Quasar SmartCell 212, SmartCell 112 Installation Manual

Thank you for purchasing “SmartCell 212 /112” product.
Quasar Communication Systems Ltd. and its distributors assume no responsibility for any damage or loss resulting from the use of its products or this user manual. Quasar Communication Systems Ltd and its distributors assume no responsibility for any loss or claims by third parties, which may arise through the use of its products.
Smartcell 212 /112 carries CE Certification, Australia AS/NZS3548
Corporate contacts
E-mail: sales@quasar.biz
Web address: www.quasar.biz
© Quasar Communication Systems Ltd. All rights reserved. Quasar, the Quasar Logo, CelluLink and CellBox are registered trademarks of Quasar Communication Systems Ltd. Other product and brand names may be trademarks or registered trademarks of their respective owners.
September 2003
1. Introduction
1.1 Overview
The SmartCell 212 and 112 gateway enables direct connection of an organization's internal telephony system to commercial cellular networks via an already existing Private Branch Exchange (PBX) system. The SmartCell 212 has a standard ISDN BRI “S0” interface on the Line side and connects with 2 channels to any GSM cellular network to create a cellular gateway. The SmartCell 112 is a single channel gateway. SmartCell 212/112 operates at 900MHz/1800MHz. The 212-1900 and 112-1900 models operate at 900MHz/1900MHz.
1.2 Packing List
for 212
Item Description Qty
1 SmartCell 212 unit 1 2 Power Supply 1 3 ISDN S Interface Cable (straight) 1 4 SYNC IN Cable (straight) 1 5 Antenna 2 6 Bag with Screws and Dowel Pins 1 7 Bracket 2 8 Installation Guide 1
for 112
Same list apart of one antenna and one bracket provided.
2
2 Bags with Screws
& Dowel pins
SmartCell 212/112
SmartCell 212/112 unit
Cables Power Cable ISDN Interface Cable SYNC IN Cable
Antenna
Drill Template
3
2. Safety Precautions
Main voltages are present at specific points in this equipment. Some of the parts can also have high operating temperatures. Non-observance of these conditions and safety instructions can result in personal injury or in property damage. The Smartcell 212 system complies with the standard IGC 950. All connected equipment must comply with the applicable safety standards: EN 55022 IEC 1801-2/91 IEC 801-3 IEC 801-4 To avoid injury and prevent equipment damage, observe the following safety precautions: Do not ship equipment unless it is properly packed in its original wrapping and shipping containers. Do not connect the 212 or 112 to any power supply other than the one provided with it. Equipment service and maintenance should be done only by qualified personnel.
4
Loading...
+ 11 hidden pages