Schneider Electric SRTRK4 Installation Manual

Installation Guide Smart-UPS
su04
x4
x6
x8
On-Line
SRTRK4 Tower to Rack-Mount Conversion

Package Contents

Inspect the contents upon receipt. Notify the carrier and dealer if the unit is damaged.
One Rail Kit with instructions and hardware for installing rails in a rack.
34a
• 1 pair of rail cleats
• 8 screws to secure cleats to the UPS
SRTRK4 is compatible with all the variants of the following models:
• SRT1000
• 1 pair of rack-mount brackets
• 6 flat head screws to secure rack-mount brackets to the UPS
• 4 ornamental screws to secure rack-mount brackets to the rails
•SRT1500
RT2200
S
•SRT3000
Note: UPS and External Battery Pack (XLBP) models may differ in appearance from those depicted in these graphics. The installation process is identical for all models.

Tower to Rack-Mount Conversion of UPS

CAUTION
DAMAGE TO EQUIPMENT OR PERSONNEL
•The equipment is heavy. Each APCRBC152 battery module weighs 16.4 kg (36.2 lbs) and each APCRB tery module weighs 12.5 kg (27.6 lb). Each APCRBC155 battery module weighs 11 kg (24.25 lb).
bat
C141
•Always practice safe lifting techniques adequate for the weight of the equipment.
• Remove the battery modules before installing the UPS.
•Use the battery module handle to carefully slide the battery module in or out of the unit.
use the battery module handle to lift or carry the battery module.
Do not
• Place the UPS on a table to remove the stabilizer brackets.
• Always install the UPS at the bottom of the rack.
• Always install the XLBP below the UPS in the rack.
Failure to follow these instructions can result in equipment damage and minor or moderate injury.

suo0874 b
suo0875b

suo0873b
suo0872b
x3
Smart-UPS On-2 Line SRTRK4 Tower to Rack-Mount Conversion2
b
s
u
o
x3
5
4
8
0
u

b
1
7
8
0
o
u
s
s

Install UPS in Rack

Refer to the Rail Kit Installation Guide for instructions on rail installation.
CAUTION
DAMAGE TO EQUIPMENT OR PERSONNEL
• The equipment is heavy. Always practice safe lifting techniques adequate for the weight of the equipment.
• Always use the recommended number of screws to secure brackets to the UPS.
• Always use the recommended number of screws to secure the UPS to the rack.
• Always install the UPS at the bottom of the rack.
• Always install the XLBP below the UPS in the rack.
Failure to follow these instructions can result in equipment damage and minor or moderate injury

0
8
6
6
e
x4
x3
a
7
6
8
0
o
u
s
Smart-UPS On-2 Line SRTRK4 Tower to Rack-Mount Conversion 3

x4
x3
a
5
6
8
0
o
u
s
6
8
0
o
u
s

a
9
6
8
0
o
u
s
a
0
7
8
0
o
u
s
a
8
a
9
5
8
0
u
s
Smart-UPS On-2 Line SRTRK4 Tower to Rack-Mount Conversion4

Tower to Rack-Mount Conversion of UPS with one External Battery Pack


suo0 840b
suo0839b

suo0838b

suo0837b
Disconnect and remove the battery module from the UPS. See “Tower to Rack-Mount Conversion of UPS” on page 2.
suo0836b
suo0835b
Smart-UPS On-2 Line SRTRK4 Tower to Rack-Mount Conversion 5
c
x4
x3
s
u
o0818
d
s
uo0
4
3
8
0
o
u
s

Install UPS with one External Battery Pack in a Rack

UPS model may differ in appearance from those depicted in these graphics. The XLBP installation process is identical for all models.
Refer to the rail kit Installation Guide for instructions on rail installation.
CAUTION
DAMAGE TO EQUIPMENT OR PERSONNEL
•The equipment is heavy. Always practice safe lifting techniques adequate for the weight of the equipment.
•Always use the recommended number of screws to secure brackets to the XLBP.
• Always use the recommended number of screws to secure the XLBP to the rack.
•Always install the XLBP at the bottom of the rack.
•Always install the XLBP below the UPS in the rack.
• Use the battery module handle to slide the battery modules in or out of the XLBP.
not use the battery module handle to lift or carry the battery module.
Do
Failure to follow these instructions can result in equipment damage and minor or moderate injury.
• Secure two brackets to the XLBP. Use three screws for
each bracket.
Rest the XLBP on the rail shelves.
Slide the XLBP into the rack.
• Secure the cleat to the XLBP. Use four screws for each cleat.
Smart-UPS On-2 Line SRTRK4 Tower to Rack-Mount Conversion6
Secure the XLBP to the rack.
s
x6
Use two screws in each bracket.
Slide the left hand side battery module into the XLBP.
a
9
1
8
0
o
a
1
2
8
0
o
u
s
u
Slide the right hand side battery module into the XLBP.
8
0
o
u
s
Connect the two XLBP connectors from the enclosure to
the two RBCs. See “XLBP Connectors Installation” on page 8.
Secure the RBCs to the enclosure. Use three screws on
each RBC.
a
2
2
a
3
2
8
0
o
u
s
Install one XLBP bezel and one UPS bezel.
S
P
U
P
B
L
X
1
1
9
0
u
s
a
4
2
8
0
o
u
s
Smart-UPS On-2 Line SRTRK4 Tower to Rack-Mount Conversion 7
a

XLBP Connectors Installation

RBC
2
RBC
1
1
RBC
2
Connect the XLBP connector, labeled RBC 1, to the right hand side (RHS) RBC in rack-mount installation and to the top RBC in tower installation, when viewed from front.
Connect the XLBP connector, labeled RBC 2, to the left hand side (LHS) RBC in rack-mount installation and to the bottom RBC in tower installation, when viewed from front.
SRT1000/SRT1500
RBC 1
RBC 2
SRT2200/SRT3000
RBC
suo1233a
suo1097a
© 2017 APC by Schneider Electric. APC, the APC logo, and Smart-UPS are owned by Schneider Electric Industries S.A.S., or their affiliated companies. All other trademarks are property of their respective owners.
EN 990-5649B