Perlick 63134-1, 63134-2, 63134-4, 63134-3 User Manual

INSTALLATION AND OPERATION INSTRUCTIONS BEER PUMP PANELS
MODEL NO.
63134-1 63134-2 63134-3 63134-4
IMPORTANT INFORMATION
This manual has been prepared to assist you in the operation of Perlick Beer Pump Panel System.
We dedicate considerable time to ensure that our products provide the highest level of customer satisfaction. If service is required, your dealer can provide you with a list of qualified service agents. For your own protection, never return merchandise for credit without our approval.
We thank you for selecting a Perlick product and assure you of our continuing interest in your satisfaction.
8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069
Toll Free 800-558-5592 • E-Mail: Perlick@Perlick.com • www.Perlick.com
Table of Contents
Installing the Panel ..............................................2
Panel Diagram.....................................................3
How to Operate the Beer Panel...........................4
Beer Pump Diagram............................................5
Cleaning Diagram................................................6
Winterizing a System with Beer Pumps...............7
Replacement Parts ..............................................7
Installation – Beer Pump Panels
Use panel as a template to mark where holes should be drilled on cooler wall. (Note: Make sure panel is level and pumps are in the vertical position).
9
Drill
/64”pilot holes in cooler wall. Use fasteners provided in installation kit to mount the beer pump panel to the cooler wall.
Push CO Supply barbed inlet. Position clamp over joint and tighten.
2 supply line over Keg Pressure
(See diagram on page 3).
(Note: A safety Relief Valve should be installed between supply tank and shut-off point on carbon dioxide supply line. Relief setting depends on maximum system pressures).
Push air or CO2 supply line over Beer Pump Pressure barbed inlet.
3).
Position clamp over joint and tighten. If
(See diagram on page
using compressed air, make sure air supply is clean and dry. Air must have a pressure dew point of 30°F. or lower to ensure pumps operate properly.
Push beer line (from trunk housing) over barbed Liquid outlet on flow reversal valve.
(see diagram on page 3)
. Position clamp over
joint and tighten.
Push connector hose over Liquid inlet on beer pump inlet fitting.
(See diagram on page 3)
.
Position clamp over joint and tighten. (Note:
Connector hose should not exceed 10 feet in length)
.
Install washer into hex nut on opposite end of connector hose. Connect to top threaded fitting of Perlick Smart Coupler.
Cut a piece of CO2 tubing and push one end onto barbed CO
page3)
. Position clamp over joint and tighten.
2 outlet.
(See diagram on
Push the other end over the barbed gas inlet on the Perlick Smart Coupler. Position clamp over joint and tighten.
CAUTION: IF USING CO
2 AS A
PRESSURE SUPPLY FOR PUMPS, PUMP EXHAUST MUST BE VENTED TO A WELL VENTILATED AREA TO AVOID POSSIBLE ASPHYXIATION.
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
2
Diagram – Beer Pump Panel Diagram
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
3
Loading...
+ 5 hidden pages