TABLE OF CONTENTS
1°
2,
3.
4.
USING THIS MANUAL 1
A. INSTALLATION SEQUENCE ............. 1
B. SPECIAL ATTENTION BOXES ........... 1
PREINSTALLATION 2
A. ACCESSIBILITY CLEARANCES .......... 2
B. CLEARANCE FROM COMBUSTIBLE
CONSTRUCTION ..................... 2
C. LIQUEFIED PETROLEUM (LP) GAS ....... 2
D. INSTALLATION SURVEY ............... 2
E. PLANNING THE LAYOUT ............... 2
BOILER SET-UP 3
WATER PIPING AND CONTROLS 4
A. BOILER SUPPLY AND RETURN .......... 4
B. SAFETY RELIEF VALVE ................ 5
C. PIPING FOR ZONED SYSTEMS .......... 6
D. EXPANSION TANK .................... 7
E. INDIRECT-FIRED WATER HEATER ........ 7
E FREEZE PROTECTION ................. 7
VENTING, VENTILATION AND
AIR INLET 8
A. GENERAL ........................... 8
B. PEERLESS WALL THIMBLE ............. 8
C. ROOF TERMINATION ................. 10
D. VENT PIPE INSTALLATION ............ 11
E. AIR INLET PIPE INSTALLATION ......... 11
E AIR FOR VENTILATION ............... 12
G. BOILER REMOVAL FROM COMMON
VENTING SYSTEM ................... 12
6. ELECTRICAL 15
A. WIRING ........................... 15
B. ZONED SYSTEM WIRING ............. 15
C. CONTROLS ........................ 15
D. SEQUENCE OF OPERATION ........... 16
7. START-UP PROCEDURES 19
A. COMPLETING THE INSTALLATION ...... 19
B. CONTROL DESCRIPTIONS ............. 22
C. ADJUSTMENT OF GAS PRESSURE
REGULATOR ....................... 22
D. CHECKING BURNER INPUT ............ 22
E. CHECK-OUT PROCEDURE ............. 23
8. TROUBLESHOOTING 24
A. SHUT-DOWN CAUSED BY PILOT OUTAGE,
PRESSURE SWITCH OR FLAME ROLL-OUT
SAFETY SHUT-OFF SWITCH ........... 24
B. TROUBLESHOOTING GUIDES .......... 24
C. MEASURING SUCTION PRESSURE ...... 24
9. MAINTENANCE 28
A. GENERAL .......................... 28
B. DAILY (WITH BOILER IN USE) .......... 28
C. WEEKLY (WITH BOILER IN USE) ........ 28
D. MONTHLY (WITH BOILER IN USE) ....... 28
E. ANNUALLY (BEFORE START OF HEATING
SEASON) .......................... 29
10. BOILER DIMENSIONS 8 RATINGS 31
11. REPAIR PARTS
33
5. GAS PIPING 13