NOYAFA NF-701 User Manual

Page 1
Your excellent helper in cable test!
USER'S MANUALUSER'S MANUALUSER'S MANUALUSER'S MANUAL
CCTV Tes t e r 3 G / H D S D I
NF-701/NF-703/NF-705
Your excellent helper in cable test!
SHENZHEN NOYAFA ELECTRONIC CO.,LTD
P
t
n
u
o
C
ORIGINAL
ORIGINAL
AUTHENTIC
AUTHENTIC
d pr
o
e
d
t
e
t
a
ng
i
t
o
i
t
e
f
r
e
u
c
t
s
,
a
l
l
o
w
e
d
REV 1.0
Page 2
CONTENTS
1 Safety Information----------------------------------01 2 Brief Introduction-----------------------------------02
2.1 Features-----------------------------------------02
2.2 CCTV tester Kits -----------------------------------02
2.3 Front Panel---------------------------------------03
2.4 Side View ----------------------------------------04
2.5 General Specification -------------------------------05 3 Operation-----------------------------------------08
3.1 Power on/off --------------------------------------08
3.2 Main menu introduction------------------------------08
3.3 Set-up of System ----------------------------------08
3.4 Video Signal and Cloud Test --------------------------09
3.5 Ethernet cable testing -------------------------------12
3.6 Video Signal generator function------------------------12
3.7 RS485 Signal control testing --------------------------13
3.8 Function of Digital Multimeter--------------------------14
3.9 HD/3G-SDI Video Signal and Cloud TerraceTesting---------16
3.10Power Supply for Camera----------------------------18
3.11 Audio Testing ------------------------------------18
3.12 LED Electric Torch lighting --------------------------18 4 Warranty------------------------------------------19
4.1 Warranty items ------------------------------------19
4.2 Warranty exception---------------------------------19
4.3 Complemented items -------------------------------19
Your excellent helper in cable test!
Page 3
一.Safety matters
二. CCTV tester's Introduction
1.1 Safety Notice:
Read this manual carefully before you use it.
Pls check the power supply accessories good or not before you connect the power,and check
other relative accessories carefully.
Meet the work conditions as below:
1.Temperature :-20℃~65℃
2.Humidity :30%~90%
3.Voltage: DC 12V /2A
Don't use the tester where the humidity is high.Once the tester is damp,power off immediately,
pls move away other cables connected.
To prevent the functional decline or failure, the item should not be sprinkled or damped.
The exposed part of the tester should not be touched by the dust and liquid.
During transportation and use, it is highly recommended to avoid the violent collision and
vibration of the tester, lest damaging components and causing failure.
Don't leave the tester alone while charging and recharging. If the battery is found severely hot,
the tester should be powered off from the electric source at once. The test should not be charged over 8 hours.
The tester should not be used in the environment with the flammable gas.
Do not disassembly the instrument since no component inside can be repaired by the user. If
the disassembly is necessary indeed, please contact with the technician of our company.
The instrument should not be used under the environment with strong electromagnetic
interference.
Don't touch the tester with wet hands or waterish things.
Don't use the detergent to clean and the dry cloth is suggested to use. If the dirt is not easy to
remove, the soft cloth with water or neutral detergent can be used., but the cloth should be tweaked sufficiently.
1.2 Notice of Digital Multimeter :
◆ Do not exceed the specific scale in case there is a breakdown.
◆ For your safety and to prevent electronic shock when test at above DC60V & AC40V.
◆ After make accurate gear option, then begin to test by inserting meter probe.
◆ Allowed not to insert meter probe before make gear option.
◆ Allowed not to test voltage at gear options of Resistance,Diode and contiunity.
◆ Allowed not to test Resistance,Diode and contiunity at gear option of voltage.
◆ Take out meter probe and leave the test point to change next test.
◆ Back to main mode as test different gear options with finding errors displayed on the screen window of the meter,and enter into meter test mode again to have the accurate gear position.
2.1 Overview:
The CCTV tester is developed for the On-Site installation and maintenance of video monitoring system. It can be used for displaying video, controlling PTZ, generating images, capturing data of RS485 and testing LAN cable etc. Its easy to operate, and simple for the technician to install and maintain CCTV system, improving work efficiency and get the labor cost down.
2.2 Features:
3.5 TFT-LCD , 960(H)×240(V)resolution.
3 kinds of language: Chinese, English and Spanish can be slected.
Video Level testing, video signals measured in IRE or Mv.
DC12V 1A power output for camera.
Audio input testing .
Digital multimeter, voltage, current, resistance and capacitance can be tested, continuity
testing, diode testing.
PTZ control. Pan/tilts the P/T unit, zooms in/out the lens, adjusts the focus, aperture and sets
and calls the preset position.
PTZ continuing rotate test.
Video displaying. Automatically adapts and displays the video format of NTSC/PAL.
LCD Brightness/Contrast/Color Saturation is adjustable.
Video Generating, The PAL/NTSC multi-system color bar video generator (seven-system
switchable, transmit/receive seven-system colorful imagines) .
Data analyst. Captures and analyzes RS485 controlling data to help the technician to find out
the problem.
Cable testing. It is powerful in testing LAN cable, measuring the connecting status, displaying
the sequence of connection and the NO. Of the LAN cable.
Multi-interface and Multi-baud rate. Support RS232 ,RS485 and RS422 interface; baud rate
ranging from 150, 600 to 19200bps.
Multi-protocol.Supports more than twenty PTZ protocols.For example,PELCO-P,PELCO-D,
SAMSUNG etc.
PTZ address scanning, search up the ID of PTZ camera.
Lithium Ion Polymer Battery(3.7V DC3000mAh).The device employs advanced power control
and protection circuit. The device is high power-efficient, energy saving and environmental protection. It can last 12 hours for normal use after charging for 4 hours.
01 02
Your excellent helper in cable test!Your excellent helper in cable test!
Page 4
2.3 Function details
1. The video signal testing function (NF - 705 including sim ul at io n st an da rd d ef in it io n video CVBS, HD / 3 g - SDI HD video)
The built-in 3.5 inch TFT LCD screen, intuitive and convenient showed that the quality of the camera video equipment such as ball machine images Can be measured, Test the analog video signal, support NTSC/PAL image signal. also can directly test the HD/3g-SDI HD video signals, support 720 p24, 25,30,50,60;1080 p24, 25,30,50,60;1080 i50, 60 frame rate, etc.
2. The video signal attenuation analysis function
Test whether video signal intensity attenuation is too high or not. As the video signal Cable is too long cause decay, video signal attenuation can create image dim, reduce image dynamic range; if Video signal too strong,will cause the virtual shadow,lower image quality.This item can capture and analyze synchronization level signal test and analysis of synchronization Video signal attenuation amplitude, help to analyze video cable quality construction personnel. If beyond the normal range, the tester screen will have corresponding hints.
7. RS485 protocol testing
This product can control testing equipment output of RS485 signals, detect the detailed data of RS485 signal directly Shown on the screen,easy to get the capture and analysis to the signal data.
8. High precision digital multimeter functions (NF - 703, NF - 703)
Built-in high-performance, low power consumption, 3 3 / 4 a counting (4000) automatic range digital multimeter, clear reading, Single test method,Can be used to measure the AC voltage, DC voltage and resistance, on-off testing, diode,high measurement range and high accuracy that more convenient construction personnel for efficient analysis and testing of the circuit.
9. The audio test
Built-in amplifier circuit, magnetic speaker within 1 w, front- end can connect microphones and other audio signal test.
2.4 Packing Accessories
3. Cloud control function
Users can via this product RS485 interface to control cloud from top to bottom and turn around, change times +/- : focus+/ aperture control,preset Settings and calls,address code set. Mainly is the RS485 communication interface control; Support of RS485 protocol includes: Pelco D, Pelco P, samsung, panasonic, Ming jing, Vito, Ann and more than 20 Kind of agreements, can also according to customer demand to increase agreement;Support the baud rate include:2400, 4800, 9600, 19200.
4. The camera power supply function
This product is specially set up for the camera power supply DC12V/1 a power supply output port, provide temporary for the camera. The power supply. mainly used in some cameras live demonstration and test, at the same time, for some need to install the camera fields, because there is no power supply prior to the implementation of the scene, must find a temporary power supply for camera, it Plays a role of the power supply output.
5. Video color bar signal
This product can produce high standard color bar signal and white, blue, purple, green, yellow, black, red seven color standard video signal, NTSC / PAL video signals, video signal is optional. Video output to the external display device to help test Channel line,and the working state of the display devices are in good condition or not.
6. Ethernet cable testing
Cooperate with parts of the network cable test head, which can realize visualized wiring and wiring sequence, detection Cable is connected correctly or not, is open circuit or line order wrong, etc.
Include
CCTVmain tester
Lithium Ion polymer batt er y
DC12V 2A Power Supply
LAN Cable Tester
BNC Cable
Audio Cable
Rs485 data cable Gel-cover (Without for NF- 70 1)
Pendent Rope
Camera Power cable
Meter Probe
User Manual
Pack
Quantity
1pcs
1pcs
1pcs
1pcs
1pcs
1pcs
1pcs
1pcs
1pcs
1pcs
1set
1set
1set
03 04
Your excellent helper in cable test!Your excellent helper in cable test!
Page 5
2.5 Front indicator diagram
2.6 Left side indicator diagram
1
2
3
4
5
6
7
8
9
10
11
12
13
1. RS485 Signal Indicator Lamp
2. 3.5 inch,TFT Color Screen,960x240 Resolution
3. Direction key control:Up and down,right and left
4. Menu
5. 0—9 number keys, shortcut
6. The host S/N code display
7. RE:Loss test of video signal
8. Aperture on: Open the aperture
9. Focus Camera: distant lens focus
10. Aperture off: stop down aperture
11. Focus Camera: close to lens focus
12. LED lighting lamp: ON/OFF
13. Multimeter's slot of G line,negative,black terminal(NF-703,NF-705)
14. RS485 data receiver indicator lamp
15. Set-up
16. Delete
17. Call pre-set
18. Increase lens' focal length & transmit signal of video test
19. Set up the call pre-set
20. Decrease lens' focal length & stop down signal of video test
21. Set up PTZ control code
22. Multimeter's live wire pole, positive, red terminal(NF-703,NF-705)
14
15
16
17 18
19
20
21
22
1
2 3 4 5
1. Ethernet cable port
2. External power DC12V working lamp
3. DC12V power slot (Positive within and Negative with-out)
4. Power Switch
5. Back cover screw
2.7 Right side indicator diagram
1. Horn
2. DC 12V output
3. Audio Input
1
2 3
2.8 Top side indicator diagram
1. HD/3G SDI Video signal input , BNC Pole.
2. Analog Video Signal output, BNC Pole.
3. Noctilucent LED lighting.
4. RS485 port.
1
2 3 4
05 06
Your excellent helper in cable test!Your excellent helper in cable test!
Page 6
2.9 Technical parameters
三. Operation Instruction
MODEL
Video Test
Signal mode Display LCD adjustment Video IN/OUT Video Output Mode
Video Level test
Level test
PTZ controller
Communication PTZ Protocol Baud Rate
Video Signal Generation
Color bar generation
Digital multimeter
Multimeter
UTP CABLE TEST
UTP cable test
DC12V 1A power output
DC12V power output
Audio input test
Audio input test
RS485 data analyst
Data Monitor
POWER
Power Adapter Battery
NF-701/NF-703/NF-705
NTSC/PAL (Auto adapt)
3.5 inch digital TFT-LCD ,960 x 240 resolution Brightness, Contrast, Saturation adjustable 1 channel BNC Input & 1 channel Output
1.0 Vp-p
3.1 Power supply
a. Turn “ON” to open the tester on the left side. b. Pls don't fix the battery by yourself to avoid any damages. c. Pls charge more than 4 hours of the battery to make sure can work normally. d. If the out of power, pls charging power to continue work. e. You can press 9 to choose if you want to show the power display or cloaking on the screen.
3. 2 Main menu introduction
Video signals measured in IRE or mV
Rs232, RS422 simplex and RS485 Compatible with more than 20 protocols such as
PELCO-D/P, Samsung, Panasonic, Lilin, Yaan, etc. 150,300,600,1200,2400,4800,9600,19200bps
Output one channel PAL/NTSC colorbar video signal for testing monitor or video cable.
Voltage, current, resistance and capacitance measuring, continuity testing, diode testing.
1. 1-7 Submenu;
2. Keys number for corresponding submenu;
3. S/N code unable to be edited;
1 Set-u p of s ystem
2 Video & Clo ud Terra ce Test
3 Etherne t ca ble Test
4 Video Sig na l Generat or
5 RS485 Sig na l co ntrol
6 Digital Mul ti meter
7 HD/3G-S DI V id eo & Cloud Test
S/N:NF7 05 0140306
3.3 Set-up of system
Test UTP cable connection status and display in the screen. Read the number of the test box.
Output DC12V1A power for camera
test the pickup and other audio equipments on the front-end
Captures and analyzes the command data from controlling device
DC5V, 2A Built-in 3.7V Lithium polymer battery ,3000mAh
Press【1】, enter into system to set-up, as the below illustration:
Proto col
Form of commun ic ation
Baud Rate
Operati ng S peed
Stand-by ti me
Audio Test
Languag e
1. Press【Set-up】to enter into function slection.
2. Press “ ” or “ ”(PTZ Up/Down ) into page setup.
3. Press “ ” or “ ”(PTZ Left/Right) to adjust Parameter Settings which you working on.
4. Press【Delect】to Esc the menu.
5. Long press【MENU】to ecs system info. Submenu, back to Main Menu.
PELCO D
485
2400/4800 /
9600/19 200
0-16
002
On/off
Chinese /E ng lish/
Spanish
07 08
Your excellent helper in cable test!Your excellent helper in cable test!
Page 7
3.4 Video Signal and Cloud Test
In the main menu mode,Pres s2to e nt er i nt o Vi de o Si gn al a nd C lo ud T es t.
1. Analog video signal test
(Image 1) (Image 2)
1) Connect camera's video output pole to the host's Video input pole, the image can be displayed clearly on the LCD screen under mode of video and cloud test (Image 1).
2) The first line will displays the PTZ control address on the up-left s, and the second displays video form: PAL or NTSC, “NULL” means no signal (Image4).
3) To connect camera's video output pole to the host's Video input pole, and connect the host's Video output pole to monitor's Video input pole in the meantime, the video collected by camera will be displayed on screen.(image2).
2. PTZ Cloud Terrace Control Test
Decice connecting:
To connect the device to PTZ camera (image3).
The submenu of Video and Cloud Terrace Test as the below illustration.
PTZ Add ress
001 -255
A. PTZ Address Code set-up
1) Press【Address】key firstly and input controlled number to PTZ address or modify the address;
2) Press【Set-up】key to save, or press【Delete】to cancel
3) Press【MENU】key to hide PTZ control function menu l;
4) Long time Press【MENU】back to main menu.
B. PTZ Cloud Control When connect PTZ to the device correctly, the camera image will be displayed on screen. When through system set-up menu correctly to set up the communicating protocol, and after the baud rate choose the relative PTZ address, it is allowed to select if hide PTZ control menu or not on personal use, then user can follow the steps to control PTZ as below.
1) Press “ ” or “ ” key, PTZ Up/Down.
2) Press “ ” or “ ” key, PTZ Left/Right.
3) Press【Focus far】or【Focus near】to open or closed aperture, adjust aperture parameters;
4) Press【Focus Distant】or【Focus Close】to manually adjust focus parameters.
5) Press【Zoom Large】or【Zoom Minor】to manually adjust camera's zoom parameters.
Addre ss : 0 01
Video Form: NU LL
(Image 4)
Camera form
PAL/ NT SC /NULL
C. Pre-set
1) Under the video and PTZ cloud terrace control, press 【Pre-set】and input your needed number to adjust the signal, press【set】key to confirm or press【Delete】key to give up setting. It is available to set up many times if we follow these steps.
(Image 3)
09 10
2) At mode of video and PTZ cloud terrace control, press【Call Pre-set】 and input the needed number , press【set】key to confirm or press【Delete】key to give up setting. It is available to set up many times if we follow these steps.
Your excellent helper in cable test!Your excellent helper in cable test!
Page 8
3. Analysis of Video Signal Loss
Under the video and PTZ cloud terrace control with Analog Video Signal connecting in and being displayed formally , press 【1】 to procure parameter of Video Signal, it includes.
1) Maximum Vpp: Difference value between Maximum value and Minimum value of video signal solidity, the larger of the value is, the brighter the screen display is.
2) Average Vpp: indicates video signal strength difference between the maximum and minimum values of the average.
3) Synchronizing level: indicates the synchronizing level Video Signal strength, it is used to test coaxial cable's resistance. For example, if camera's synchronizing level is 0.3V(generated by connecting CCTV tester and camera),after transmit in a exact distance , synchronizing level dEscends to 0.21V(generated by CCTV tester), in this case, it means that video signal solidity decayed for 30% and user procure the resistance of coaxial cable.
4) If there is no video signal access, it will indicates “NULL” .
3.5 Ethernet cable testing
1. As image 5 shown, connecting CCTV Tester ­ net cable -cable tester
2. In main menu display, press number【3】to switch in mode of Ethernet cable testing;
3. Press【set】key to start testing,connecting status and it's sequence will display on LCD screen;
4. It is available for users to judge the network cable connecting situation according to the LCD displayed information.
5. Long Press 【MENU】Key to Esc mode of Ethernet cable testing, and back to main menu;
(Image 6)
4. Screen setting
At mode of video and PTZ cloud terrace control, press【set】key to enter into screen setting .
Contras t
Brightn es s
Color Staturati on
1) Press“ ”or“ ” key(PTZ UP/DOWN)to set;
2) Press“ ”or“ ” key(PTZ LEFT/RIGHT)to adjust.
3) Press【Delete】key to ecs.
4) Long press【MENU】key to cancel system and back to main menu.
← ← ←
Contras t
Brightn es s
Color Staturati on
(Image 5)
128
128
128
Contras t Valu e
Brightn es s Valu e
Color Staturati on Value
Etherne t ca ble conne ct ing test
Arrangi ng s equence i n te ster
x means op en c ircuit
← ←
If the connecting2 cables result show “x” ,there are 2 situations:
1. Both of lines in open circuit.
2. Both of lines in short circuit.
CCTV t ester por t
network li ne o rd er
1 --- ----3 2 --- ----6 3 --- ----1 4 --- ----x 5 --- ----x 6 --- ----2 7 --- ----7 8 --- ----8
(Image 7)
3.6 Video Signal generator function
In image 8, connecting video output pole of CCTV tester to display device.
(Image 8)
11 12
Your excellent helper in cable test!Your excellent helper in cable test!
Page 9
1. In main menu, press number【4】 , switch into mode of generator of analog video signal:
2. Set Baud Rate of RS485 protocol testing in system information menu.
(Image 9)
2. Press【Set】, enter into video signal selection.
Video Sig na l Option
Video Form Opt io n
Mode of Vid eo Signal Ou tp ut
1) Press“ ”or“ ” key(PTZ UP/DOWN)to set.
2) Press“ ”or“ ” key(PTZ LEFT/RIGHT)to adjust.
3) Video Signal Option:Color Bar: white,Blue,Purple,Green,Yellow,Black,Red.
4) Video Form Option; PAL,NTSC.
5) Video Signal Output: ON / OFF.
6) Press【Delete】key to Esc.
7) Long press【MENU】key to Esc video color bar, back to main menu.
← ← ←
Video Color Bar
Form PAL
Output On
8 Signal Op ti ons
PAL/ NT SC O ptions
← ←
Input / Out pu t
3.7 RS485 Signal control testing
1. Connecting CCTV Tester to PTZ device, like image10.
Form of commun ic ation
Baud Rate
3. Under main menu display, press number【5】,switch into signal control menu.
4. When manipulate PTZ control device to send out RS485 signal , then the hexadecimal communicating data signals are display on screen, and engineers can analyze signal which send out from the device whether is right or was needed.
485
2400
Rs485 Signal Control S up er vi so ry
(Image 11)
RS485 Signal Control Supervisory A0 00 01 00 00 00 AF 0F A0 00 00 00 00 00 AF 0E A0 00 00 01 00 00 AF 0F A0 00 01 00 00 00 AF 4F A0 00 00 00 00 00 AF EF A0 00 00 00 00 00 AF 2F
(Image 12)
RS485 Con tr ol Form485
Chose aso ci at ed baud rat e
5. Long press【MENU】key to Esc the mode of Signal Control Supervisory, back to main menu.
3.8 Function of Digital Multimeter(NF-703,NF-705)
(Image 10)
(Image 13)
13 14
Your excellent helper in cable test!Your excellent helper in cable test!
Page 10
1. Connecting probe of multimeter to CCTV Tester.
2. In main menu, press number【6】, switch into multimeter function menu:
1). Press“ ▲ ”or“ ▼ ” key (PTZ UP/DOWN)to set(DC voltage / AC voltage or Resistance/diode on-off measurement.
2). Press【Set】to to choose and switch into DC voltage / AC voltage.
3). Press【Set】key to choose and switch into Resistance/diode on-off measurement.
4). In digital multimeter mode, long press 【MENU】key to return back to main menu.
5). Working modes info. Displayed on TFT screen.
L 0. L
V V
Setkey to select gear
Ω
Setkey to select gear
Ω
Notice:
1).The measured voltage can't exceed range.
2). Before Choose the measuring gear,Pls don't put the probe on the measuring place , must choose the gear , then start to oprate.
3). In case of error displayed on screen when you check up testing information, please long press [MENU], Esc multimeter mode so as to reset it, and press number【6】enter again into multimeter mode to test at specific gear.
AU TO
DC
0 0 0.1
V V
Setkey to select gear
Ω
Setkey to select gear
Mode of DC voltage testing
(Image 14)
AU TO
L 0. L
V V
Setkey to select gear
Ω
Setkey to select gear
Mode of Resistance Testing
(Image 16)
mv
mΩ
AU TO
AC
0 0 0.1
V V
Setkey to select gear
Ω
Setkey to select gear
Mode of AC voltage testing
(Image 15)
L 0. L
V V
Setkey to select gear
Ω
Setkey to select gear
Mode of Diode Testing
(Image 17)
Mode of Continuity Testing
(Image 18)
v
3.9 HD/3G-SDI Video Signal and Cloud Terrace Testing(NF-705)
When you open the device, press number 【7】to enter into mode of HD/3G-SDI video and cloud terrace testing.
1. HD/3G-SDI Analog Video Signal Testing.
v
(Image 19)
To connect the video output pole to the HD/3G-SDI input pole, Images canl be displayed on the LCD screen clearly at the mode of HD/3G-SDI video and cloud terrace testing.
2. PTZ Cloud Terrace Testing.
1).Follow image 1, connecting the device to PTZ camera.
2).Submenu of HD/3G-SDI video and cloud terrace testing as below.
15 16
Your excellent helper in cable test!Your excellent helper in cable test!
Page 11
PTZ addre ss
video: HD /3 G- SDI
addre ss : 0 01
Video Form
HD/3G-S DI
Contras t
Brightn es s
Color Sat ur ation
Contras t 128
Brightn es s 128
Color Staturation 128
Contras t Valu e
Brightn es s Valu e
Color Statu ra tion Val ue
(Image 20)
3. PTZ Address Code Setting
1).Press【Address】key and input number according to specific PTZ address or modify PTZ address.
2).Press【Set】key to save or press【Delete】key to Esc.
3).Press【MENU】key to hide PTZ control function.
4).Press【MENU】Key to return back to main menu.
4. PTZ Cloud Terrace Control. When connect PTZ to the device correctly, the camera image will be displayed on screen. When through system set-up menu correctly to set up the communicating protocol, and after the baud rate choose the relative PTZ address, it is allowed to select if hide PTZ control menu or not on personal use, then user can follow the steps to control PTZ as below.
1).Press “ ” or “ ” key (PTZ UP/DOWN)to choose.
2).Press “ ” or “ ”key (PTZ UP/DOWN)to choose.
3). Press【Aperture on】or【Aperture off】to open or shut aperture and adjust aperture parameters.
4). Press【Focus Distant】or【Focus Close】to manually adjusts focus parameters.
5). Press【Zoom Large】or【Zoom Minor】to manually adjusts camera's zoom parameters.
5. Pre-set
1) Under the video and PTZ cloud terrace control, press 【Pre-set】and input your needed number to adjust the signal, press【set】key to confirm or press【Delete】key to give up setting. It is available to set up many times if we follow these steps.
2) At mode of video and PTZ cloud terrace control, press【Call Pre-set】 and input the needed number , press【set】key to confirm or press【Delete】key to give up setting. It is available to set up many times if we follow these steps.
6. Parameter Settings screen function. At mode of video and PTZ cloud terrace control, press【set】key to enter into Parameter Settings screen function .
(Image 21)
1) Press“ ”or“ ” key(PTZ UP/DOWN) choose to set;
2) Press“ ”or“ ” key(PTZ LEFT/RIGHT)to adjust.
3) Press【Delete】key to Esc.
4) Long press【MENU】key to Esc system and back to main menu.
3.10 Power Supply for Camera (DC12V)
In image, connecting camera power input pole and CCTV Tester's power output pole by power cable : It takes different timing of power supply towards different device models. The camera in lower current than 1000mA is to be in more than 10 hours. The maximum current of power supply towards CCTV Tester is 1000mA, please make use of appropriate camera. Notice: CCTV Tester power output DC12V, please do utilize appropriate camera.
(Image 22)
3.11 Audio Testing
It is requested to turn on in Setting Menu on ” at first step as audio testing, and connect audio signal to launch audio system.
3.12 LED Torch lighting Function
17 18
Your excellent helper in cable test!Your excellent helper in cable test!
Page 12
四. Warranty
4.1 Warranty time
Since the delivery day:
1) Exchanging service within 7 days from the receiving day, we responsible for theFreight charge (battery exchanging service within 90 days from the receiving day).
2) Repairing service within 2 years, change accessories and repair for free, customers Should responsible for the freight charge (repairing service don't include battery).
3) We provide whole life repairing service for our products with proper charge,Customers should responsible for the freight charge.
4.2 Warranty exception
We provide repairing service with proper charge, customers responsible for the Freight charge.
1) Damage caused by abuse, unreasonable use, mistreatment, or neglect.
2) Damage caused by modification or repair not authorized by our company, working in hostile environments or natural disaster.
3) Damage caused by improper or improperly used packaging, or other devices work in the same system.
4.3 supplement
1) Company is not responsible for other assurance and other derivative from capital loss: The product and the user guides are not assured for particular users and some special purpose of use.
2) If the products returning for exchanging was damaged, modified or miss accessory,we will charge the proper payment.
3) If the components are no longer produced during the warranty-limited period,company will make a decision to replace similar products at no charge.
4) Don't offer exchanging service for special design products by customers.
NF -306 NF -868 NF -820 8
NF -801 B NF -806 R
NF -816
NF -468 L NF -346 8 NF 8108 -M
NF -388 NF -903 NF -906 A
19 20
Your excellent helper in cable test!Your excellent helper in cable test!
Loading...