89310! PROSYSTEM ASSEMBLY INSTRUCTIONS
Attach one (I) I-1/4 SQ. RUBBER BUMPER to the CENTER of the CARRIAGE STOP on the
WEIGHT CARRIAGE.
Slide WEIGHT CARRIAGE down over the REAR UPRIGHT of the MAIN UPRIGHT. (NOTE:
MAKE SURE THAT THE WEIGHT PEG ON THE WEIGHT CARRIAGE IS FACING
TOWARDS THE FRONT OF THE MACHINE)
LOOSELY attach the two (2) PULLEY MOUNT FLATS to the REAR and FRONT UPRIGHTS of the
MAIN UPRIGHT. using two (2) 3/8 X 3 IN. BOLTS, two (2) 3/8 IN. LOCI(. WASHERS, and two (2)
IN. NUTS. (NOTE: THE HOLE CLOSEST TO THE END ON THE PULLEY MOUNT FLATS
SHOULD BE ASSEMBLED TO THE REAR UPRIGHT) (SEE DRAWING)
9.
13.
14.
15.
AT THIS TIME TIGHTEN ALL LOOSE FRAME CONNECTIONS MADE TO THIS POINT.
LOOSELY attach two (2) 3-1/20.D. X 1 IN. BUSHING PULLEY and four (4) 1/2 IN. LG. PULLEY
SPACERS~ (ONE ON EACH SIDE OF THE PULLEYS) between the PULLEY MOUNT FLATS
above the WEIGHT CARRIAGE, using two (2) 3/8 X 3 IN. BOLTS, two (2) 3/8 IN. LOCK WASHERS,
and two (2) 3/8 IN. NUTS.
Slide the two (2) ROD END COVERS over the ends of the LAT BAR HOLDER.
Slide the LAT BAR HOLDER over the PULLEY MOUNT FLATS, and LOOSELY assemble in place,
using one (I) 3/8 X 3-1/4 BOLT, and one (1) 3/8 IN. HEIGHT LOCKNUT. (NOTE: USE THE
SECOND SET OF HOLES IN FROM THE END) (SEE DRAWING)
LOOSELY assemble one ( I ) 3-I/20.D. X I IN. BUSHING PULLEY, and two (2) 1/2 IN. LG. PULLEY
SPACER (ONE ON EACH SIDE OF THE PULLEY) between the PULLEY MOUNT FLATS at the
FRONT, using one (I) 3/8 X 3-1/4 IN. BOLTS, one (1) 3/8 IN. LOCK WASHER, and one (I) 3/8 IN.
NUT.
LOOSELY assemble one (1) 4-1/20.D. X 1 IN. BUSHING PULLEY to the PULLEY BRACKET on the
UPI~IGHT BRACE of the MAIN UPRIGHT, using one (1)3/8 X 1-3/4 IN. BOLT, one (I)3/8
LOCK WASHER, and one (I) 3/8 IN. NUT.
LOOSELY assemble one (I) 3-1/20.D. X IN. BUSHING PULLEY tothe LOW ROW PULLEY
HOUSING of the MAIN UPRIGHT~ ~sing one (1) 3/8 X I-3/4 IN. BOLT, one (I) 3/8 IN. LOCI(.
WASI-[ER, and one ( I ) 3/8 IN. NUT.
16.
I-o assemble the PULLEY BLOCK SYSTEM, SECURELY assemble two (2) PAINTED
CONNECTORS around txvo (2) 3-I/2.O.D. X I IN. BUSHING PULLEYS, using two (2) 3/8 X 2
B()I_TS. four (4) 3/8 IN. WASHERS, and two (2) 3/8 IN. LOW HEIGHT LOCK (NOTE:THE
HOLES IN THE PAINTED CONNECTOR ARE OVAL, MAKE SURE THAT THE PULLEYS ARE
AT THE MAXIMUM WIDTH, SEE DETAIL G)
5
03/09/95