Oasis PGAC, PG8AC Operator’s Manual

Water Coolers
VERSAFILLER®
Model PWEBF Fountains/VersaFiller combo. Installation Instructions
The Hands-Free VersaFiller is an extension of the Aqua Pointe® product line that mounts directly above Versacooler® I and II products. If the cooler outlet does not have two useable plugs, an outlet splitter will need to be used.
If installed onto a refrigerated cooler, chilled water can be dispensed through the VersaFiller. Otherwise, room temperature water will be dispensed.
The VersaFiller is shipped partially assembled.
On the combo units, the cooler is plumbed and ready to attach to the VersaFiller.
When completed, the finished assembly will look like this:
OR
1
Section 1: Getting Started
What’s Included:
Top Cap
VersaFiller Hands-Free
Bottle Filler
38” of ¼ OD plastic tubing with 19” of sponge tubing insulation (included
with “Versafiller ready” coolers)
Snap bushings 7/8”
and 1½”
Quick connect tee
fitting
Installation instructions
Rubber
Gasket
Versafilter II
Versafilter II is optional
Tools required:
3/8” pilot drill and either a step drill bit up to 7/8” diameter that will drill
through SS top or 7/8” diameter punch die (retrofit version only)
Electric drill; wrench for punch die
Small tubing cutter for copper tube
1/4“ nut driver
# 2 Phillips screw driver
#15 torx bit driver
2
Section 2: Rough In Drawing
Oasis PWEBF: Versacooler® II Models PGAC, PG8AC with Hands-Free VersaFiller
3
Section 2: Rough In Drawing
Oasis PWEBF: Versacooler® II Split Level Models with Hands-Free VersaFiller
* On split level models, the VersaFiller must be mounted
on the low unit in order to meet ADA guidelines.
4
Section 3A: Installation
Note: Proceed to Sect 3B Step 5 “Final steps for both product families” if the cooler is purchased “VersaFiller ready”.
A: Drilling hole in the top for water line connection.
1. Disconnect power by UNPLUGGING unit. It might be necessary to remove the front panel to get access to the power.
2. Turn OFF water supply to the unit. It might be necessary to remove the front panel to access the water stop valve.
3. Place hole template onto cooler top so it is aligned with the left side of unit and wall. SEE NEXT PAGE FOR TEMPLATE
4. Mark hole location
5. Remove top from unit.
Mark hole location.
Template
Remove top from cooler by removing six, #15 torx head screws on sides of top.
6. Using a step drill bit or 7/8” punch die, make a 7/8” hole through top. You may want to drill a pilot hole to get these started.
7. Install snap bushing into hole to protect tubing from being cut.
Install bushing
Drill
5
3-1/4”
from edge of paper
ALIGN THIS EDGE WITH LEFT EDGE OF COOLER TOP
2-1/8”
from
edge of
paper
PLACE THIS EDGE AGAINST WALL
Mark this center point on the top. Remove the top from the
6
cooler. Then create a 7/8” diameter hole through the top at the marked center point (step drill bit or punch die).
USE THIS TEMPLATE TO MARK THE
HOLE LOCATION ON COOLER TOP
Section 3A: Installation
Versacooler to Bottle Filler Plumbing Diagram
OPTIONAL VERSAFILTER II
BOTTLE FILLER
DISPENSE SOLENOID
INLET STRAINER,
TUBE, AND
REDUCER FTG.,
PROVIDED WITH
FOUNTAIN.
BUILDING
INLET WATER
VERSACOOLER
7
Section 3A: Installation
Two Versacoolers to Bottle Filler Plumbing Diagram
INLINE STRAINER, TUBE, AND
REDUCER FTG.,
PROVIDED
WITH FOUNTAIN
OPTIONAL
VERSAFILTER II
BOTTLE FILLER
DISPENSE
SOLENOID
BUILDING
INLET WATER
VERSACOOLER
T-FITTING
VERSACOOLER
8
Loading...
+ 18 hidden pages