Outback Power Systems GS8048 User Manual

MATE3 Programming
IMPORTANT:
Programming should be done by a qualified installer who is trained on programming inverter power systems. Failure to program accurate parameters for the system could potentially cause equipment damage. Damage caused by inaccurate programming is not covered by the limited warranty for the system.
Components
GS8048 Inverter/Charger
RADIAN Series
Major Components
Radian System Products
Note: For automatic generator
start features see the MATE3 manual for details.
MATE3
System
Display and
Controller
Communication
Manager
(HUB10)
FLEXmax 80
Charge Controllers
(x2) (Optional)
Inverter/Charger
GS Load Center
System Display
and Controller
Communications
Manager
FLEXnet DC Monitor (FNDC) Surge Protector Remote Temperature Sensor (RTS)
GS8048
GSLC175-PV-120/240 MATE3 (FW-MB3
mounting bracket)
HUB10 HUB 4
Optional OutBack Components
Charge Controller
*Including appropriate Mounting Bracket.
PV Combiner Box
FLEXmax 80* FLEXmax 60*
PV8 PV12
900-0153-01-00 Rev A.vsd\Page-1 \2013-01-17 ©2012 OutBack Power Technologies. All Rights Reserved.
Color
Green
Yellow
Yellow
Yellow
GS Load Center
FNDC LED Indicators
Battery State-of-Charge
> 90% (blinks if charge parameters are met)
80%
70%
60%
Red
(GSLC)
IMPORTANT:
Not intended for use with
life support equipment.
Customer-Supplied Components
AC Source
Main Electrical Panel
(or overcurrent device for the AC source)
Electrical Distribution Subpanel
(Load Panel)
Battery Bank
Photovoltaic (PV) Array (with PV Combiner Box [PV8 or PV12])
Contact Technical Support:
Telephone: +1.360.618.4363 Email: Support@outbackpower.com Website: www.outbackpower.com
Utility Grid, or AC Generator
Mounting
WARNING: Fire/Explosion Hazard
Do not place combustible or flammable materials within 12 feet (3.7 m) of the equipment. This unit employs mechanical relays and is not ignition-protected. Fumes or spills from flammable materials could be ignited by sparks.
WARNING: Personal Injury
Use safe lifting techniques and standard safety equipment when working with this equipment.
IMPORTANT:
Clearance and access requirements may vary by location. Maintaining a 36” (91.4 cm) clear space in front of the system
for access is recommended. Consult local electric code to confirm clearance and access requ irements for the specific
location.
Radian Dimensions (includes MATE3 and 2 FLEXmax 80 Charge Controllers):
1
Wall Stud
Charge Controller Mounting Bracket
29.1" (85 cm) tall X 35.4" (50 cm) wide
Radian Mounting:
1. Ensure the mounting surface is strong enough to handle 3 times the total weight of
1
all the components. Add a piece of plywood if necessary to strengthen the surface.
2
2. Attach the wall bracket to the surface centering the mounting holes on the sides with the wall studs. Use all 6 mounting screws to secure the bracket.
3
3. Lift the inverter so that the inverter bracket is above the wall bracket.
4
4. Lower the Inverter into place so that the inverter bracket slips into the wall bracket.
5
5. Secure the inverter to the surface using a minimum of 1 wall screw (or other appropriate hardware).
Wall Stud
Wall Board
Inverter Bracket
Side View
900-0153-01-00 Rev A.vsd\Page-2 \2013-01-17 ©2012 OutBack Power Technologies. All Rights Reserved.
Plywood
(Optional)
3
4
Bracket
5
6
6. Follow the instructions for installing the GS Load Center.
7
7. Follow the instructions for installing the HUB Communication Manager.
8
8. Follow the instructions for installing the brackets for the charge controllers.
9
9. Follow the instructions for installing the bracket for the MATE3.
Wall
MATE3
Mounting
9
HUB
Manager
Bracket
7
MATE3
Communication
Radian Series
Inverter/Charger
6
GS Load Center
16" (40.6 cm)
Plywood (Optional)
Wall Bracket
Wall Board
Charge Controller Mounting Bracket
8
Wall Stud
2
FLEXmax 80
Charge Controllers
Wire Sizes/Torque Requirements
GS8048
MATE3
DC
Plate
ON/OFF INV
+ -
RELAY
Switch
Remote
12V
AUX
INV
AUX
9
10
1
N
N
L1 L2
L1 L2
E
E
GEN
OUT
U
U
3
5
6
Jumper
Battery
Temp
N
L1 L2
E
GRID
U
7
Flat Washer
Shunt
2
20
22
18
1112131415
16
Control Wiring Terminal Block:
The Inverter ON/OFF terminals are used for connecting an external ON/OFF switch. To use this feature, the jumper must be removed. (See Radian manual for details.)
The AUX terminals can be used to start a generator or to control external devices.
AUX terminals are also available on the charge controller and the FLEXnet DC. (See the charge controller or FNDC installation manuals for details.)
9
9
HUB10
GSLC
10
Negative Battery Cable Connections
Negative (-)
22
2
4
19
17
Bolt 3/8"
Lock Washer
21
21
1
AC Terminals - Inverter
2
DC Terminals - Inverter AC Circuit Breakers
3
DC Circuit Breakers
4
GFDI
5 6
PV Circuit Breakers Mechanical Interlock (Bypass)
7
PV Input/Output Terminals
8
Communication Ports
9
Auxiliary Terminals
10
AC OUT Bus Bar L1
11
AC OUT Bus Bar L2
12 13
GRID IN Bus Bar L1
14
GRID IN Bus Bar L2
15
GEN IN Bus Bar L1
16
GEN IN Bus Bar L2
17
AC Neutral
18
Ground
19
DC Positive (+) Plate
20
DC Negative (–) Bus Bar
21
PV Positive (+) Bus Bars DC Negative(–)Plate (GS-SBUS)
22
8
Charge
Controller #2
9
8
10
Charge
Controller #1
9
10
Positive Battery Cable Connections
Battery Negative (–) Lug
FNDC
DC Positive (+)
19
RADIAN Series
AC Wire Sizes and Torque Values
Wire Size Torque
AWG In-lb
#14 - 10 20
#8 25
#6 - 4 35
#3 35
#2 40
#1 50
1/0 50
It is recommended that conductors be #6 AWG
THHN copper, or larger, rated to 75°C
(minimum) unless local code requires otherwise.
Minimum DC Cable based on the
DC Circuit Breaker
DC
Circuit
Cable Size
Breaker
125 1/0 (70 mm2)
175 2/0 (70 mm2)
250 4/0 (120 mm2)
Torque Requirements
Circuit Breaker Stud
M8 20 2.3
¼ - 20 35 4.0
5/16 - 18 50 5.6
3/8 - 16 225 25.4
DC Plates
3/8 - 16 225 25.4Upper holes (+) 60 6.8
3/8 - 16 225 25.4Lower holes (+) 225 25.4
Lower holes (+) 50 5.6
3/8 - 16 225 25.4Shunt Bolts (–) and GS-SBUS 60 6.8
CAUTION: Equipment Damage
!
When connecting cables from the inverter to the battery terminals, ensure the proper polarity is observed. Connecting the cables incorrectly can damage or destroy the equipment and void the product warranty.
Flat Washer
Plate
Lock Washer
mm
2.5 – 6
10
16 – 25
35
35
50
70
2
Torque
In-lb Nm
35 4.060 #6 AWG (16 mm2)
35 4.080 #4 AWG (25 mm2)
50 5.6
225 25.4
225 25.4
Torque
In-lb Nm
Bolt 3/8"
Flat Washer
Nut
Nm
2.3
2.8
4.0
4.0
4.5
5.6
5.6
Battery Positive (+) Lug
Energize/Startup Procedures
De-energize/Shutdown
RADIAN Series
Procedures
Pre-startup Procedures:
1. Double-check all wiring connections.
2. Inspect the enclosure to ensure no tools or debris has been left inside.
3. Disconnect all AC loads at the backup (or critical) load panel.
4. Disconnect the AC input feed to the GSLC at the source.
4
To energize or start the OutBack devices:
1. Using a digital voltmeter (DVM), verify 48 Vdc on the DC input terminals by placing the DVM leads on and .
1a 1b
Confirm that the battery voltage is correct for the inverter and charge controller models.
Confirm the polarity.
2a
5
1b
CAUTION: Equipment Damage
!
Incorrect polarity will damage
6
6
3
the equipment.
3a
2. Turn on (close) the GFDI circuit breaker.
1
1
4a4b5a
3. Verify that the PV output for each charge controller is in the correct range of open-circuit voltage and confirm the polarity by:
a) placing the DVM leads on and , and
b) placing the DVM leads on and .
2b2a 2c2a
4. Turn on (close) the PV input circuit breakers.
2
2
3b
5. Turn on (close) the DC circuit breakers from the battery bank to the inverter.
6. If the inverter is in the Off state, turn it On.
7. Verify 120 Vac on the AC Output L1 TBB by placing the DVM leads on and .
8. Verify 120 Vac on the AC Output L2 TBB and .
9. Verify 240 Vac between the AC Output TBBs by placing the DVM leads on and .
10. Turn on (close) the AC output circuit breakers.
4
3a 3c
3b 3c
3a 3b
5
11. Start the generator if appropriate. Verify 120/240 Vac on the terminals of the AC input sources.
12. Turn on the AC input feed to the GSLC at the source.
11. Verify 120 Vac on the GRID IN L1 TBB by placing the DVM leads on and .
12. Verify 120 Vac on the GRID IN L2 TBB and .
4b 3c
13. Verify 240 Vac between the GRID IN TBBs by placing the DVM leads on and .
14. Verify 120 Vac on the GEN IN L1 TBB by placing the DVM leads on and .
15. Verify 120 Vac on the GEN IN L2 TBB and .
5b
3c
16. Verify 240 Vac between the GEN IN TBBs by placing the DVM leads on and .
17. Turn on (close) the AC input circuit breakers.
6
4a 3c
4a 4b
5a
5a 5b
18. Turn on the AC disconnects at the backup (or critical) load panel and test the loads.
900-0153-01-00 Rev A.vsd\Page-3 \2013-01-17 ©2012 OutBack Power Technologies. All Rights Reserved.
1a
3c
5b
3
3c
2b
2c
Functional
Test Points
Battery Voltage Test Points
1a 1b
PV Voltage Test Points
2a 2b 2c
AC OUT Voltage Test Points
(Terminal bus bar = TBB)
3a 3b 3c
GRID IN Voltage Test Points
(Terminal bus bar = TBB)
4a 3c4b
GEN IN Voltage Test Points
(Terminal bus bar = TBB)
5a 3c5b
In 23.2 V 0.0 A Out 27.6 V 0.0 A
0.000 kW 0.0 kWH
AUX: OFF Sleeping
In 23.2 V 0.0 A Out 27.6 V 0.0 A
0.000 kW 0.0 kWH
AUX: OFF Sleeping
WARNING: Burn Hazard
Internal parts can become hot during operation. Do not remove the cover during operation or touch any internal parts. Be sure to allow them sufficient time to cool down before attempting to perform any
Test points 2d and 2e refer to the
right terminal of each circuit breaker.
maintenance.
WARNING: Lethal Voltage
Review the system configuration to identify all possible sources of energy. Ensure ALL sources of power are disconnected before performing any installation or maintenance on this equipment. Confirm that the terminals are de-energized using a validated voltmeter (rated for a minimum 1000 Vac and 1000 Vdc) to verify the de-energized condition.
WARNING: Lethal Voltage
The numbered steps will remove power from the inverter and charge controllers. However, sources of energy may still be present inside the GSLC and other locations. To ensure absolute safety, disconnect ALL power
connections at the source.
Functional
Test Points
Battery Voltage Test Points
1a 1b 1c 1d
PV Voltage Test Points
2b2a 2c 2d 2e
AC OUT Voltage Test Points
(Terminal bus bar = TBB)
3a 3b 3c
1b
2a
2d
1c 1d
2
3c
1d
2e
1b
3a
In 23.2 V 0.0 A Out 27.6 V 0.0 A
0.000 kW 0.0 kWH
AUX: OFF Sleeping
3c
1c
In 23.2 V 0.0 A Out 27.6 V 0.0 A
0.000 kW 0.0 kWH
AUX: OFF Sleeping
1
3
2
4
2a
3b
3c
2a
1 1
4
3
1b
3a
2e
3b
2d
To de-energize or shut down the OutBack devices:
1. Turn off (open) the AC circuit breakers.
2. Turn off (open) the DC circuit breakers for the battery. Wait 5 minutes for the devices to internally discharge themselves.
3. Turn off (open) the PV circuit breakers.
4. Turn off (open) the GFDI circuit breaker.
5. Verify 0 Vdc on the first DC bus of the inverter by placing the voltmeter leads on and .
6. Verify 0 Vdc on the second DC bus by placing the voltmeter leads on and .
7. Verify 0 Vdc on one PV circuit by placing the voltmeter leads on and .
8. Verify 0 Vdc on the other PV circuit by placing the voltmeter leads on and .
9. Verify 0 Vac on the AC output circuit breakers by placing the voltmeter leads on and . Repeat this step for and .
General Wiring
RADIAN Series
AC LEGEND
Neutral
HOT L1
HOT L2
N
L1
L2
Ground
Ground
Electrode
Conductor
(Ground Rod)
AC
Distribution Panel
L1
AC
Source
L1
L2
GROUND
L2
NEU
N
Neutral-Ground Bond
Radian Inverter/Charger
+ -
RELAY
Switch
Battery
12V
Remote
AUX
INV
Temp
AUX
PV Array #1
IMPORTANT: Example only. Actual wiring
may vary depending on local electric code.
PV Array #2
PV Array #2
Factory wiring is not shown.
PV Array #1
AC Generator
Loads
(240 Vac)
AC
Subpanel
L1
GROUND
OIOIOIOIO
I
I
I
OIOIOIOIO
O
PV
LEGEND
N
N
N
L1 L2
L1 L2
L1 L2
E
E
E
GRID
GEN
OUT
U
U
U
L1
L2
N
L1
L1
L1
L2
NEU
Charge
Controller #1
Charge
Controller #2
Battery Bank
I
O
Negative
N
L2
L2
Loads
(120 Vac)
L2
Vented Battery Enclosure
RTS
Positive
Ground
BATTERY
LEGEND
Negative
900-0153-01-00 Rev A.vsd\Page-4\2013-01-17 ©2012 OutBack Power Technologies. All Rights Reserved.
Positive
Ground
Loading...