Changing gas type ............................................ 20
Mandatory warning for CEE countries
Warning: This appliance is designed, approved and inspected to meet the requirements of the
English market. The identification plate located on the inside of the appliance certifies the origin
where the product was manufactured and the country for which it is intended.
If you see any exception to this rule, please contact your nearest Saunier Duval dealer.
Thank you in advance for your assistance.
2
INTRODUCTION
The ECOSY 24 E and ECOSY 28 E boilers are wall
mounted combination boilers providing central
heating and instantaneous hot water.
The ECOSY SB 24 E and ECOSY SB 28 E boilers are
wall mounted system boiler providing central
heating only.
The ECOSY 24 E and ECOSY SB 24 E boilers are of the
II2H3+ category for use with Natural Gas (G20) and
Liquide gas (G30 and G31)as distributed in the
United Kingdom.
The ECOSY 28 E and ECOSY SB 28 E boilers are of the
I2H category for use with Natural Gas (G20) as
distributed in the United Kingdom.
The boilers have a fan assisted balanced flue which
both discharges the products of combustion to and
draws the combustion air from the outside of the
room.
The boilers are suitable for top outlet flue connection
only but, can be fitted with horizontal flue, vertical
flue or twin-pipe flue. Refer to flue catalogue for
further details.
On ECOSY 24 E and ECOSY 28 E, both the central
heating and domestic hot water temperature are
user adjustable from the boiler control panel.
On the ECOSY 24 E and ECOSY 28 E, domestic hot
water demand always has priority over heating
demand.
The boiler is designed for use as part of a sealed
water central heating system with fully pumped
circulation. The pump, expansion vessel and
associated safety devices are all fitted within the
boiler.
The boiler can be installed against either an external
wall or on an adjacent inside wall, that is, the flue
system will pass directly to the rear or to either side
to the terminal fitted on the outside wall face.
The installation must be carried out by a competent
person in accordance with the relevant
requirements of The Building Regulations, The Water
Byelaws, The Building Standards (Scotland)
Regulations and any applicable local regulations.
These instructions should be carefully followed for
the safe and economical use of your boiler.
Ancillary equipment
A range of flue accessories are available including
vertical flues, twin-pipe flues, bends etc.
For further information contact your supplier.
On ECOSY SB 24 E and ECOSY SB 28 E, the central
heating temperature is user adjustable from the
boiler control panel.
COMMISSIONING
Gas safety (Installation and use) Regulations
In your interests and that of gas safety, it is the law
that ALL gas appliances are installed and serviced
by a competent person in accordance with the
above regulations.
Gas leak or fault
If a gas leak or fault exists or is suspected, turn the
boiler off and consult the local gas supply company
or your installation/service company.
Boiler controls
The control panel, located at the lower front of the
boiler casing, see diagram 1, allows the boiler to be
started, shut down, controlled and monitored during use.
Diagram. 1
OPENING THE CONTROL PANEL COVER
Ins 048a
Flue
Do not obstruct the outside terminal of the boiler.
Starting the boiler
Before starting the boiler check that:
- The gas meter tap is open.
- The boiler gas service cock is open.
- The boiler is connected to the electrical supply and
turned on.
3
CONTROLS AND LIGHTING
OFF
ON
OFF
ON
The control panel, located at the lower front of the boiler casing, see diagram 2, allows the boiler to be
started, shut down, controlled and monitored during use.
● The boiler is connected to the electrical supply.
● The boiler gas service cock is open.
● The pressure gauge reads between 1 and 2 bar.
06 5
5 - Display
6, 7, 8 and 9 - Program selection buttons
10 - Pressure gauge
7654312
MODE
Stopping the boilerStarting the boiler
➜ PUSH IN BUTTONIN
STOP THE BOILER
ENTER
SETPC
98
2
SUMMER POSITION
10
2
bAR
1
3
4
O
IMIT
Hab 197a
TO
➜ PUSH IN BUTTONTO START BOILER
1
➜
ON
SETTING TO SUMMER MODE
(Hot water only)
➜ PUSH BUTTONTOPOSITION TO SET THE
BOILER TO SUMMER MODE
2
OFF
➜
ON
OFF
➜
To ensure maximum life of the boiler control
system, it is recommended that the mains is left
switched on all the time. Power consumption
during stand by is only 7 to 8 watts.
SETTING TO WINTER MODE
(heating and hot water)
➜ PUSH BUTTONTOPOSITION
BOILER TO WINTER MODE
2
TO SET THE
➜
To obtain domestic hot water, open a hot water
tap.
4
Assuming that any remote heating controls are
calling for heat, the above procedure is all that
is required to start the boiler in heating mode.
Hot water has priority over heating.
CONTROLS AND LIGHTING
Setting domestic hot water temperature
1 - Press «Mode» button once
mode
➭➭
1.6 5
set
2.6 5
➜
2 - Press «+» or «-» button to set the desired hot water temperature from 40°C to 65°C
(factory set at 65°C)
+
3 - Press «enter» until the display starts flashing, and press «mode» twice : the boiler is now
operational at the desired hot water temperature.
enter
Note : On the SB versions, this setting is done using the tank thermostat in the tank.
1 - Press «Mode» button once 2 - Press «Set» button 4 times to show 5 on the left
-
2.60
set
Setting heating temperature
➭
2.60
➜
twice
➭➭
1.6 5
Hab 198a
1.60
-
➭
3 - Press «+» or «-» button to set the desired heating temperature from 20°C to 90°C
(factory set at 70°C)
➭➭
mode
4 - Press «enter» until the display starts flashing, and press «mode» twice : the boiler is now
operational at the desired heating temperature.
Note :
1/ In case of under floor heating systems, the CH flow temperature can be set to between 20°C and
45°C - contact
In all cases, by pressing the «Mode» button until the decimal point disappears, the display reverts to
normal position :
+
the Saunier Duval Technical Helpline 01773 828400.
1.6 5
-
➭
06 5
set
6.85
No decimal point displayed
mode
6.7 0
twice
Hab 198a
5
BOILER OPERATING MODES AND DISPLAY READINGS
The Ecosy display has three display modes :
A - Reading mode only - this gives information about the operation in progress.
B - Programming mode - this allows the user to change selected settings of the boiler.
C - Diagnostic mode - this allows the user to check selected temperatures during boiler operation.
A- Reading mode only
06 5
During boiler operation, the display gives information about the operation in progress (left
hand digit) and the temperature of that
operation (right hand digits).
0 - No demand➜
1 - Safety purge➜
2 - Ignition➜
3 - Boiler on - central heating➜
4 - Boiler on - hot water➜
5 - Waiting for closing air pressure switch ➜
6 - Boiler off after reaching temp.➜
7 - Pump overrun after heating➜
8 - Pump overrun after hot water➜
9 - Boiler safety shut down➜
No decimal point displayed
Flow temperature
06 5
16 5
26 5
36 5
46 5
56 5
66 5
76 5
86 5
96 5
Hab 206
C - Diagnostic mode :
set
1.7 0
➭
1.7 0
➭
3.5 0
Flashing decimal point displayed
Allows the user to check selected temperatures
during boiler operation.
1 - Press «Mode» button twice : The number 1
will be displayed with a flashing decimal point
after it.
mode
2 - Press «Set» button to select the setting that
you wish to check (see table below).
1 - Central heating flow temperature
2 - Central heating return temperature
3 - Cylinder temperature
4 - Not applicable
5 - Not applicable
6 - Not applicable
7 - Calculated temperature set
8 - Temperature rise of central heating flow
9 - Temperature rise of cylinder
Reg 025
B - Programming mode
Five settings of the boiler can be changed by
the user.
1 - Press «Mode» button once : The number 1
will be displayed with
a decimal point after
it.
2 - Press «Set» button to select the setting that
you wish to change (see table below).
ProgrammeSetting
1 ➜ Domestic hot water temperature ............................... adjustable from 40°C to 65°C (factory set at 65°C)
2 ➜ Domestic hot water comfort level...............................factory set at 02 - do not adjust
3 ➜ Pump operation.............................................................00 = do not use
4 ➜ Heating economy .......................................................... factory set at 02 - do not adjust
5 ➜ Heating flow temperature ............................................ adjustable from 20°C to 90°C (factory set at 70°C)
mode
set
➭
➭
1.7 0
1.7 0
3.0 0
Decimal point displayed
3 - Press «+» or «-»
button to adjust
the settings according to the table below
4 - Press «Enter» button and then press «Mode»
button twice to exit from the programming
mode into the display mode.
enter
-
2.60
➭
set
3.01
➜
➭➭
1.6 5
6
DRAINING
Protection against freezing
If the boiler is to be out of use for any long periods
during severe weather conditions, it is
recommended that the whole system, including the
boiler, be drained to avoid the risk of freezing.
If in doubt, consult your servicing company.
The ECOSY boilers have a built in frost protection
device that protects the boiler from freezing. If the
boiler is to be left and there is a risk of frost, ensure
that the gas and electrical supplies are left
connected and that the ON/OFF switch is left in the
ON position.The frost protection device will switch
the pump when the temperature of the boiler water
falls below 7°C and light the boiler when the
temperature falls below 3°C. When the temperature
reaches 10°C, the boiler stops. The pump will run
again 15 minutes.
Note: This device works irrespective of any room
thermostat setting and only protects the boiler.
Always ensure that adequate frost protection is
given to the entire system where necessary.
Draining and filling
Caution: The boiler is installed as part of a sealed
system which must only be drained and filled by a
competent person.
Heating safety valve
CAUTION: A safety valve with a discharge pipe is
fitted to these boilers.
The valve MUST NOT BE TOUCHED except by a competent person. If the valve discharges at any time,
switch the boiler off and isolate it from the electrical
supply. Contact your installation/service company.
SERVICING/MAINTENANCE
To ensure the continued efficient and safe operation of the boiler, it is recommended that it is
checked and serviced at regular intervals. The frequency of servicing will depend upon the installation conditions and usage but, in general, once a
year should be enough.
Cleaning
The boiler casing can be cleaned with a damp cloth
followed by a dry cloth to polish.
Do not use abrasive or solvent cleaners.
Boiler casing
CAUTION. Do not remove or adjust the casing in any
way, as incorrect fitting may result in faulty operation. If in
7
TECHNICAL DATA
24 E
ECOSY SB
ECOSY 24 E
Heating outputautomatically adjustable from (kW)6,86,88,98,9
Efficiency(%)98,998,997,597,5
Part load efficiency 30% (50°C/30°C)(%)109,3109,3106,8 106,8
Maximum heating temperature(°C)90909090
Expansion vessel effective capacity(l)712712
Expansion vessel charge pressure(bar)0,510,51
Maximum system capacity at 75°C(l)150215150215
Safety valve, maximum service pressure(bar)3333
Products outlet(mm)Ø 60Ø 60Ø 60Ø 60
Fresh air inlet(mm)Ø 100 Ø 100Ø 100 Ø 100
Hot water outputautomatically variable from (kW)6,8—8,9—
Maximum hot water temperature(°C)65—65—
Specific flow rate (for 30°C temperature rise)l/min11,4—13,3—
Maximum supply pressure(bar)8—8—
Electrical supply(V)230230230230
Maximum absorbed power(W)115115132132
to (kW)24,524,528,828,8
from (Btu/H)23217 2321730386 30386
to (Btu/H)83649 8364998330 98330
to (kW)24—28,8—
from (Btu/H)23,21—30386—
to (Btu/H)81,89—98330—
ECOSY SB
ECOSY 28 E
28 E
Natural gas (G20)
Ø Burner injector(mm)4,94,95,65,6
Supply pressure(mbar)20202020
Gas rate (maximum)(m3/h)2,62,63,03,0
Gas rate (minimum)(m3/h)0,70,70,90,9
Liquide gas (G30/G31)
Ø Burner injector(mm)4,154,15//
Supply pressure(mbar)2830/37//
Gas rate (maximum)(m3/h)0,860,86//
Gas rate (minimum)(m3/h)0,360,36//
Pump :
Note : Curves 1,2 and 3 correspond to each of the three pump speed settings.
ECOSY 24 E, ECOSY SB 24 EECOSY 28 E, ECOSY SB 28 E
70
50
40
30
20
10
heating flow and return
Available pressure between
0
Diagram 3
3
2
1
50010001500
flow rate through heating system (l/h)
(10 kPa = 1 mWG)
heating flow and return
Available pressure between
Pom 043 c
60
50
40
30
20
10
2
0
500100015002000
flow rate through heating system (l/h)
Pom 048
8
DIMENSIONS
Diagram 4
The boiler is delivered in three
separate packages :
- the boiler itself
- the fixing jig
- the flue system
ECOSY 24 E
Net weight : 68 kg
Gross weight : 72 kg
201,5
227
ECOSY SB 24 E
Net weight : 58 kg
Gross weight : 62 kg
ECOSY 28 E
Net weight : 73 kg
Gross weight : 87 kg
ECOSY SB 28 E
Net weight : 63 kg
Gross weight : 77 kg
9-Electronic control box
10 - Gas valve
11 - Condense drain
12 - Pressure gauge
13 - Pump
14 - 3-way valve (ECOSY 24 E/28 E only)
15 - Expansion vessel
16 - Cylinder (ECOSY 24 E/28 E only)
17 - Cylinder automatic air vent
(ECOSY 24 E/28 E on&ly)
18 - Central heating return thermistor
19 - Domestic hot water thermistor
(ECOSY 24 E/28 E only)
373
3
4
5
6
8
7
9
10
890
890 (Ecosy 24 E/SB 24 E)
985 (Ecosy 28 E/SB 28 E)
140
520
Hab 204a
2
➞
➞
1
17
16
15
18
19
14
13
11
12
Hab 205
9
CONNECTION PLATE
ECOSY 24 E, ECOSY 28 E
From left to right, the connection plate is equipped with:
A - Heating return with isolating valve (m).
B - Cold water inlet with isolating valve (p).
C - Heating flow with isolating valve (q), drain screw (r)
and safety valve (s).
D - Domestic hot water outlet.
E - Electrical connector.
F - Gas service cock.
55
2
1
A
B
Diagram 6
113
m
p
3
C
r
4
D
q
s
5
6
F
23
34
55
57,5
25
33
57,5
ECOSY SB 24 E, ECOSY SB 28 E
From left to right, the connection plate is equipped with:
A - Heating return with isolating valve (m).
C - Heating flow with isolating valve (q), drain screw (r)
and safety valve (s).
E - Electrical connector.
F - Gas service cock.
110
25
Diagram 7
A
Pla 144a
113
m
2
1
p
r
5
C
q
s
7
F
23
E
Filters and washers :
1 - Fibre washer
2 - Metal filter
3 - Plastic filter
4, 5 & 6 - Black graphite
115
Pla 202
E
PIPING SYSTEM INSTALLATION
Heating system connections - Pipe diam 22 mm
● Hot water system connections (ECOSY 24 E/ 28 E
only) - Pipe diam 15 mm
● Gas connection - Pipe diam 22 mm
● Safety valve discharge - Pipe diam 22 mm
Water connection
Connect the copper tails and isolating cocks supplied, to the boiler, see diagram 6 or 7. Connect the
system pipework to the boiler observing the correct
flow and return format as shown in diagram 6 or 7.
Safety valve discharge
WARNING. It must not discharge above an entrance
or window or any type of public access area.
Connect the safety valve discharge pipe to the
boiler, the discharge must be extended using not
less than 15 m o.d. pipe, to discharge in a visible
position outside the building, facing downward preferably over a drain. The pipe must have a continuous fall and be routed to a position so that any discharge of water, possibly boiling or steam, cannot
create any danger to persons, damage to property or external electrical components and wiring.
Tighten all pipe connection joints.
Connect the safety valve discharge pipe to the
boiler, the discharge must be extended using not
less than 15 m o.d. pipe, to discharge in a visible
position outside the building, facing downward preferably over a drain. The pipe must have a continuous fall and be routed to a position so that any discharge of water, possibly boiling or steam, cannot
create any danger to persons, damage to property or external electrical components and wiring.
Tighten all pipe connection joints.
Gas connection
● The supply from the governed gas meter must be
of adequate size to provide a constant inlet working pressure of 20 mbar (8 in w.g.).
To avoid low gas pressure problems, it is recommended that the gas supply is connected using 22
mm pipe.
● On completion, the gas installation must be tested
using the pressure drop method and purged in accordance with the current issue of BS6891.
Gas Safety (Installation and use) Regulations
In your interests and that of gas safety, it is the law
that ALL gas appliances are installed and serviced
by a competent person in accordance with the
above regulations.
10
HEATING SYSTEM DESIGN
● The ECOSY boilers are compatible with any type
of installation.
● Heating surfaces may consist of radiators, con-
vectors or fan assisted convectors.
● Pipe sectional areas shall be determined in ac-
cordance with normal practices, using the output/
pressure curve (diagram 3). The distribution system
shall be calculated in accordance with the output
requirements of the actual system, not the maximum output of the boiler. However, provision shall
be made to ensure sufficient flow so that the temperature difference between the flow and return
pipes be less than or equal to 20°C. The minimum
flow is 400 l/h.
● The piping system shall be routed so as to avoid
any air pockets and facilitate permanent venting
of the installation. Bleed fittings shall be provided
at every high point of the system and on all radiators.
● The total volume of water permitted for the heat-
ing system depends, amongst other things, on the
static head in the cold condition. The expansion
vessel on the boiler is pressurised at :
Ecosy 24 E/28 E :0,5 bar (corresponding to a static
head of 5 m w.g.) and allows a maximum system
volume of 150 l.
Ecosy SB 24 E/SB 28 E :1 bar (corresponding to a
static head of 10 m w.g.) and allows a maximum
system volume of 215 l,
for an average temperature of 75°C and a maxi-
mum service pressure of 3 bar. This pressure setting
can be modified at commissioning stage if the static
head differs. An additional expansion vessel can be
fitted to the system if required, see diagram 8.
● Provision shall be made for a drain valve at the
lowest point of the system.
● Where thermostatic radiator valves are fitted, not
all radiators must be fitted with this type of valve,
and in particular, where the room thermostat is installed.
● In the case of an existing installation, it is ESSEN-
TIAL that the system is thoroughly flushed prior to in-
stalling the new boiler using a propietary cleanser
such as
mended that an inhibitor
to the system in accordance with the recommendations of Betz-Dearbourn Ltd., Foundry Lane
Widnes, Cheshire WA8 8UD.
Filling the system
Provision must be made for filling the system at low
level. The use of a WRC approved filling loop is
strongly recommended, connected as shown in dia-
gram 8.
Sentinel X 400
. In addition, it is recom-
Sentinel X 100
, is added
Diagram 8
Additional
expansion
vessel
(if required)
Return
Heating
circuit
Flow
control valve
Boiler
Bypass
valve
Domestic
water
Hot
Cold supply
Filling device
Drain point
11
Sch 173a
DOMESTIC HOT WATER SYSTEM DESIGN
ECOSY 24 E/ 28 E only
● Copper tubing must be used for the domestic hot
water system. Unnecessary pressure losses should be
avoided.
● A flow restrictor is factory fitted in the cold water
inlet before the thermostatic valve. This limits the flow
through the boiler to a maximum of 12 l/min.
BOILER LOCATION
Clearances
The position of the boiler must be such that there is
adequate space for servicing.
The recommended clearances are:
40 mm either side of the boiler.
600 mm at the front of the boiler.
300 mm below the boiler.
Fixing jig
The fixing jig comprises three parts:
1) The connecting plate which allows the connection and soundness testing of all the pipework before the boiler is fitted and helps support the weight
of the boiler.
2) The hook which supports the weight of the boiler.
3) The template which ensures the hook and connecting plate are correctly fitted relative to one
another.
● Place template on wall in required position, mak-
ing allowances for the necessary clearances etc.
Note: It is permissible to install the boiler with reduced
clearances at the bottom and sides of the boiler
PROVIDING that adequate consideration is given
for Servicing/Repairs at a later date. If any doubt
exists, contact the Saunier Duval Technical Helpline
01773 828400.
● Mark the position of the holes for the hook and
connecting plate.
● Drill, plug and fix the connecting plate and hook
to the wall using suitable screws.
● Check that both the hook and connecting plate
are level.
If the boiler is not installed immediately, protect the
various couplings to prevent any ingress of foreign
materials e.g. plaster, paint etc.
Hard water areas
The temperatures within the heat exanger are
limited by the boiler control system to minimise scale
formation within the hot water pipework.
However, areas where the water is "hard" (i.e. more
than 200 mg/litre), it is recommended that the
domestic hot water temperature is reduced to 55°C
or below. Refer to the Controls and lighting section
to reset the domestic hot water temperature.
It is also recommended that a scale reducer is fitted.
Refer to the manufacturers instructions or consult the
local water company for additional advice.
33
201,5
40 mini
Diagram 9
3%
Ø A
Ø A
Ø A
Ø A
Ø A
Ø B
Ø B
Ø B
201,5
40 mini
42
10365
Terminal position
The minimum acceptable spacings from the terminal to obstructions and ventilation openings are
shown in diagram 10.
The boiler must be installed so that the terminal is
exposed to the external air.
Should any doubt exist as to the permissible position of the terminal, contact the Saunier Duval Tech-
nical Helpline 01773 828400.
Cupboard or compartment ventilation
The boiler can be fitted in a cupboard or compartment as long as adequate permanent high and low
level ventilation is provided in accordance with
ventilation requirements
Ins 033AT
Diagram 10
Minimum dimensions (in mm) for the positioning of flue terminals
A-under a window ............................................ 300
B-under an air vent .......................................... 300
C-under a gutter ................................................. 75
D-under a balcony ........................................... 300
E-from an adjacent window........................... 300
F-from an adjacent air vent ........................... 300
G-from vertical or horizontal air pipes ............... 300
H-from an external corner of the building ..... 300
I-from an internal corner of the building ...... 300
L-from the ground or from another floor ........... 300
M-between two terminals vertically .............. 300
N-between two terminals horizontally ........... 600
12
G
C
N
E
F
M
A
B
D
I
L
H
Ven 060b
BOILER INSTALLATION
Statutory requirements
The installation of this boiler must be carried out by
a competent person in accordance with the relevant requirements of the current issue of:
The Gas Safety (Installation and Use) Regulations
The Building Regulations
The local water company Byelaws
The Building Standards Regulations (Scotland)
The Health and Safety at Work Act
Sheet metal parts
WARNING. When installing or servicing this boiler,
care should be taken when handling the edges of
sheet metal parts to avoid the possibility of personal
injury.
Installing the boiler
Prior to starting work, the system must be thoroughly
flushed so as to eliminate any foreign bodies and
contaminants such as filings, solder particles, oil,
grease etc.
Note. Solvent products could cause damage to the
system.
● Engage boiler upper part onto the hanging
bracket.
● Allow the boiler to seat down onto support plate.
● Fit filter and washers, strictly adhering to the se-
quential order and directions shown on diag. 6
(Ecosy 24 E/28 E) or diag. 7 (Ecosy SB 24 E/SB 28 E).
● Connect the various couplings between boiler
and connection plate.
● Fit water trap supplied (diagram 11) to the con-
dense outlet located underneath and to the left rear
of the boiler. The outlet of the trap must then be
connected to the household drainage system via
a suitable water trap, such as a washing machine
type trap.
BEFORE STARTING THE BOILER, THE TRAP MUST BE
FILLED WITH WATER.
Diagram 11
Hose to be connected to
a drain
Ins 030
227
201,5
Ø 80
120
201,5
227
120
Ø 80
Diagram 12
Hab 212a
13
FLUE INSTALLATION
The boiler is only suitable for top outlet flue
connection.
A - Flue to rear of boiler
● Mark correct position of hole from template.
B - Flue to side of boiler
● Mark the horizontal centre line for the hole on the
rear wall. Extend the horizontal centre line to the
side wall and mark the vertical centre line of flue
hole as shown in diagram 13.
Under normal circumstances, it will be possible to gain
access to the outside of the building to fit the flue
terminal assembly. Where outside access is not possible e.g. high rise buildings, the flue terminal can be
fitted from inside the building only if required.
Important : When cutting the flue hole and when
extending the flue centre line to a side wall,
remember that the flue system must have a fall of
about 35 mm per metre of flue DOWNWARD
TOWARDS the boiler. There must NEVER be a
downward incline towards the terminal.
Cutting the flue hole
● Making allowance for the slope of the flue, cut
hole in external wall, preferably using a core drill.
For installations with internal and external access Use a 105 mm diameter core drill.
For installations with internal access only - Use a 125
mm diameter core drill.
Important : Before cutting the hole for flues to the
rear of boiler, always cover fixing jig to make sure it
is not damaged.
201,5
40 mini
Diagram 13
10365
33
3%
Ø A
Ø A
Ø A
Ø A
Ø A
Ø B
Ø B
Ø B
201,5
40 mini
42
Ins 033AT
Calculation of flue cutting lengths
● Measure wall thickness e (mm), see diagram 14.
● For side flues, measure distance from inside face
of side wall to centre line of flue and subtract 293
mm for right hand flue or subtract 227 mm for left
hand flue to get dimension a (mm).
● Refer to table 1 for cutting lengths of both inner
and outer flue pipes for each of the various flue
options available.
Important : All flue cutting lengths must be measured
from the terminal end of the flue pipes, see diagram
15.
When the dimension X measured on site is greater
than that given in table 1, a flue extension kit will be
required, refer to table 2 for details.
Diagram 15
Outer pipe
Cutting length
Terminal end
Inner pipe
Cutting length
Ven 089a
a
X
a
X
Diagram 14
Table 1
Flue optionCutting length (mm)Comments
Rear fluee + 196e + 271maximum wall
Side flue left e + a + 222 e + a + 297maximum
Side flue right e + a + 288 e + a + 363maximum
outer pipe inner pipe
thickness "e" without
extension 554 mm
distance "X" without
extension 755 mm
distance "X" without
extension 755 mm
Table 2
Flue optionDimension "X"N° of
Side flue756 to 1756 mm1
left or right1757 to 2757 mm2
extension kits
ee
Hab 210b
14
FLUE INSTALLATION
Extended flue
The horizontal flue is extended by using one or more
of the 1000 mm extension pipes part number 85452.
These are connected together by push fit type joints.
Calculation of flue cutting lengths for extended flue
● Using the correct number of extension kits as ta-
ble 2, measure dimensions a and e, see diagram
14. Cut both the inner and outer pipe to the dimen-sion given in table 3.
Important : All cutting lengths should be measured
from the push fit joint end of the extension pipe. Do
not leave any burrs or sharp edges on the cut end
of the pipes.
Installation of flue assembly (see diagram 16)
● Fit rubber sealing collar (A) into groove at the outer
end of pipe (B).
● For internal access only installation, that is with 125
mm diameter hole, fit rubber spacer (D) to outer
flue to support flue in wall.
Table 3
Flue optionCutting length (mm)Comments
Side flue left e + a - 493 e + a - 483maximum
Side flue right e + a - 427 e + a - 417maximum
outer pipe inner pipe
dimension "X" without
extension 755 mm
dimension "X" without
extension 755 mm
Diagram. 16
● Fit outer pipe (B) into wall with line marked on flue
uppermost and groove to the outside.
● Pull pipe inwards to bring rubber sealing collar hard
up against external wall.
● For both internal and external access installation,
fit the rubber sealing flange (C) against the inside
wall.
● From inside, insert inner pipe (E) into outer pipe,
ensuring that groove on terminal end of pipe engages into tongue on outer pipe end cap.
● Engage boiler upper part onto hanging bracket,
● Allow boiler to seat down onto support plate,
● Fit filters and washers, strictly adhering to the
sequential order and directions shown on diagram
6 or 7. Connect the various couplings between boiler
and connection plate.
● From inside boiler, remove wire clip on flue adap-
ter pipe. Push adapter pipe down into flue outlet
pipe, see diagram 17.
AEBDCFG
Ven 094b
Diagram. 17
● Fit rubber air inlet dome (F) to elbow, engaging it
on the outer part.
● Fit elbow ( G) onto inner and outer flue ensuring
inner flue is correctly engaged into elbow.
Note : To allow easier engagement of elbow onto
flue, use a small quantity of silicone grease.
● Secure rubber air inlet dome (F) to top of boiler
with plate and screws.
● Push flue adapter pipe up and engage it onto
inner part of elbow. Refit wire clip
Ins 047
15
ELECTRICAL CONNECTION
Warning. This boiler must be earthed
All system components must be of an approved type.
Connection of the whole electrical system and any heating system controls to the electrical supply must be through
a common isolator.
Isolation should preferably be by a double pole switched
fused spur box having a minimum contact separation of 3
mm on each pole. The fused spur box should be readily
accessible and preferably adjacent to the boiler. It should
be identified as to its use.
A fused three pin plug and shuttered socket outlet may be
used instead of a fused spur box provided that:
a) They are not used in a room containing a fixed bath or
shower.
b) Both the plug and socket comply with the current issue
of BS1363.
The mains electrical supply must be maintained at all times
in order to provide domestic hot water.
Do not interrupt mains supply with time switch/programmer.
WARNING: ON NO ACCOUNT MUST ANY EXTERNAL VOLTAGE BE APPLIED TO ANY OF THE TERMINALS ON THE HEATING
CONTROLS CONNECTION PLUG.
Warning: This appliance must be wired in accordance with
these instructions. Any fault arising from incorrect wiring
cannot be put right under the terms of the Saunier Duval
guarantee.
External controls
The ECOSY condensing boilers are designed to operate at
maximum efficiency at all times. The boiler will run at its’
maximum efficiency when connected to a programmable electronic room thermostat. A programmable room
thermostat is available as an accessory, Saunier Duval
part number 40010. Please contact your supplier.
The boiler will work for heating without a room thermostat and/or timeswitch being connected provided that
the wire link fitted between the upper two terminals of
the connector is left in place, see diagram 18 a.
A 230V room thermostat can be used but do not make
any connection to the compensating resistor, see dia-
gram 18a.
ON NO ACCOUNT must any electrical voltage be applied
to any of the terminals of the external controls plug.
For use with a timeswitch or timeswitch and room thermostat, see diagram 18 a.
ECOSY SB 24 E/SB 28 E
The boiler will work for heating without a room thermostat and/or timeswitch being connected provided that
the wire link fitted between the top two terminals of the
connector is left in place, see diagram 18 b.
A 230V room thermostat can be used but do not make
any connection to the compensating resistor, see diagram 18b.
ON NO ACCOUNT must any electrical voltage be applied to any of the terminals of the external controls plug.
A voltage free storage cylinder thermostat, where fitted,
should be connected to the lower two terminals of the
external controls plug, see diag. 18 b.
ON NO ACCOUNT must any electrical voltage be applied to any of the terminals of this plug.
Warning:
- All external controls must be voltage free
- On no account must any external voltage be applied to any of the external controls plug terminals
Diagram 18aDiagram 18b
ECOSY 24 E, ECOSY 28 E
ECOSY SB 24 E, ECOSY SB 28 E
No external controlsNo external controls
Factory
fitted link
Boiler
connector
Room thermostat only
External controls
Voltage free room
thermostat
Room thermostat only
External controls
plug
Voltage free room
thermostat
plug
Do not
connect
Room thermostat and time clock
Time clock
Voltage free room
thermostat
Timeclock, room thermostat and cylinder thermostat
External
controls
plug
Time clock
Factory
fitted link
Do not
connect
Voltage free
room thermostat
16
External
controls plug
Do not
connect
Voltage free
cylinder
thermostat
Do not
connect
Sch 070UK
COMMISSIONING
The commissioning and first firing of the boiler must
only be done by a competent person.
Gas installation
It is recommended that any air is purged from the
supply at the gas inlet test point on the lower right
hand side of the gas valve, see diagram 19.
Filling the system
● Open shut off valves (see diag. 6 or 7 as appropri-
ate) (slot of screw corresponds to flow direction), and
caps on automatic air vents on top RHS of boiler.
● Bleed each radiator until a continuous jet of water
is obtained.
● Do not close automatic air vent caps on top of
boiler.
● Open various hot water taps to bleed system.
● Make sure that pressure gauge reads between 1
and 2 bar. Re-pressurise system as necessary.
Important:
- When venting air from boiler, do not touch the
schrader valve on the expansion vessel, it is NOT a
vent.
- When the mains supply is connected to the boiler,
or after a reset, the three way valve (Ecosy 24 E andEcosy 28 E only) is activated for approx. 15 seconds
and switched to the heating circuit. The pump will
run for 1 minute. After this period, the three way valve
returns to the cylinder circuit.
- If, during a 24 hour period, there has been no heating demand, the above procedure is automatically
repeated. This is quite normal and is a function of the
electronic control to prevent the possibility of the
valve and pump sticking.
Starting the boiler
Before starting the boiler check that:
- The gas meter tap is open.
- The boiler gas service cock is open.
- The boiler is connected to the electrical supply.
First starting up
● Following the instructions given in the 'Controls and
Lighting' section, set boiler to run in central heating mode.
● Set room thermostat for maximum temperature and
check that external controls, if fitted, are calling for heat.
● Allow the temperature to rise to the maximum val-
ue, with all radiator valves open.
Note: The Ecosy boilers start at reduced output for 10
minutes before running at full output. This is a function
of the adaptive electronic boiler control and is quite
normal.
perature is reached. Shut down boiler and vent heating system. If necessary, top up heating system and
make sure that a pressure of 1 bar is indicated on the
pressure gauge when system is COLD.
Gas pressures
The Ecosy boilers are fully automatic in operation,
adjusting the gas rate to the optimum for the type of
system and conditions. It is not possible to manually
adjust the burner pressure but it is necessary to ensure that there is a constant inlet working pressure of
20 mbar measured at gas valve. Proceed as follows:
● Shut down boiler.
● Undo screw on gas inlet test point on lower right
hand side of gas valve, seediagram 19.
● Connect a suitable pressure gauge.
● Start boiler as described in 'Instructions for Use'.
To check the inlet working pressure, the boiler has to
be held at full gas rate. Proceed as follows:
● Press the 'Mode' and '+' buttons simultaneously - the
letter H is displayed and the boiler is now running at
full gas rate.
● Check that there is a pressure of 20 mbar (G20), 28-
30 mbar (G30), 37 mbar (G31).
If the pressure is insufficient, it is necessary to check
the gas supply/pipework and correct any fault.
Note. The central heating operation of the boiler may
seem to operate correctly with less inlet working
pressure but the economy of the boiler will not be
optimum. In any case, an insufficient inlet pressure
will adversely affect hot water performance.
● Press the 'Reset' button. The boiler will revert to nor-
mal running, that is, will not be held at full gas rate.
Note.
1) After a period of 20 minutes, the boiler will auto-
matically revert to normal running.
2) During full gas rate operation, all safety devices
can function fully.
● Shut down boiler.
● Remove pressure gauge, tighten up test point screw
and check for gas soundness.
Diagram 19
b
The temperature rise will cause release of the gases
contained in the water of central heating system.
- Gases driven towards the boiler will be automatically released through the automatic air vents.
- The gases trapped at the highest point of the system must be released by bleeding the radiators.
On reaching maximum temperature, the boiler should
be turned off and the system drained as rapidly as
possible whilst still hot.
● Refill system to a pressure of 1 bar and vent as be-
fore.
● Restart boiler and operate until a maximum tem-
Reg 026
17
OPERATING SAFETY DEVICES
Gas leak or fault
If a gas leak or fault exists or is suspected, turn the
boiler off and consult the local gas undertaking or
your installation/servicing company.
In case of power supply failure
The boiler no longer operates.
As soon as power supply is restored, the boiler will
be automatically restarted.
In case of loss of water in the system
CAUTION :The boiler is installed as part of a sealed
system which must only be drained and filled by a
competent person.
If the pressure shown on the pressure gauge
(diagram 20) is less than 1 bar or if the number 12 is
shown on the flashing display, the
system must be filled up immediately.
Call the nearest after sales service
department.
Important notice : A central heating system cannot
operate satisfactorily unless it is properly filled with
water and unless the air initially contained in the
piping systems has been properly bled off. If these
conditions are not satisfied, air noise will occur within
the system.
Air in the heating system
Persistent air in the heating system may indicate
leaks in the system or corrosion taking place. Call
the nearest after sales service department.
Overheating safety
There are four overheat safety functions :
01 2
attempt to relight. If the fault persists after 20
attempted relights, the boiler shuts down and
requires a manual reset. Check pump speed and
flow rate of the circulating system.
3) If the central heating flow temperature exceeds
100°C, the boiler shuts down and requires a manual
reset. The right-hand digits of the display will show
18. - Check that the pump is operating, the central
heating isolating cocks are open and that there is
circulation in the system.
4) If the central heating return temperature exceeds
95°C, the boiler shuts down and requires a manual
reset. The right-hand digits of the display will show
19. - Check that the pump is operating, the central
heating isolating cocks are open and that there is
circulation in the system.
In case of boiler safety shut down, press the reset
button
Frost protection
The Ecosy has a built in protection device that
protects the boiler from freezing. If the boiler is to
be left and there is a risk of frost, ensure that the gas
and electrical supplies to the boiler are left
connected. The frost protection device will light the
boiler when the temperature of the boiler water falls
below 3°C. When the temperature reaches 10°C,
the boiler stops.
Note : This device only protects the boiler. Always
ensure that adequate frost protection is given to the
system where necessary.
1) If the water temperature inside the boiler
increases at greater than 4°C per second, the boiler
will stop for 10 minutes. The display will show 9
alternaded with E 25. After this time, the boiler will
attempt to relight. If the fault persists after 5
attempted relights, the boiler shuts down and
requires a manual reset. The display will show 9 25
blinking. - Check that the pump is operating, the
central heating isolating cocks are open and that
there is circulation in the system.
2) If the temperature difference between the central heating flow and return pipes exceeds 40°C, the
boiler will stop for 2,5 minutes. The display will show
9 alternaded with E 30. After this time, the boiler will
Diagram 20
Hab 196
18
SETTINGS
Gas valve setting
All boilers are tested and factory set during manufacture. Should it be necessary to reset a gas
valve, for example after replacement, proceed
as follows :
● Shut down boiler.
● Connect a CO2 analyser to the combustion test
point on the products outlet from the heat
exchanger, see diagram 21.
Alternatively, connect a CO2 analyser to the combustion test point on the flue elbow.
● Start the boiler.
● Press the «Mode» and «+» buttons simultaneously,
the letter H is displayed and the boiler is now running
at high gas flow rate.
● Allow the boiler to run for a few minutes to stabi-
lise and check the CO2 value, refer to table 4.
● At the 28E and SB28E the CO2 at high gas flow
rate is automatically controlled.
● At the 24E and SB24E the CO2 at high gas flow
rate can be adjusted. To adjust the CO2, turn the
gas valve adjuster until the correct CO2 value is
obtained according to table 4.
● Press the «Mode» and «-» buttons simultaneously,
the letter L is displayed and the boiler is now running
at low gas flow rate.
Allow the boiler to run for a few minutes to stabilise
and check the CO2 value, refer to table 4.
● To adjust the CO2, remove protective cap (b) from
the gas valve, see diagram 22. Turn the gas valve
adjuster until the correct CO2 value is obtained
according to table 4.Note :This adjustment must only be carried out by a
suitably qualified engineer.
Diagram 21
Ins 046
Diagram 22
b
Reg 026
Diagram 23
Bypass
The built-in bypass must be adjusted according to
the requirements of the system. Refer to the flow
a
rate pressure curve (diagram 3) The boiler is supplied
with the built-in bypass open a half a turn. It is
adjusted by turning the bypass screw (a), seediagram 23. Turn the screw clockwise to close the
bypass.
When using thermostatic radiator valves (TRV’s), a
separate adjustable bypass of 15 mm minimum
diameter must be fitted between the flow and return
of the heating circuit. Any bypass must be fitted
before system controls.