Installation Guide Smart-UPS
On-Line
SRTRK4 Tower to Rack-Mount Conversion
Package Contents
Inspect the contents upon receipt. Notify the carrier and dealer if the unit is damaged.
™
One Rail Kit with instructions and
hardware for installing rails in a rack.
34a
• 1 pair of rail cleats
• 8 screws to secure cleats to the UPS
SRTRK4 is compatible with all the variants of the following models:
• SRT1000
• 1 pair of rack-mount brackets
• 6 flat head screws to secure rack-mount brackets to the UPS
• 4 ornamental screws to secure rack-mount brackets to the rails
•SRT1500
RT2200
S
•
•SRT3000
Note: UPS and External Battery Pack (XLBP) models may differ in appearance from those depicted in these graphics.
The installation process is identical for all models.
Tower to Rack-Mount Conversion of UPS
CAUTION
DAMAGE TO EQUIPMENT OR PERSONNEL
•The equipment is heavy. Each APCRBC152 battery module weighs 16.4 kg (36.2 lbs) and each APCRB
tery module weighs 12.5 kg (27.6 lb). Each APCRBC155 battery module weighs 11 kg (24.25 lb).
bat
C141
•Always practice safe lifting techniques adequate for the weight of the equipment.
• Remove the battery modules before installing the UPS.
•Use the battery module handle to carefully slide the battery module in or out of the unit.
•
use the battery module handle to lift or carry the battery module.
Do not
• Place the UPS on a table to remove the stabilizer brackets.
• Always install the UPS at the bottom of the rack.
• Always install the XLBP below the UPS in the rack.
Failure to follow these instructions can result in equipment damage and minor or moderate injury.
suo0874 b
suo0875b
suo0873b
suo0872b
x3
Smart-UPS On-2 Line SRTRK4 Tower to Rack-Mount Conversion2
b
5
4
8
0
u
b
1
7
8
0
o
u
s
s
Install UPS in Rack
Refer to the Rail Kit Installation Guide for instructions on rail installation.
CAUTION
DAMAGE TO EQUIPMENT OR PERSONNEL
• The equipment is heavy. Always practice safe lifting techniques adequate for the weight of the equipment.
• Always use the recommended number of screws to secure brackets to the UPS.
• Always use the recommended number of screws to secure the UPS to the rack.
• Always install the UPS at the bottom of the rack.
• Always install the XLBP below the UPS in the rack.
Failure to follow these instructions can result in equipment damage and minor or moderate injury
0
8
6
6
e
x4
x3
a
7
6
8
0
o
u
s
Smart-UPS On-2 Line SRTRK4 Tower to Rack-Mount Conversion 3