
Installation and Assembly - LCD Flush Mount T ube
This product is to be used in combination with model PJC 100 Projector Mount and Ceiling Mount.
Model: EXT 002
IMPORT ANT! Read entire instruction sheet
before you start installation and assembly.
Before you start check the parts list below to
make sure all of the parts shown are included.
WARNING
• Installer must verify that the ceiling will safely support
four times the combined weight of all attached equipment and hardware.
Thread tube (A) into ceiling plate (ACC 570
shown) from top.
A
Parts List
Description Qty. Part Number
A flush mount tube 1 580-0004
Screw ball and socket mount (PJC 100) to
bottom of tube. Make sure at least four complete threads are engaged. Note: It may be
necessary to hold tube from disengaging as you
screw mount on.
R
A
Attach security screw through hole in mount and
notch in tube. For flush look, rotate mount counterclockwise until top of mount is flush with bottom of
ceiling plate. Next attach mount assembly to joist in
ceiling according to instructions included in ceiling
plate mount.
1 of 1
Visit the Peerless Web Site at www.peerlessindustries.com For customer service call 1-800-729-0307 or 708-865-8870.
© 2004 Peerless Industries, Inc. All rights reserved.
Peerless is a registered trademark of Peerless Industries, Inc.
All other brand and product names are trademarks or registered trademarks of their respective owners.
ISSUED: 09-07-01 SHEET #: 055-9050-2 08-05-04