Sartorius Basic Series Installation And Operating Instructions Manual

Sartorius Basic Series
Electronic Analytical and Precision Balances Installation and Operating Instructions
2
B 120S
3
B 310P, B 310S
4
B 410, B 610, B 3100P,
B 3100S, B 4100, B 6100
5
1
Weighing pan
2
Protective ring (only for B 120S)
3
Shield plate (only for B 120S)
4
Round draft shield lid (only B 310P and B 310S)
5
Glass draft shield cylinder (only B 310P and B 310S)
6
Base plate shield cylinder (only B 310P and B 310S)
7
Pan adapter (only B 310P and B 310S)
8
Power receptacle
9
Level indicator (only B 120S, B 310P, B 310S, B 3100P and B 3100S)
10
Leveling foot (only B 120S, B 310P, B 310S, B 3100P and B 3100S)
11
PRINT key (functions only if the balance has a built-in interface)
12
Menu access switch
13
Tare control
14
CAL key for calibration
15
ON/OFF key
16
Weight display
17
Manufacturer’s label
6
Sartorius Basic Series
With this Sartorius Balance, you have acquired a high-quality elec­tronic precision weighing instrument that will help ease your daily workload.
Please read these installation and operating instructions carefully be­fore operating your new balance.
Pursuant to the German Directive for the Implementation of Regulations for Prevention of Accidents "Elektrische Anlagen und Betriebsmittel (VBG4)" [Electrical Installations and Equip­ment] of April, 1986, it is hereby certified that the equipment delivered, "Electronic Analytical or Precision Balance of the Basic Series," is manufactured and tested in compliance with the following DIN/VDE regulations
DIN IEC 348/VDE0411 Safety requirements for electronic measuring apparatus
DIN IEC 380/VDE 0806 Safety of electrically energized Office machines
DIN IEC 601/VDE 0750 Safety of medical electrical equipment
and with Article 10 of the Low-Voltage Directive 73/23/EEC issued on February 19, 1973, by the European Community.
When you use electrical equipment in installations and under ambient conditions requiring higher safety Standards, you must comply with the provisions as specified in the applicable regu­lations for installation in your country.
7
Contents
Page
Equipment Supplied 8
Installation Instructions 9
How to Start Up the
B 120 S
10
How to Start Up the
B 310P and B 310S
11
How to Start Up the
B 410, B 610,
12
B 3100P, B 3100S, B 4100, and B 6100
Operation 13
Calibration 15
Balance Operating Program 16
Troubleshooting Guide 19
Accessories 20
Specifications 22
8
Equipment Supplied
B 120S
B 310P, B 310S
B 410, B 610, B 3100P, B 3100S, B 4100, B 6100
-
Balance
-
AC adapter
-
Dust cover
-
Weighing pan
-
Protective ring
-
Shield plate
-
Balance
-
AC adapter
-
Dust cover
-
Pan adapter
-
Base plate of the round draft shield
-
Weighing pan
-
Glass draft shield cylinder
-
Round draft shield lid
-
Balance
-
AC adapter
-
Dust cover
-
Weighing pan
Do not miss out on the benefits of our warranty. Please complete the warranty registration card, indicating the date of installation, and return the card to your Sartorius dealer.
Loading...
+ 18 hidden pages