INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR SLIDING PATIO DOOR
Lea las instrucciones en español en el reverso. Installation Instructions for Typical Wood Frame Construction.
These instructions were developed and tested for use with typical wood frame wall construction in a wall system designed to manage water. These instructions are not to be used with any other construction method. Installation instructions for use with other construction methods or multiple units may be obtained from Pella Corporation or local Pella retailer. Building designs, construction methods, building materials, and site conditions unique to your project may require an installation method different from these instructions and additional care. Determining the appropriate installation method is the responsibility of you, your architect, or construction professional. Handling and Storage: Provide full support under the framework while storing, moving and installing the product. DO NOT lift the product by the head member only. Remove the plastic shipping material prior to storing or installing the product. DO NOT store in direct sunlight. Allow sufficient spacing between products for ventilation.
YOU WILL NEED TO SUPPLY: TOOLS REQUIRED:
• Cedar or Impervious shims/spacers (12 to 20)
• 2" galvanized roofing nails (1/4 to 1/2 lb.)
• Closed cell foam backer rod/sealant backer (12 to 30 ft.)
®
SmartFlash™ foil backed butyl window and
• Pella door flashing tape or equivalent
• High quality exterior grade polyurethane or silicone sealant (2 to 3 tubes per door)
• Great Stuff
Window and Door Insulating Foam Sealant by the
SEALANT
SEALANT
Dow Chemical Company or equivalent low pressure polyurethane window and door foam - DO NOT use high pressure or latex foams.
• Wood blocking for sill
• Optional stainless steel screws and anchors for installation on concrete floor.
For High Performance Applications:
• #8 x 1-1/2" corrosion resistant Phillips pan head screws (75 to 100)
• #8 x 3/4" outside diameter corrosion resistant flat washers (75 to 100)
Installation will require two or more persons for safety reasons.
• Tape measure
• 2' or 4' Level
• Square
• Hammer
• Stapler
• Sealant gun
• Scissors or utility knife
• Screwdrivers (#2 Phillips with 8" shaft and small flat blade)
• Drill
REMEMBER TO USE APPROPRIATE
PERSONAL PROTECTIVE EQUIPMENT.
$PSOFS 'MBTIJOH 5BQF
4JEF 'MBTIJOH 5BQF
8PPE#MPDLJOH

/BJMJOH'JO
5PQ 'MBTIJOH 5BQF
$PSOFS 'MBTIJOH 5BQF
4JEF'MBTIJOH5BQF
)FBE
4JMM
8BUFS 3FTJTUJWF #BSSJFS
4IFBUIJOH
'SBNJOH
4JMM'MBTIJOH5BQF
4JMM'MBTIJOH5BQF
Always read the Vinyl Window and Door Limited Warranty before purchasing
or installing Vinyl Windows and Doors manufactured by Pella Corporation. By installing this product, you are acknowledging that this Limited Warranty is part of the terms of the sale. Failure to comply with all Pella installation and maintenance instructions may void your Pella product warranty. See Limited Warranty for complete details at http://warranty.pella.com.
1 ROUGH OPENING PREPARATION
A. Verify the opening is plumb and level. Ensure the
bottom of the rough opening does not slope toward the interior.
Note: It is critical that the bottom is level.
B. Verify the door will fit the opening. Measure all four
sides of the opening to make sure it is 1/2" larger than the door in width and height. Measure the width at the top, bottom, and center. Measure the height at the far left side, the far right side, and in the center.
Note: 1-1/2" or more of solid wood blocking is required around the perimeter of the opening. Fix any problems with the rough opening before proceeding.
C. Cut the water resistive barrier (1C).
8BUFS3FTJTUJWF#BSSJFS
TUDVU
£
OE
DVU
SEDVU
UIDVU .BLFBDVUVQGSPN FBDIUPQDPSOFSBUB¡ BOHMFUPBMMPXUIFXBUFS SFTJTUJWFCBSSJFSUPCF MBQQFEPWFSUIFmOBUUIF IFBEPGUIFEPPS
*OUFSJPS
£
*OUFSJPS
£
&YUFSJPS
D. Fold the water resistive barrier (1D). Fold side flaps into
the opening and staple to inside wall. Fold top flap up and temporarily fasten with flashing tape.
E. Apply sill flashing tape #1. Cut a piece of flashing tape 12"
longer than the opening width. Apply at the bottom of the opening as shown (1E) so it overhangs 1" to the exterior.
Note: The tape is cut 12" longer than the width of the opening so that it will extend up each side approximately 6".
F. Tab the sill flashing tape and fold. Cut 1" wide tabs at each
corner (1/2" from each side of corner) (1F). Fold tape to the exterior and press firmly to adhere it to the water resistive barrier.
G. Apply sill flashing tape #2. Cut a piece of flashing tape 12" longer
than the opening width. Apply at the bottom, overlapping tape #1 by at least 1". DO NOT allow the tape to extend past the interior face of the framing (1G).
Note: The flashing tape does not need to extend all the way to the interior of the framing.


£


£
£

£
2 PREPARE THE DOOR FOR INSTALLATION
TWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL SAFELY.
A. Remove the packaging from the door. Inspect the frame and
sash for damage. DO NOT install damaged units.
Note: If screens or hardware are removed from the door at this time, label them and store them in a protected area.
B. Relocate the slide panel bumper. Remove the bumper located at
the top of the fixed jamb, and install in the fixed jamb against the sill track.
Interior View
2B
*OUFSJPS7JFX
C. Remove the venting panel. Slide the panel to the open position,
making sure it clears the anti-lift clip. Lift the panel out of the
Ó
lower track and tilt the bottom of the panel away from the door frame. Then, lower the panel out of the top track. Carefully set the panel aside in a safe place.
REVERSING DOOR SLIDE: If changing the slide of the door panel, refer to Installation Instructions (Reversing Door Slide) later in this booklet. Note: Doors with Blinds-Between-the-Glass are not reversible.
3 SETTING AND FASTENING THE DOOR
TWO OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS.
IF INSTALLING ON A CONCRETE FLOOR, refer to Installation Instructions (Bottom Fin Removal) later in this booklet.
A. Insert the door from the exterior of the building. Place
the bottom of the door at the bottom of the opening, then tilt the top into position. Center the door between the sides of the opening to allow equal clearance for shimming, and insert one roofing nail in the first hole from the corner on each end of the top nailing fin. These are used to hold the door in place while shimming it plumb and square.
Note: When installing doors without a bottom fin, DO NOT slide the bottom of the door into the opening, as sliding will damage the sealant lines. Insert sill anchor screws prior to shimming.
Î
£
Î
Ó
&YUFSJPS
Î
B. Plumb and square door. Insert shims between the door and
the sides of the rough opening starting up 6" from the bottom of the door. Also shim between the top of the door and the rough opening above the fixed interlocker and at the mid-point between the fixed interlocker and the lock jamb.
Note: DO NOT over shim.