Saunier Duval Bulex Ecosy SB 28E,Bulex Ecosy 28E,Bulex Ecosy 24E,Bulex Ecosy SB 24E Instructions Manual

GAS VALVE (HONEYWELL)
IMPORTANT NOTE
THESE INSTRUCTIONS SUPERCEDE
THE GAS VALVE SETTING PROCEDURE CONTAINED
WITHIN THE ORIGINAL APPLIANCE LITERATURE.
MODEL
Ecosy SB 28E Ecosy 28E
KIT Pt. No. 05632900
incl. 1 off “O” ring 4 off screws
0020096286
MODEL
Ecosy 24E Ecosy SB 24E
KIT Pt. No. 05617100
- 3 -- 2 -
Requirements
It is the Law that any replacement of parts is carried out by a competent person approved at the time by the Health and Safety Executive. Before commencing with the replacement of a part the boiler should be isolated from the electrical supply and the gas supply should be turned off at the gas isolation valve. When replacing a part, use only spare parts that you can be assured conform to the safety and performance specication that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Saunier Duval. After electrical connections have been made, checks to the earth continuity, polarity, short circuit and resistance to earth must be repeated using a suitable multimeter. Unless stated otherwise, parts are replaced in the reverse order to their removal. After replacing these parts you MUST always test for gas soundness and carry out functional test of the controls and check the following:
General Inspection
After the replacement of a part, the following must be checked.
● The integrity of the flue system and flue seals.
● The integrity of the appliance combustion circuit and relevant seals.
● Electrical, gas and water connections.
● System pressure.
● the combustion performance, operational gas inlet pressure and gas rates. refer to the following procedure.
ALL MODELS
Refer to the installation and servicing instructions supplied with your boiler to t the replacement gas valve.
After assembly, test for gas soundness and purge in accordance with the current issue of BS6891 or in IE, the current edition of I.S.813 “Domestic Gas Installations”.
COMPETENCY TO CARRY OUT THE CHECK OF COMBUSTION PERFORMANCE
NOTE: BS 6798: 2009 Specication for installation
and maintenance of gas-red boilers of rated input not exceeding 70kW net advises that:
● The person carrying out a combustion measurement must be assessed as competent in the use of a ue gas analyser and the interpretation of the results.
● The ue gas analyser used should be one meeting the requirements of BS7927 or BS-EN50379-3 and be calibrated in accordance with the analyser manufacturers’ requirements.
● Competence can be demonstrated by satisfactory completion of the CPA1 ACS assessment, which covers the use of electronic portable combustion gas analysers in accordance with BS 7967, parts 1 to 4.
● Ensure that the gas analyser is set to the correct fuel setting.
Diagram 1
b
Diagram 2
- 2 -
Loading...
+ 2 hidden pages