Nortel 100/200, 100, 200 Quick Install Manual

e
d
c
b
25
26
1
2
4
6
8
10
12
3
5
7
9
11
13
14
16
18
20
22
24
15
17
19
21
23
25
26
28
30
31
33
35
27
29
31
33
35
37
38
40
42
44
46
48
39
41
43
45
47
Status
PWR
Reset
PoE
Steps 1 3
Before you start
Steps 4 7
Mounting Options
Steps 10 16
Initial Access and Configuration
Steps 8 9
Powering Up
BES100/200
Business Ethernet Switch 100/200 Series Quick Install Guide
All documents referenced in this Quick Installation Guide can be downloaded at www.nortel.com.
13
12
11
10
9
8
1
3
4
5
6
2
7
14
15
16
100
200
100
200
1. Confirm that you have the tools and package
contents as follows: Tools Required:
a. Phillips #2 screwdriver
Package Contents:
b. BES100 or BES200 series Switch c. Rack-mounting hardware
• Rack-mount brackets (2)
• Screws for attaching brackets to the switch (8)
• Screws for attaching the switch to the equipment rack (2x4) Choose the appropriate set of rack-mount screws for attaching the switch to your data or phone rack.
d. Adhesive foot pads (4) e. AC power cord
2. (Optional) Prepare the rack: a. Provide a 2.8 inch space for each switch
in an EIA or IEC-standard 19-inch (48.2-centimeter) equipment rack.
b. Bolt the rack to the floor and brace it if
necessary.
c. Ground the rack to the same grounding
electrode used by the power service in the area. The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode. Nortel recommends using a filter or surge suppressor.
3. Check your cables; when you install the switch into a
network, make sure you use the following required cables:
• Category 3, 4, or 5 UTP cable with an RJ-45 connector (for 100 Mb/s operation).
• Category 5 UTP cable with an RJ-45 connector (for 100 Mb/s operation). The stacking cable for the BES 200 is a CAT5 Ethernet cable.
• Category 5 Four-Pair UTP cable with an RJ-45 connector (for 1000 BASE-T ports with 1000 Mb/s operation).
• Console Port Straight-through serial cable with DB-9 female connector at one end.
4. If you are mounting the switch on
a table or shelf, attach the rubber feet to the device as indicated.
5. Set the device on a flat surface near an AC
power source, making sure there are at least 2 inches (5.1 cm) of space on all sides for proper air flow and at least 5 inches (12.7 cm) at the back for power cord clearance.
6. If you are mounting the
switch on a rack, attach the brackets to each side of the device using the screws provided.
a. Slide the switch into the
rack. Insert and tighten the rack-mount screws.
8. Connect the AC power cord to the back of the switch, and
then connect the cord to an AC power outlet.
Warning: You must use a line cord set approved for the receptacle type in your country.
9. Check the
front-panel LEDs as the device powers on to be sure the PWR LED is lit. If not, check that the power cable is correctly plugged in.
The BES100 and BES200 series switches begin switching data as soon as you attach network devices and connect the switch to the power supply.
With the BES200 series switch, traffic is switched across all units in the stack and uses the 2 GBytes (gigabyte) of bandwidth across the stack connections as if it were one switch.
10. To access the BES100 or BES200, first
install the Business Element Manager 1.0. Refer to Element Manager documentation at www.nortel.com for instructions.
11. Start the Element Manager.
12. From the Element Manager menu,
choose Network > Find Network Elements > Business Ethernet Switch.
13. Enter the range
192.168.1.1 to
192.168.1.255, and then click OK.
14. From the list of network
elements on the Element Manager tree, select the BES device.
15. Click the Web Page
button on the Element Manager menu.
16. From the main menu,
choose Administration > Quick Start.
The Quick Start screen appears. It shows the IP address and other items that can be optionally configured.
If you want to manually assign IP addresses, refer to the Business Ethernet Switch 100/200 Series User Guide on www.nortel.com.
Refer to Using the Nortel Business Ethernet Switch 100/200 at www.nortel.com for detailed installation instructions.
You are now ready to use the BES100 or BES200 series switch in your network installation.
25
26
1
2
4
6
8
10
12
3
5
7
9
11
13
14
16
18
20
22
24
15
17
19
21
23
25
26
28
30
31
33
35
27
29
31
33
35
37
38
40
42
44
46
48
39
41
43
45
47
Status
PWR
Speed Link/Act
Reset
PoE
25
26
1
2
4
6
8
10
12
3
5
7
9
11
13
14
16
18
20
22
24
15
17
19
21
23
25
26
28
30
31
33
35
27
29
31
33
35
37
38
40
42
44
46
48
39
41
43
45
47
Status
PWR
Speed
Link/Act
Reset
PoE
25
26
1
2
4
6
8
10
12
3
5
7
9
11
13
14
16
18
20
22
24
15
17
19
21
23
25
26
28
30
31
33
35
27
29
31
33
35
37
38
40
42
44
46
48
39
41
43
45
47
Status
PWR
Speed Link/Act
Reset
PoE
N0131605
7. If you are stacking the BES200 switches, the fixed, dedicated
1000BASE-T ports on the rear panel of the units can stack up to four BES 200 series switches. These fixed ports allow you to configure and manage the switches as a single switch and control the flow of network traffic. The cable connections need to cross over in the BES200 units so that the UP port connects to the Down port of the next unit, and vice versa.
AC LINE 100-240 VAC 50-60 Hz
2.9 A MAX
Cascade Down Cascade Up
Unit Select
Base
25 26
1
2 4 6 8 10 12
3 5 7 9 11 13
14 16 18 20 22 24
15 17 19 21 23 25
26 28 30 31 33 35
27 29 31 33 35 37
38 40 42 44 46 48
39 41 43 45 47
Status
PWR
Speed Link/Act
Reset
PoE PoE
AC LINE 100-240 VAC 50-60 Hz xxx A MAX
BES 220-24T-PWR
Up
2422
2018
2321191713
15
14
16
1
3
5
7
9
11
2
4
6 8 10
12
25 26
Down
Base
Status
PWR
Reset
Console
Speed Link/Act Link/Act
PoE
PoE
C
M
Y
CM
MY
CY
CMY
K
BES100_200_QuickInstallGuide4.pdPage 1 8/24/2006 2:44:38 PM
Loading...