1. CHANGE IN THE SHAPE OF THE PU SUPPORT PLATE F/R AS A MEASURE TO IMPROVE
OPERATIONABILITY.
2. CHANGE IN SPECIFICATIONS.
3. MEASURE TO PREVENT CONTACT WITH THE SWITCH LEVER.
4. MEASURE TO IMPROVE THE INPUT POWER SUPPLY OF THE CLR PWB.
No. : DTE-257
1. Change in the shape of the PU support plate F/R as a measure to improve
operationability.
1.Model Name:SD-4085
2.General:A washer was inserted during tightening operations of the fixing screws when attaching
the RDH pop up unit F/R to the rear tip paper guide unit. This method of securing the
RDH pop up unit F/R resulted in extremely poor operationabilty performance, however,
and as an improvement measure the use of the washer has been discontinued, and a
change in the shape of the PU support plate has been carried out to replace it.
3.Action:From the start of 1996 November production.
2. Change in specifications.
1.Model Name:SD-4085
2.General:Changes have been carried out in the content of the main ROM in the main PWB, the
program ROM in the operation control PWB, the operation manual and the key operator
guide. These changes were carried out in accordance with a change that was carried
out in the specifications.
3.Description:Content of the change that was carried out in the specifications:
Key operator manual, P24. The number of fixed magnifications which can be set has
°
been established at one (1), and moreover, in simulation 26-28 the addition of three (3)
fixed magnifications has been made possible.
The range of change for the magnification of the zoom key has been established so
°
that it is within the fixed magnification.
(Continual depression of the zoom key will continue to change the magnification, but the
magnification will stop at each fixed magnification. The zoom key must be turned off once
and turned back on to change the magnification to the selected fixed magnification.)
SHARP CORPORATIONReprography Division
1/4
Green
C
The ready lamp will be turned ON even for EXTRA sized paper during the double side
°
copy mode. When copy operations are started, the S-D mode will be changed to the S-S
mode, and the D-D mode will be change to the D-S mode before copying.
The interchangeability of the main ROM in the main PWB, the program ROM in the
operation PWB and the data ROM are as shown in the table below.
Main ROM up to V3.06Main ROM versions later than 4.00
Program ROM up to V3.01
Data (English) ROM up to V3.02
Program ROM versions later than 4.00
Data (English) ROM versions later than 4.00
O: interchangeable X: not interchangeable
Please refer to the parts list for information concerning.
4.Action:From 1996 mid-September production.
3. Measure to prevent contact with the switch lever.
1.Model Name:SD-4085
2.General:The switch lever inside the RDH transport frame unit was too close to the sensor,
creating the danger of contact. As a trouble shooting measure to alleviate this problem,
a change has been carried out in the E-ring groove of the lift up shaft and the position
of the pin hole, preventing contact from taking place.
Sensor
Sensor
Switch lever position
moved 1 mm.
Lift up shaft
Lower limit switch lever
3.Action:From the start of 1996 September production.
2/4
Lift up shaft
Lower limit switch lever
4. Measure to improve the input power supply of the CLR PWB.
1.Model Name:SD-2075/3075/3076/4085
2.General:There was a danger of insufficient input current for the ON signal copy lamp, due to
irregularities in the circuit characteristics. As a trouble shooting measure to alleviate this
problem, a change has been carried out in the resistance.
3.Action:From 1996 mid-September production.
3/4
Ref.
No.
Model
name
Version P/G No.
Current partsNew parts
Parts codeParts code
Price
rank
Parts name
Effec-
tive
time
Inter-
change-
ability
Note
1
2
3
SD-4085
SD-2075
SD-3075
SD-3076
SD-4085
All
U.S.A.
only
Canada
only
U.S.A.
only
Canada
only
All
52 -27
53 -27CPLTM5188FC02CPLTM5188FC03PU support plate R
72 -73VHI27C24001FCVHIHN409606FCBGIC [IC264]
75 -53VHI27C51280FCVHI27C512A3FCAW Program ROM [IC104]
75 -51VHI27C01064FCVHI27C01090FCAZData ROM [IC100]
1 -30
75 -901
57 -20
57 -21
49 -12NSFTZ2331FCZ1NSFTZ2331FCZ2 AW Lift up shaft
62 -35
78 -35
CPLTM5187FC02CPLTM5187FC03
CPWBN1164FC51 CPWBN1164FC54 BZOperation control PWB
TINSE1372FCZZTINSE1372FCZ1BC
TINSE1377FCZZTINSE1377FCZ1BD
TINSE1373FCZZTINSE1373FCZ1AX
TINSE1378FCZZTINSE1378FCZ1AY
VRD-RC2EY162JVRNRC2EK5100F AAResistor [R325]
PU support plate F
AQ
Operation manual
Operation manual
(key operator guide)
1st lot
’96/11
Mid-
’96/9
1st lot
’96/9
3
5
∗
33 -12
100V
series
200V
series
100V
series
200V
series
100V
series
62 -901
33 -12
62 -901
33 -12
61 -901
33 -12
61 -901
33 -12
78 -901
!
SD-2075
4
SD-3075
SD-3076
SD-4085
<Interchange>
1. Interchangeable.4. Not interchangeable.
2. Cur re nt type c a n be u s ed in plac e of n ew t y pe .
New ty pe cann ot be us ed i n place of curr ent type .
3. Cur rent type cann ot be us ed in pl ace of new typ e.
New t y pe c a n be u sed in p la ce of cu rr en t ty p e.
Parts marked with “ ” is important for maintaining the safety of the set. Be sure to replace these parts with
specified ones for maintaining the safety and performance of the set.
CPWBF0822FC51CPWBF0822FC55 BM
CPWBF0822FC52CPWBF0822FC56 BN
CPWBF0822FC53CPWBF0822FC55 BM
CPWBF0822FC54CPWBF0822FC56 BN
CPWBF0822FC53CPWBF0822FC55 BM
5. Interchangeable if replaced with same types of
relate d parts in use .
6. Ot he r s.
Copy lamp control PWB
3
Mid-
’96/9
4/4
∗ A change has been carried out only for R325.
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.