Panasonic EY6813-U1 User Manual

SPECIFICATIONS
ORDER NO.PTD0212U38C1
F16
Cordless Rotary Hammer
CONTENTS
Page Page
1 SCHEMATIC DIAGRAM 2
2 WIRING CONNECTION DIAGRAM
3 DISASSEMBLY/ASSEMBLY INSTRUCTIONS
4 TROUBLESHOOTING GUIDE
5 TRIAL OPERATION(after checking TROUBLESHOOTING
2
3
6
GUIDE.)
6 EXPLODED VIEW
7 REPLACEMENT PARTS LIST
© 2002 Matsushita Electric Works Ltd. All rights reserved. Unauthorized copying and distribution is a violation of law.
10
8
9
EY6813-U1
1 SCHEMATIC DIAGRAM
2 WIRING CONNECTION DIAGRAM
2
3 DISASSEMBLY/ASSEMBLY INSTRUCTIONS
HOW TO DISASSEMBLE THE MAIN UNIT.
Ref. No. 1A Procedure 1A Removal of the housing.
1. Set the hammering/drilling switching lever to the position and the speed/blow mode selection lever in between "H" and "S" position.
2. Loosen the support handle and take it out from the unit.
3. Pluck the chuck cover depressing the chuck handle.
4. Remove 15 housing screws.
For assembling NOTE :
Make sure to attach the dust preventive clothes or filters on the housings.
EY6813-U1
Ref. No. 1B Procedure 1A→→→1B Removal of the motor brush assembly.
1. Loosen 2 screws.
3
Loading...
+ 7 hidden pages