Description
The stepdown transformer option, which “steps down” the supply power from either
208, 230, or 460 volts to 115 volts, includes the transformer and the necessary parts
to mount and wire the transformer. Since the mounting bracket becomes a part of the
heater suspension, read these instructions carefully before installation.
Each option package includes a transformer and the parts listed below. The transformer is shipped in its original carton. Mounting and wiring components are shipped
in a separate carton.
WARNING: Improper installation, adjustment, alteration, service, or maintenance
can cause property damage, injury or death. Read the installation, operation, and
maintenance instructions thoroughly before installing or servicing this equipment.
Application and Components
FIGURE 1 -
Option Pkg
includes
Transformer,
Bracket
Assembly,
BX Cable,
Connectors,
and Wires
*Option CA1 is a 115 volt power venter.
Option Voltage
CF1 208/115
CF2 230/115
CF4 460/115
CG1 208/115
CG2 230/115
CG4 460/115
Applies toP/N by
Model B
Gravity
Vent
Model B
w/CA1*
Power
Vent &
Model
BE
Size
Option Pkg 261244 261246
w/Transformer 260928, .50 KVA 223462, 1.0 KVA
Option Pkg 102267 102269
w/Transformer 11100, .50 KVA 16065, 1.0 KVA
Option Pkg 102267 102269
w/Transformer 11100, .50 KVA 16065, 1.0 KVA
Option Pkg 261244 261246
w/Transformer 260928, .50 KVA 223462, 1.0 KVA
Option Pkg 102267 102269
w/Transformer 11100, .50 KVA 16065, 1.0 KVA
Option Pkg 102267 102269
w/Transformer 11100, .50 KVA 16065, 1.0 KVA
25 50 75 100
Option Voltage Applies to P/N by Size 25 50 75 100 125 165 200 250 300 400
CF1 208/115
CF2 230/115
CF4 460/115
CG1 208/115
CG2 230/115
CG4 460/115
Model F
Gravity Vent
Model F with
CA1* Power
Vent & Model
FE
Components
Common to All
Option Packages
Listed in Tables
Above
Option Pkg 261243 261244 261246
w/Transformer 260927, .25 KVA 260928, .50 KVA 223462, 1.0 KVA
Option Pkg 102266 102267 102269
w/Transformer 11279, .25 KVA 11100, .50 KVA 16065, 1.0 KVA
Option Pkg 102266 102267 102269
w/Transformer 11279, .25 KVA 11100, .500 KVA 16065, 1.0 KVA
Option Pkg 261243 261244 261245 261244 261245 261246
w/Transformer
Option Pkg 102266 102267 102268 102267 102268 102269
w/Transformer
Option Pkg 102266 102267 102268 102267 102268 102269
w/Transformer
Qty P/N Description
1 102261 Bracket Assembly
1 113275 1/2” lg Sheetmetal Screw
1 16247 5/16 x 3/4” lg Hex Head Cap Screw
1 1333 5/16 Lockwasher
2 1087 Flat Washers
1 2039 BX Cable 3/8 x 18” long
1 16202 Straight Connector
260927,
.25 KVA
11279,
.25 KVA
11279,
.25 KVA
260928, .50 KVA
11100, .50 KVA 11217, .75 KVA
11100, .50 KVA 11217, .75 KVA
260929,
.75 KVA
Qty P/N Description
1 1417 90° Connector
2 16358 Anti-Short Bushings
1 5566 Black Wire, 14 ga x 30” long, 105°C
1 32525 White Wire, 14 ga x 30” long, 105°C
1 102264 Green Wire, 14 ga x 30” long, 105°C
10 16354 Twist-on Wire Connectors
260928,
.50 KVA
11100,
.50 KVA
11100,
.50 KVA
260929,
.75 KVA
11217,
.75 KVA
11217,
.75 KVA
Form I-F&B-X, PN 102265R5, Page 1
223462, 1.0 KVA
16065, 1.0 KVA
16065, 1.0 KVA
Installation
Transformer
Locking Screw
(1/2” lg Sheetmetal Screw)
Bracket
Assembly
5/16 x 3/4” lg
Hex Head Cap
Screw
5/16 Lockwasher
(2) 5/16 Flat
Washers
Instructions
Installation should be done by a qualied agency in accordance with the instructions on this
sheet and in compliance with all codes and requirements of authorities having jurisdiction.
1. Determine Correct Position for the Transformer Bracket
The bracket is always attached to the heater at a hanger bracket on the same side of the
heater as the eld supply wiring connection. Depending on the type of heater, there are
three possible positions for installing the bracket. Read the following and determine the
correct location for your particular installation.
FIGURE 2 - Transformer
Location on a Heater
with 2-Pt Suspension
FIGURE 3 - Transformer
Location on a Heater
with 4-Pt Suspension (no
optional blower cabinet)
FIGURE 4 - Transformer
Location on a Heater with
4-Pt Suspension (with
optional blower cabinet)
FIGURE 5 - Install Transformer Bracket
• Model F and FE with Two-Point Suspension -
- Select center suspension point (Remove and
discard the side panel screw that is located next
to this hanger bracket). (See FIGURE 2.)
• Model F and FE with Four Point Suspension and
Model B and BE without an Optional Blower/Filter
Cabinet -- Select suspension point closest to the
eld supply wiring connection. (See FIGURE 3.)
• Model B and BE with Optional Blower /Filter Cab-
inet -- Select suspension point closest to the front
of the heater. (See FIGURE 4.)
2. Install Transformer Bracket
The bracket is designed to become a part of the suspension of the heater and has a threaded rod hanger
hole identical to the one on the heater. The length of
heater suspension required at this point will be shortened by two inches.
Follow the instructions in FIGURE 5.
Instructions:
1) Place the two at washers over the hanger bracket hole.
2) Place the transformer bracket and lockwasher in the positions shown.
3) Attach these parts to the heater with the 5/16 x 3/4” long hex head screw.
IMPORTANT: The bracket for the stepdown transformer MUST
be installed prior to suspending the heater. DO NOT fasten the
transformer to the bracket before the heater is suspended.
When suspending the heater, remember that due to the trans-
former bracket, suspension is 2” closer at that point.
3. Install and Wire the Stepdown Transformer (Be certain power is OFF.)
1) Feed the wires through the conduit and place an anti-short bushing on each end of the conduit.
2) Attach the straight connector to the knockout hole in the side of the transformer.
3) Feed the wires into the connector and attach it to the conduit.
4) Hang the transformer on the bracket that was attached to the heater before suspension. Insert the locking screw as
shown in FIGURE 5.
5) Following the diagram and connection information on the transformer, make the wiring connections. Since the trans-
former has dual primary and secondary voltages, extra care should be taken in making these connections.
6) Attach the 90° connector to the threaded hole on the heater for the supply wiring connection. Feed the wires through
the connector and attach the connector to the conduit. Form a loop in the conduit between the transformer and the
heater to take up any excess length. (Conduit provided is the same length for all suspension point locations.) See
FIGURE 2, 3, or 4.
7) Remove the wire access panel and make the wiring connections according to the diagram on the heater. Replace
the panel.
4. Turn on the electric power and the gas and light the heater following the instructions on the lighting instruction
plate.
Form I-F&B-X, PN 102265R5, Page 2
www.ReznorHVAC.com; (800) 695-1901
© 2014 Reznor, LLC. All rights reserved.
*Trademark Notes: Reznor® is registered in at least the United States.
All other trademarks are the property of their respective owners.
0514 Form I-F&B-X (Version A.1)