SunStay
All in one solar streetlight
Installation Instructions
1
2
Horizontal
Mounting
Dimensions
38
83
369
Specications
Application
Type
Lamp
Voltage
Solar Street Light
BRP710
LED(2000 lumen)
12 V DC
Shrink
wrap
Remove shrink wrap and protective cover
before installation.
Protective
cover
Mount the luminaire with pole, tighten the
bolts with torque of 8 Nm.
Fig. A
3
Fig. B
For vertical mounting unscrew and remove
pole mounting bracket and assemble it as
shown in Fig. B.
5 6
0°
5°
15°
10°
For tilt mounting to suit various geography,
luminaire can be tilt mounted from
0 to 15 deg
Vertical
Mounting
4
Pole Dia:50 to 60mm
0°-15°
Switch
156
IP-65
ta
35
684
IP Classication
769
Net Weight
Max. Projected Area
Battery Type
PIR Sensor
Luminiare CCT
IP 65
9 Kg (2000 lumen
10.5 Kg (3000 lumen)
0.286 m²
LiFePO4
Available
5000 K- 6500 K
For accurate angle positioning, match pole
marks mounting piece marking with
luminaire marking
Precaution:
1. Maximum installation height luminaire from gorund is 5meters.
2. Before installation check if luminaire is glowing by pressing the switch on housing.
3. After three months of manufacturing, check if luminaire is the glowing (by switch),
if it is not working then contact customer care.
4. This luminaire will not operate below 0 degree ambient.
To switch ON the luminaire press the
switch button shown in below gure.