering these items use the ve (5) digit number along with
a two (2) digit sufx for the proper nish.
00..........Galvanized
01..........Arctic White
03..........Black
33..........Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003452
Page 1 REV A 10/18/06
Table of Contents: Page
Frame Drawing & Bill of Materials ............................ 2-3
Safety Instructions .................................................... 3
Tongue & Safety Chain Dwg/BOM/Assy Instr. .......... 4-5
White Ground Installation Instructions ...................... 5
Brake Line Assembly Instructions............................. 5
Prole 2000 Winch Dwg/BOM/Assy Instr. ............... 6-7
Chassis Drawing & Bill of Materials .......................... 8-9
Tire Size & Carrying Capacity Chart ......................... 8
Rocker Arms Assembly Instructions ......................... 9
Spring Assembly Instructions ................................... 9
Axle Assembly Instructions ....................................... 9-10
One Axle Brake Installation Instructions ................... 10
Tire & Wheel Assembly ............................................ 10
XR Dwg/BOM / Assembly Instructions ..................... 11-12
Trailer Adjustments ................................................... 13-14
Axle Adjustments .................................................. 13
Rear Support System............................................ 13
Rollers ................................................................... 13
Front Support System Roller................................. 13
Winch Post Adjustments ....................................... 13-14
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003452
Page 2 REV A 10/18/06
Refer to your ShoreLand’r Owner’s
Guide and other decals on trailer for
additional information.
SAFETY INSTRUCTIONS
4810709
Proper tongue weight must be maintained.
Rev C 8/28/06
Before towing, check the following to ensure
that:
1. All parts, bolts, nuts and wheel lug
nuts are tight.
2. All wheel lug nuts must be tightened
to a minimum torque rating of 85 ft/lb.
3. Lug nuts must be re-torqued after the
first 50 miles, then periodically there
after.
4. Tires are inflated to manufacturer’s
standards. (See tire sidewall)
5. Wheel bearings have adequate
grease.
6. Hitch ball is the proper diameter and
has a rating equal to or greater than
the GVWR of the trailer.
7. Coupler is properly attached and
secured to coupler ball.
8. Trailer safety chains are crossed
under the tongue and attached to
towing vehicle.
9. All lights are operational. Note: It is
recommended that the trailer lights
be disconnected before backing into
the water.
10. Tie downs, winch strap and bow eye safety chain are secure.
11. Trailer tongue jack is in up or travel
position.
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove
parts and sort by size.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003452
Page 3 REV A 10/18/06
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003452
Page 4 REV A 10/18/06
TONGUE
The tongue is shipped separate of the frame. Locate
the appropriate tongue and install by sliding it in the
front of the tongue channel.
Line the holes in the tongue with the holes in the
tongue channel. Install the 1/2” x 4” hex bolt in the
front cross hole and secure with a 1/2” lock nut.
Remove the wire harness from the rear of the tongue.
Place the wire harness and the brake line through the
hole provided in the tongue cover plate. See Detail A
in Diagram A.
Secure the tongue cover plate in position with the
same 1/2” x 1-1/2” hex bolt that secures the back on
the tongue to the tongue channel of the frame. Secure
with 1/2” lock nut. Tighten both bolts just installed.
Plug the tongue wire harness ends into the frame har-
nesses by matching colors and ends. Push the extra
wire provided either into the rear of the tongue or else
remove the grommet in the side frame and place the
extra wire in the side frame. Replace grommet just removed.
WHITE GROUND WIRE INSTALLATION
Place the self-tapping screw provided through the
round metal ring on the white ground wire of the
tongue harness located at the rear of the tongue. Attach the ground wire to the main frame by driving the
screw in the hole provided next to the tongue channel
of the frame. This will assure a positive ground for the
lighting.
SAFETY CHAINS
Locate the 1/2” x 1-1/4” hex bolt. Slip the bolt through
a 1/2” at washer, then place through the last link of one
of the safety chains. Place a second at washer on the
bolt and insert through the hole as shown in Diagram
B. Secure with a 1/2” ange lock nut. Tighten. Repeat
this process on the second safety chain on the opposite side of the tongue.
Assembly is complete.
BRAKE LINE
Locate the brass brake line coupling. Remove the
plastic cap and thread the brake line coming out the
rear of the tongue into one end of the coupling. Bend
the line in a smooth gradual radius being careful not
to kink the line. Bend so it can be mated to the brake
line from the side frame. Once aligned, thread the side
frame brake line into the other end of the coupling.
Tighten both lines into the coupling.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003452
Page 5 REV A 10/18/06