Sharp AN-EP101B Installation Manual

AN-PHCM20
INSTALLATION INSTRUCTIONS FOR MOUNTING BRACKET FOR USE ONLY WITH SHARP PROJECTOR MODEL XG-PH50X
CEILING MOUNTING BRACKET AN-PHCM20
CEILING MOUNTING BRACKET COMBINED WITH OPTIONAL ADJUSTABLE EXTENSION TUBE MODEL AN-EP101B
COPYRIGHT © 2005 SHARP ELECTRONICS CORPORATION
INSTALLATION INSTRUCTIONS CEILING BRACKET AN-PHCM20
C A U T I O N
INSTALLATION OF THIS ADJUSTABLE CEILING MOUNTING BRACKET SHOULD BE PERFORMED BY QUALIFIED SERVICE/ INSTALLATION PERSONNEL FOLLOWING THE INSTALLATION INSTRUCTIONS
THE EXCLAMATION POINT WITHIN AN EQUILATERAL TRIANGLE IS INTENDED TO ALERT THE USER TO THE PRESENCE OF IMPORTANT OPERATING AND MAINTENANCE (SERVICING) INSTRUCTIONS IN THE LITERATURE ACCOMPANYING THE APPLIANCE.
IMPORTANT! THE INSTALLER SHOULD READ THESE INSTRUCTIONS THOROUGHLY BEFORE BEGINNING THE INSTALLATION AND SHOULD MAKE SURE THAT ALL THE WORK IS DONE IN COMPLIANCE WITH NEC AND ALL LOCAL BUILDING AND SAFETY CODES. SAVE THIS BOOKLET AFTER THE INSTALLATION IS COMPLETED. THE ACCESSORIES REFERRED TO IN THESE INSTRUCTIONS ARE INTENDED FOR USE ONLY WITH COMPATIBLE SHARP PROJECTORS. SEE SHARP PROJECTOR OWNER’S MANUAL OR SHARP DEALER TO DETERMINE
CAUTION: THE BRACKET MOUNTING SCREWS MUST GO DIRECTLY INTO THE BEAMS. SHEETROCK, LATH AND PLASTER, WILL NOT PROVIDE A SUFFICIENTLY SECURE SUPPORT.
CAUTION: TO REDUCE THE RISK OF PERSONAL INJURY, USE ONLY THE COMPONENTS WHICH ARE INCLUDED IN THIS PACKAGE, OR SPECIFIED IN THESE INSTRUCTIONS.
PARTS LIST FOR MODEL AN-PHCM20 CEILING BRACKET (SEE FIG. 1)
ITEM DESCRIPTION QUANTITY
A. PROJECTOR ATTACHMENT PLATE WHICH INCLUDES THE DUAL KNUCKLE POSITIONING ASSEMBLY. 1 B. DUAL KNUCKLE POSITIONING ASSEMBLY DETAIL 1 C. LOCKING HEX NUT & WASHER 1 D. STEEL CEILING MOUNTING PLATE WITH SECURITY FITTING 1 E. PLASTIC TRIM FOR CEILING PLATE 1 F. 1/4 X 10 HEX HEAD LAG BOLTS 2-1/2” LONG 6 G. 1/4 X 10 HEX HEAD LAG BOLTS 3” LONG 6 H. 1/4” I.D. WASHERS FOR USE WITH LAG BOLTS 6 I. M4 X 12mm MOUNTING SCREWS FOR USE WITH ATTACHMENT PLATE 3 J. PLASTIC TRIM COLLAR 1
PAGE 2
INSTALLATION INSTRUCTIONS CEILING BRACKET AN-PHCM20
FIGURE 1. ILLUSTRATION OF PARTS FOR CEILING BRACKET
A.
D.
C.
B.
E.
F.
H. J. I.
G.
INVERT THE PROJECTOR IMAGE
Please refer to the owners manual for your LCD Projector for detailed instructions of how to electrically invert the projected image to accommodate its use in the ceiling mounted mode.
LOCATION OF THE CEILING BRACKET
Please refer to the owner’s manual for your SHARP LCD PROJECTOR for information which will help you to determine the best location for the placement of the ceiling mounting bracket assembly.
INSTALLATION OF THE CEILING BRACKET
After you have determined the appropriate location for the ceiling bracket, you must locate the exact location of the ceiling beams. Most standard residential construction uses 16 inches between centers for overhead beams. You can mount the ceiling bracket by straddling two beams, or you can install the bracket in line with a single beam.
CAUTION: THE BRACKET MOUNTING SCREWS MUST GO DIRECTLY INTO THE BEAMS. SHEETROCK, LATH AND PLASTER, WILL NOT PROVIDE A SUFFICIENTLY SECURE SUPPORT.
STEP 1. INSTALLATION OF THE METAL CEILING BRACKET
After the location for the ceiling bracket has been determined, (see LCD PROJECTOR Owner’s Manual), make sure to locate beams in the ceiling.
PAGE 3
INSTALLATION INSTRUCTIONS CEILING BRACKET AN-PHCM20
1.1 a. Select straddle beam or single beam installation. b. Use the ceiling bracket as a template to mark the location where the pilot holes should be drilled. c. Drill the pilot holes for the support screws using a 1/8” drill bit into the center of the beam. (See Figs. 2 and 3).
1.2 Screw the ceiling plate to the beams. Use at least 6 screws and metal washers supplied with the unit. These screws should be tightened firmly to insure a vibration-free support. (See Figs. 2 and 3).
Two sizes of hex head lag bolts are provided. Use shorter screws for sheet rock surfaces and use the longer screws if the ceiling surface is constructed of a wood lath and plaster.
CAUTION: THE BRACKET MOUNTING SCREWS MUST GO DIRECTLY INTO THE BEAMS. SHEETROCK OR LATH AND PLASTER WILL NOT PRO­VIDE A SUFFICIENTLY SECURE SUPPORT.
FIGURE 2. ILLUSTRATION OF STRADDLE BEAM CEILING BRACKET INSTALLATION
Sheetrock or lath and plaster ceiling
Ceiling Mounting Bracket
Plastic Ceiling Bracket Trim Cover
Velcro
Security Bushing
Velcro
Security Option Label
Washers
1/4 X 10 Lag Bolt
NOTE: THE OUTER ROW OF HOLES ARE 16” BETWEEN CENTERS WHICH IS THE MOST COMMON BEAM SPACING IN RESIDENTIAL WOOD FRAME CONSTRUCTION.
Ceiling Beam
PAGE 4
Loading...
+ 9 hidden pages