Peerless SC Series User Manual

SC/SCT
Gas/Off Boilers
Installation,
Operation b Maintenance
Manual
PEERLESS _
6 Sizes
" Oil, Gas or Comb|nhtion G_s
Knockdown (Factory Assembled Split Block Sections)
or Packaged Hot Water or Steam Boilers
5-10 Sections 3.0 to 5.5 GPH Input Up to 83.7% Combustion Efficiency
Forced Draft Venting
Only Requires a Three Foot Vent Above the Roof
High Efficiency Power Burners
Choice ofBeckett, Carlin, Gordon-Piatt, Power Flame or Webster
Top Flue Outlet
Includes Locking Damper
Large Water Content, Wet Base Section Design
Ideal for Steam and Large Volume Hot Water Jobs
Steel Push Nipples
Provide a Permca_cmt Water Tight S_al Belween Sections
Unaj]'_cted by Petroleum and Other Conlaminanis
Easy to Clean
Flueways ca_ be Cleanedj-rom Either ih__I_Ji Side or Top
Safety Controls
Probe or Float Type Low Water Cut-OffAvailable
Tankless Coils
For Domestic Hot Water Production on Hot Water Boilers
Deluxe Insulated Enameled Steel Jacket
Reduces Boiler Heat Loss
Honeywell Operating Controls
Manual Reset High Limit Control
LWCO on Packaged Boilers
Tankless Coils
Various Burner Options and Voltages
FM and IRI Control Systems
Peerless Heal_,r Company is pleased Io offer o_lL" of lhe illosf compreh_nsiw! warranty programs
in the inda,slry. All Peerless conmlercial cast iron boilers include a fi_ll, one y_'ar warranty. A [_I_-_-_r'SS® limited, fen year warr(mty ol_ the ca.sl troll sections is provided Jbr all commercial lint water and
steam boilers. Five cmd len-year t_xIt!llded wanantics on paris and labor are flow auailable. CAST IRON BOILERS Ple_e Colisttll I)(,('rless [ ]_'_llt,r ColllpCllly.lbr COTil[)lt_l_! warrallly iqtbrnlalioll.
Peerless Heater Company 231 North Walnut Street Boyertown, PA 19512-i021 610-367 2153 wv_v.peerless-heater.com
FAB SC R3 (11/02 1 5M)
Pnnted in U S A
pr=-r=-RLESS
CAST IRON BOILERS
Series SC/SCT
Semi-Commercial
Packaged or Knockdown
Forced Draft Venting Power Burner
Oil, Gas, Gas/Oil
J Steam or Hot Water Boilers
Optional Tankless Coils
Available from the factory as knockdown split blocks or completely packaged
assembled units, with steel push nipples, for easy installation.
The top or side clean out features allow for easier cleaning, maintaining highest
operating efficiency.
Pressurized, forced draft firing requires
only a three foot vent above the roof, without the need for a chimney, for
simple installations. The SC and the SOT hot water boilers
provide optional tankless domestic hot water openings for versatility.
The SCT designation indicates that an optional, larger, tankless domestic hot water
coil can be installed in its specially designed rear section for steam or hot water
boilers, insuring ample domestic hot
water production.
I=B=R Burner Combustion Water Content
Capacity Net I=B=R Ratings Efficiency (Gal.)
Uoiler I=B=H Model Output Boiler Oil Input Gas Input Steam Steam Water
Number MBH H.P. GPH MBH Sq. Ft. MBH MBH Oil Gas Steam Water
SC/SCT-05 343 10.2 3.00 433 1071 257 298 83.3 80.8 20.40 26.04
SC/SCT-06 405 12.1 3,50 505 1267 304 352 83.7 81.2 23.52 30.36 SC/SCT-07 462 13.8 4.00 577 1446 347 402 83.5 81.0 26.64 34.68 SC/SCT-O8 519 15.5 4.50 649 1621 389 451 83.4 80.9 29.76 39.03
SC/SCT-09 575 17.2 5.00 722 1796 431 500 83.2 80.7 32.88 43.32 SC/SCT-10 632 18.9 5.50 794 474 550 83.0 80.5 36.00
The above catings are based on 12 5% CO2 (oil) and + 10 in W.C at Ihe vent TPe Net I-B=R Ra_ngs shown include a_k:wance fo_ notma_ p_ping and p_c_up load in accordance w_h T_st_g and Ral_g st_e_la f d for LOW pressure Cast IrOn Heatbng Boilers of The V_/dren_s Institute Water rahngs are base_l on a p_F.ng
and p_kup a_lowan_ factor of 1 to 15 Steam ral_ngs based on aM ar_owaece factor of I 33 The Peedess Heater Company should b_ consu,ed before selectbng a boiler for grarity hot wale_ installations and _ns_a_ations havir_ unusual F.plng and p_kup requkements such as extended p_p_ng systems¸ exposed piping¸ night set back. et¢ Rallngs shown a_e for e_evaticns up IO 2C00 lear For e_evations above 2.OO0 feet ratings sheul_ be _educed at the rate of 4 petce_t for
each 1C_O leer above sea level I B R Burner Capacity is based on G P H with a heat,rig va_ue of 14OOOO @TU/gal Burner ,nput base_ on maximum altitude of 2¸O0O _ _or o_e_ aWtud_ ¢onsu_ _actory
Cast Iron Block
Steam Boitar.
Tankless Copper Water Heater is located inthe upper front nipple port when installed on a Hot Water Boiler.
Both Heaters may be installed on a Water Boiter when a greater volume of Domestic Hot Water is desired.
Cast Iron Section
E
H
I
J
K
L
M _/2"
p
Q 11/4"
(05-06)
l_/z"
(07-10)
Steam Water
3/4" Low Limit Control N/A
3/4" Press• Gauge, Oper. N/A
Cont. & Limit Cont.
3/4" N/A Operating Control 3/4" N/A Limit Control
1/4" N/A Theraltimeter
Gauge Glass & N/A
Low Water Cutoff
Return Optional Return
Secondary Probe Secondary Probe Low Water Cutoff Low Water Cutoff
Safety Valve Relief Valve
Return Return
R 3/4" Drain Cock Drain Cock
s T
3/4" N/A Optional High Limit
3/4" Primary Probe N/A
Low Water Cutoff
Boiler Model
Number
SC/SCT-O5 SC/SCT-06 SC/SCT-07 SC/SCT-08 SC/SCT-09 SC/SCT-IO
Width
"A"
22_/2" 22_/z" 22V2" 22_/2" 22V2" 22V2"
Length
"B"
24_/2" 28_'4"
33" 371/4" 41V2" 453/,"
Top to Floor
-C-
431/4"
43V4" 43V4" 43%" 43V4" 43%"
of Flue
"D"
10" 10" 10" 10" 10" 10"
of Flue
"E"
131/4"
15%"
171_"
19%" 21¾" 23%"
Size
-F-
7"
9"
9"
9" 10" 10"
Tappings
-G-
17%" 21-%"
257/_"
301/e" 34_'B" 38%"
Tapped Inter.
"G1"
17_/_6"
I",11".JI_(e]lV]f_e]_F_l
STEAM PIPING
The return from the system should always enter equalizer through Har[ford Loop, 2" to 4" below water line.
%.
WATER PIPING
The supply and return connections should be sized to suit the system. The supply should be piped out of the top of the back section and the return piped to the bottom of the front section. There is a 3/4"tapping in the top of the back
section for air elimination.
Boiler Model
Number
SC/SCT-05
SC/SCT-06 SC/SCT-07
SC/SCT-08 SC/SCT-09 SC/SCT-lO
Header
Htr X-1082 Htr X-1020
Htr )(-1021 Htr )(-1022
Optional Tankless Domestic Water Heater Ratings:
Boiler Htr. X-1620 Htr. X-1021 Htr. X-1022 Htr. X-1082"
Model No. GPM GPM GPM GPM (Steam)
SC-05 4.75 -- -- 4.75 SC-O6 5.00 6.00 -- 5.00 SC-07 5.25 6.50 -- 5.25 SC-08 5.50 7.00 10.00 5.50 SC-09 5.75 7.50 11.06 5.75 SC-IO 6,00 8.00 12.00 6.00
*Optionaltankless coil availablefor the SCT boiler only.
Water heater ratings are based on intermittent demands40 ° F to 140° F rise with 200 ° F boiler water.
SERIES SC/SCT BOILER SPECS
_.'tl:llll41lUJl'.lll=!lli _[ 17|=l[tllltl |[!l[o[_olol
Factory Assembled Split Block (5 & 6 Section t Block) (W, WU, S, SU Models)
Hi-Temperature Rope Seal
Deluxe Insulated Enameled Steel Jacket
Aluminized Steel Flue Collector
Front Coil Cover Plate
Cerafelt Base Liner
Drain Cock (WUP, SUP Models)
Lock Type Damper
High Limit-Operating Control
Low Water Cutoff (Pkg. Boilers)
Water
Theraltimeter
30 PSI Pressure Relief Valve (50 PSI Optional)
Steam
Gauge Glass & Fittings
Steam Gauge
15 PSI Safety Valve
Rear Coil Cover Plate (SU, SUP Models)
Boiler Model
Number
SC-05
SCT-05
SC-06
SCT-06
SC-O7
SCT-07
SC-O8
SCT-08
SC-09
SCT-09
SC-10
SCT-10
*Based on Standard Oil Burner
*Approx.
Shipping Wt.
(Ibe.)
815
910
1005
1100
1195
1280
_..'L=-'il = " " " _o1117,,_
OIL GAS GAS/OiL
Number
of Beckett GP GP
Sections Model Model Model
SC/SCT-05 CF500 S4.2G S4.2GO
SC/SCT-06 CF500 $4.2G S4.2GO
SC/SCT-07 CF800 $4.2G S4.2GO
SC/SCT-08 CF800 $4.2G $4.2GO
SC/SCT-09 CF800 $4.2G $4.2GO
SC/SCT-10 CF800 $4.2G $4.2GO
Example:
O - SC - 06- WU - STD - 30PSI
-- T T -- q T Series Sects. STD, IRI,
/
Specify 15 PSI Steam
BCor SCT (Std,)
Blank = No Burner 30 PSI Water (Std.) O = Oil Water Steam 50 PSI
G =Gas W S = LessBurner GO = Gas!Oil WU SU = w/Burner& Controls
WUP SUP =Pkg. w/Bum.& Contr.
WP SP = Pkg.LessBurner
NOTE: Special burners should be specified on order.
PEERLESSHEATERC0.
231 North Walnut Street
Boyertown, PA 19512-1021
Phone: 610-367-2153 ,, FAX: 610-369-3284
www.peerless-heater.com
IHD@Ou -"
o_, li
ASME HI Division galTia
o1gama
02002 Peedess Heater Company
SERIES EC/ECT/SC/SCT
INSTALLATION, OPERATION & MAINTENANCE MANUAL ADDENDUM
FOR INSTALLATION OF PRIMARY PROBE LOW WATER CUT OFF
LIMIT
1 1/2 NPT/
SKIM TAPPING_
0
is
. A C
Figure 1: Rear View
USE TAPPINGS A & C
FOR
APPUCATION
CG450 PROBE
1/2 X 1/2
W/ 1/2 COUPLING
x 3 NIPPLE
TEE
3/4 x 3/4 x 1/4
STEAM GAUGE
w/ 5/4 x 1/4
BUSHINO
_9 1/4" GAUGE GLASS
g
Figure 2: Primary Probe LWCO
Control Location
ALTERNATE
LIMIT/SIPHON
ORIENTATION
IrAqi["_iJ-l[']_l
Do not install a probe low water cut off in the boiler primary probe tapping unless the low water cut off is equipped with a timed on and off feature. The cycled off time will
allow the probe low water cut off to sense the true water level in the boiler and eliminate a false reading caused from sensing a foaming or surging water condition. Failure to use a timed low water cut off could result in a failed heat exchanger.
A - Control Mounting Instructions
NOTE: Longer gauge glass and rods are required for use with the optional CG-450 Primary Probe Low Water Cut Off. The gauge
glass carton, 22-162-10, is provided with a packaged boiler. For a KD boiler the longer gauge glass carton is located in a special Probe Low Water Cut Off Carton, 90759.
Packaged Boilers: The CG 450P LWCO, and PA404A limit are installed and wired at the factory. The boiler miscellaneous parts carton, located within the boiler crate, contains the longer gauge glass carton 22-162-10, Gauge Valves Carton 20-105-03, fittings end components.
KD Boilers: A separate Primary Probe Low Water Cut Off Carton, 90759 is required. This carton contains the CG450 LWCO, 22-162-10 longer glass/rods carton, 3/4" x 3" nipple, 3/4" x 3/4" x 1/4" tee, (2) 1/2" x 2" nipples and (2) 1/2" couplings. Use these
components along with those from the Steam Trim Carton and install fittings and controls per Figure 2. NOTE: The PA404A limit and siphon are not included as part of a standard KD boiler offering for ECT model boilers.
NOTE: For SCT model boilers, mount controls & steam gauge per Figure 8 in the SC/SCT Installation, Operation & Maintenance
Manual. Install longer gauge glass & fittings per Figure 2 above.
PEEI LESS ®
CAST IRON BOILERS
PEERLESS HEATER COMPANY
231 NORTH WALNUT STREET BOYERTOWN, PA 19512-1021 PHONE 610-367-2153
www.peerless-heater.com
THE PREFERRED HEATING CHOICE
X8068 R0 (7/02-2.5M)
Printed in U.S.A.
B - Cleaning the Series EC/SC Steam Boiler with Skim Tapping
The following cleaning procedure shall be performed by a qualified service person. Refer to Figure 1 for location of skim tapping.
1. Clean the boiler as described below no later than one week after the initial start up. Cleaning will be more effective if the boiler operates a day or two to loosen sediment and impurities in the system,
2. The boiler must be cleaned to remove any accumulation of oil, grease, sludge, etc. that may be in the system. These substances can cause foaming and surging of the boiler water, producing an unstable water line and water carryover to the system.
WARNING: CLEANING THE BOILER REQUIRES THE USE OF VERY HOT WATER AND CORROSIVE CHEMICALS,
USE CARE WHEN HANDLING TO PREVENT INJURY.
3. Connect a 1-1/2" pipe nipple and shut off valve to skim tapping.
4. Connect a 1-1/2" drain line off of the skim valve, run to a point of safe discharge.
5. Close all valves to the system. Provide a means of continuous fresh water to the boiler for the cleaning process.
6. Open the skim valve. Fill the boiler until water begins to flow out of the valve. Shut off fill valve.
7. Use common washing soda (such as Arm and Hammer Super Washing Soda). Mix the soda with water in a 10 quart pail and
pour into the boiler through the safety valve tapping. Mix a proportion of one (1) pound of washing soda for each 800 square
feet EDR net boiler rating.
CAUTION: DO NOT LEAVE THE BOILER UNATTENDED WHILE FIRING, TAKE GREAT CARE NOT TO ALLOW THE
WATER LEVEL TO DROP BELOW THE BOTTOM OF THE GAUGE GLASS OR TO ALLOW FRESH WATER MAKEUP TO FLOW IN TOO FAST. THIS WILL AVOID THE POSSIBILITY OF CAUSING THE BOILER
SECTIONS TO FRACTURE.
8. Turn burner on and allow the boiler water to heat up to just below steaming (180 to 200 degrees F). Cycle the burner to
maintain temperature during skimming. Do not allow the boiler to steam. Steaming mixes up the contaminants in the water instead of floating them at the surface.
9. Open the make-up water valve to continuously feed water to the boiler. Allow water to flow out of the skim tapping.
10. Continue skimming the boiler until the water flowing from the skim tapping flows clear. This will take some time, possibly several hours for a dirty system.
11. After skimming is complete, close the skim valve and turn off the boiler.
12. Close the make-up water valve and open the boiler drain valve.
13. Drain the boiler completely. Refill and drain again one or two times to make sure all of the soda has been washed out.
14. Restore piping to normal. Pipe a nipple and cap in the skim valve.
15. NOTE: If the gauge glass becomes dirty again, this indicates more contaminants have worked loose in the system. Repeat
the cleaning and skimming process as needed to clean the system.
C - Wiring
NOTE: Burner disconnect is not applicable on Series SC/SCT.
Y
R7184B BURNER /
pRIMARy CONTROL BURNER
J/ BOX
BOILER
J/ BOX
G ¢
BK L BK BK
W
CA{) Ol$C_l
[] STEAM WITH OR
WITHOUT TANKLESS
/ HEATER
I/" I _Y ",
1 "_ .... o_ _4V 1M[RMOSTAT
OPERATING CONTROL
FOr( 5TEAM W/
TANKLESS H£ATER ONLY
H YDROLE _IEL
CG450
(BY INST_LU.£R)
--JUMPER )_£R'_ SIq TCH
(BY INSTALLER)
SAFETY SMTQdES
-- LIN[ VOLTAG[
.......... tOW VOLTA_
ALt _MRING MUST COMPty _T_I APPLIANOE COOLS, ORDINANCES AN0 R[GULATIONS