THE
BOILING WATER DISPENSER
INSTALLATION & OPERATING
INSTRUCTIONS
IMPORTANT: READ AND SAVE THESE INSTRUCTIONS FOR THE BENEFIT OF THE USER
Thank you for choosing a quality Redring product manufactured by
Applied Energy Products Limited, Peterborough, U.K.
Contents Page
Installation Instructions
Important notes .............................................................................................................................. 2
What the installer will need ......................................................................................................... 3
Where to locate the SB
Installing the water supply and steam vent pipes.................................................................... 3
Installing the mains supply........................................................................................................... 4
Removing the front cover ............................................................................................................. 4
Fixing the unit on the wall............................................................................................................. 6
Connecting the water supply and steam vent pipes................................................................ 6
Connecting the mains cable......................................................................................................... 6
Replacing the front cover ............................................................................................................. 6
Schematic wiring diagram............................................................................................................ 6
Operating Instructions
General product description ........................................................................................................ 7
How to operate the SB
How to clean and descale your SB
Trouble shooting guidance ........................................................................................................... 9
After Sales Service...................................................................................................................... 11
Guarantee...................................................................................................................................... 12
2
................................................................................................................ 3
2
................................................................................................................. 7
2
........................................................................................... 8
Installation Instructions
Important Notes
● All installation must be supervised by a qualified electrician and plumbing engineer.
● Installation and wiring must conform to current IEE Regulations (U.K.) and the Water
Regulations Act 1999. Local regulations may apply in other countries.
● The steam vent connection MUST BE MADE, as required in these instructions.
● The product must be supplied by a 13 Amp fused double pole isolating switch with a
minimum contact gap of 3mm in each pole.
● Check that the mains supply matches the electrical rating on the product. The rating
plate is located on the bottom edge of the unit.
● THIS APPLIANCE, AND ALL METAL PIPE WORK CONNECTED TO IT, MUST BE EARTHED.
● If you have any queries about installing this product or after it has been installed, please
contact Applied Energy Products Customer Services (Ring 08709 000430). Customers
outside the U.K. should contact their local Redring distributor.
● This product will need to be descaled regularly. The frequency of descaling will depend
on the hardness of the water supply.
2
What the installer will need
● A 13 Amp fused double pole isolating switch with a minimum contact gap of 3mm in each pole.
● Suitable length of 1.0mm
with BS6500.
● Suitable lengths of 15mm copper pipe.
Where to locate the SB
● We recommend that the unit is installed on a suitable wall, at shoulder height and over a
sink.
● Adjacent to the 13 Amp (240 V) double pole fused isolating switch.
● Available mains cold water supply and drainage facility.
● Do not install the SB
● Do not obstruct the ventilation channel in the backplate.
2
three core multi strand PVC insulated mains cable that complies
2
2
within reach of a person using a bath or shower.
Installing the water supply and steam vent pipes
Ventilation Channel
Condenser
Fig. 1
Ventilation Channel
Steam Vent
Inlet
The unit must be connected to cold, mains fed, drinking water only. Pressure range between 0.7
Bar/69kPa (10psi) and 10.0 Bar/940kPa (140psi).
Do not connect to a storage tank
● Isolate the water supply.
● Lay in 15mm water supply pipe to the location of the inlet connection (Fig. 1). (Check that
the water supply position gives enough space under the unit for it to be used properly).
Flush through the water supply before making the final connection, so that any debris is
removed.
Note: The inlet elbow contains a flow regulator. THIS MUST BE USED IN THE INSTALLATION.
● Lay in 15mm drainage pipe to the location of the steam vent connection (Fig. 1). (Connection is
made using the push fit adaptor provided).
● The steam vent connection must be taken directly to the sink below, if there is one, or via
a tundish to a suitable drain. Note: The steam vent outlet also acts as an overflow. (If a sink is
used it must be able to withstand boiling water and have an overfill outlet).
3
Installing the mains supply
If a mains supply is not already available.
● Install a 13 Amp fused double pole isolating switch with a minimum contact gap of 3mm in
each pole adjacent to where the unit will be fixed.
Removing the front cover
● Remove the screws from the bottom and top edge of the unit (Fig. 3).
● Support the front cover and remove the flow knob (Fig. 4).
● Pull the front cover away from the unit.
● Please note that there is a flying lead and plug freely attached to the front cover.
Fig. 3
4