Fanuc or Siemens machines installation procedure
This document is for Sharp SV and SVL 2414 and 2416 Fanuc and Siemens Control machines. Connect power (220V 3 Phase) to the main power switch.
X locking bracket
Remove ATC locking screw or bracket. They are usually a red tag there.
Y locking bracket
Installation procedure K. CHEN
SHARP INDUSTRIES INC
SHARP SV SVL 2414 2416
b
Fanuc or Siemens machines installation procedure
Caution tag
Connect air to the air regulator. Machine requires 85-90 PIS.
Air Regulator
ATC locking screw.
ATC locking
racket
Pressure switch.
Solenoid valves
Using MPG move the Z axis up.(Positive direction) Then remove spindle seat. For Siemens control machine, after power ON, you need to release E stop switch, Press RESET, Press FEED START to enable manual movement.
Reset Feed Start
More detail information, Please read Siemens manual first.
Installation procedure K. CHEN
SHARP INDUSTRIES INC