INSTALLATION AND OPERATION INSTRUCTIONS
BEER PUMP PANELS
MODEL NO.
63134-1
63134-2
63134-3
63134-4
IMPORTANT INFORMATION
This manual has been prepared to assist you in the
operation of Perlick Beer Pump Panel System.
We dedicate considerable time to ensure that our
products provide the highest level of customer
satisfaction. If service is required, your dealer can
provide you with a list of qualified service agents. For
your own protection, never return merchandise for
credit without our approval.
We thank you for selecting a Perlick product and
assure you of our continuing interest in your
satisfaction.
8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069
Toll Free 800-558-5592 • E-Mail: Perlick@Perlick.com • www.Perlick.com
Table of Contents
Installing the Panel ..............................................2
Panel Diagram.....................................................3
How to Operate the Beer Panel...........................4
Beer Pump Diagram............................................5
Cleaning Diagram................................................6
Cleaning Instructions ...........................................7
Winterizing a System with Beer Pumps...............7
Replacement Parts ..............................................7
Installation – Beer Pump Panels
■ Use panel as a template to mark where holes
should be drilled on cooler wall.
(Note: Make sure panel is level and pumps are
in the vertical position).
9
■ Drill
/64”pilot holes in cooler wall. Use fasteners
provided in installation kit to mount the beer
pump panel to the cooler wall.
■ Push CO
Supply barbed inlet.
Position clamp over joint and tighten.
2 supply line over Keg Pressure
(See diagram on page 3).
(Note: A
safety Relief Valve should be installed between
supply tank and shut-off point on carbon dioxide
supply line. Relief setting depends on maximum
system pressures).
■ Push air or CO2 supply line over Beer Pump
Pressure barbed inlet.
3).
Position clamp over joint and tighten. If
(See diagram on page
using compressed air, make sure air supply
is clean and dry. Air must have a pressure
dew point of 30°F. or lower to ensure pumps
operate properly.
■ Push beer line (from trunk housing) over barbed
Liquid outlet on flow reversal valve.
(see diagram on page 3)
. Position clamp over
joint and tighten.
■ Push connector hose over Liquid inlet on beer
pump inlet fitting.
(See diagram on page 3)
.
Position clamp over joint and tighten. (Note:
Connector hose should not exceed 10 feet in
length)
.
■ Install washer into hex nut on opposite end of
connector hose. Connect to top threaded fitting
of Perlick Smart Coupler.
■ Cut a piece of CO2 tubing and push one end
onto barbed CO
page3)
. Position clamp over joint and tighten.
2 outlet.
(See diagram on
Push the other end over the barbed gas inlet on
the Perlick Smart Coupler. Position clamp over
joint and tighten.
CAUTION: IF USING CO
2 AS A
PRESSURE SUPPLY FOR PUMPS,
PUMP EXHAUST MUST BE VENTED
TO A WELL VENTILATED AREA TO
AVOID POSSIBLE ASPHYXIATION.
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
2
Diagram – Beer Pump Panel Diagram
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
3