
Thank you for purchasing “SmartCell 212 /112” product.
Quasar Communication Systems Ltd. and its distributors assume no
responsibility for any damage or loss resulting from the use of its products or
this user manual. Quasar Communication Systems Ltd and its distributors
assume no responsibility for any loss or claims by third parties, which may
arise through the use of its products.
Registration and Type Approval
Smartcell 212 /112 carries CE Certification, Australia AS/NZS3548
Corporate contacts
E-mail: sales@quasar.biz
Web address: www.quasar.biz
© Quasar Communication Systems Ltd. All rights reserved. Quasar, the
Quasar Logo, CelluLink and CellBox are registered trademarks of Quasar
Communication Systems Ltd. Other product and brand names may be
trademarks or registered trademarks of their respective owners.
September 2003

1. Introduction
1.1 Overview
The SmartCell 212 and 112 gateway enables direct connection of an
organization's internal telephony system to commercial cellular networks via
an already existing Private Branch Exchange (PBX) system.
The SmartCell 212 has a standard ISDN BRI “S0” interface on the Line side
and connects with 2 channels to any GSM cellular network to create a
cellular gateway. The SmartCell 112 is a single channel gateway. SmartCell
212/112 operates at 900MHz/1800MHz. The 212-1900 and 112-1900
models operate at 900MHz/1900MHz.
1.2 Packing List
for 212
Item Description Qty
1 SmartCell 212 unit 1
2 Power Supply 1
3 ISDN S Interface Cable (straight) 1
4 SYNC IN Cable (straight) 1
5 Antenna 2
6 Bag with Screws and Dowel Pins 1
7 Bracket 2
8 Installation Guide 1
for 112
Same list apart of one antenna and one bracket provided.
2

2 Bags with Screws
& Dowel pins
SmartCell 212/112
SmartCell 212/112 unit
Cables
Power Cable
ISDN Interface Cable
SYNC IN Cable
Antenna
Drill Template
3

2. Safety Precautions
Main voltages are present at specific points in this equipment. Some of the
parts can also have high operating temperatures. Non-observance of these
conditions and safety instructions can result in personal injury or in property
damage.
The Smartcell 212 system complies with the standard IGC 950. All
connected equipment must comply with the applicable safety standards:
EN 55022
IEC 1801-2/91
IEC 801-3
IEC 801-4
To avoid injury and prevent equipment damage, observe the following safety
precautions:
Do not ship equipment unless it is properly packed in its original wrapping
and shipping containers.
Do not connect the 212 or 112 to any power supply other than the one
provided with it.
Equipment service and maintenance should be done only by qualified
personnel.
4