Nokia BTS2500C Manual

0 (0)

Exhibit 8

 

Installation and Operation Manual

FCC ID: PHX-BTS2500C

Exhibit 8

Installation and

Operation Manual

NextNet® Wireless, Inc.

 

 

9555 James Ave. South Suite 270

 

 

Bloomington, MN 55431

Page 1 of 117

6/16/2005

Configuring, Installing, and

Using Carrier Infrastructure

Broadband Wireless Access System

Part Number: 104-0350-0004_DRAFT

i

BaseConnect, Expedience, NetProvision, and ProvisionLink are trademarks of NextNet Wireless, Inc. ©2000-2005 NextNet Wireless, Inc. All rights reserved. Revision 4_3_C

WARNING: This equipment has been tested with a 19 dBi gain antenna and found to comply with the FCC guidelines for Radio Frequency Radiation Exposure Limits as detailed below. For a single base 5 watt transmitter connected to the antenna, a minimum of 2 meters or 6.5 feet of separation between the antenna and all persons must be maintained. The minimum separation increases when additional base transmitting signals are combined and applied to the same antenna. Four base 5 watt transmitters combined to use a single antenna need a minimum separation of 4 meters or 13 feet from all persons.

Radio Frequency Radiation Exposure Limits.

TABLE 1. Limits for Maximum Permissible Exposure (MPE)

Frequency range

Electric field-

Magnetic field-

Power density

Averaging time

(MHz)

strength (V/m)

strength (A/m)

(mW/cm 2)

(minutes)

 

(A) Limits for Occupational/Controlled Exposures

 

0.3-3.0

614

1.63

*(100)

6

3.0-30

1842/f

4.89/f

*(900/f2)

6

30-300

61.4

0.163

1.0

6

300-1500

f/300

6

1500-100,000

5

6

 

(B) Limits for General Population/Uncontrolled Exposure

 

0.3-1.34

614

1.63

*(100)

30

1.34-30

824/f

2.19/f

*(180/f2)

30

30-300

27.5

0.073

.2

30

300-1500

f/1500

30

1500-100,000

1.0

30

f = frequency in MHz

* = Plane-wave equivalent power density

NOTE 1 TO TABLE 1: Occupational/controlled limits apply in situations in which persons are exposed as a consequence of their employment provided those persons are fully aware of the potential for exposure and can exercise control over their exposure.

Limits for occupational/controlled exposure also apply in situations when an individual is transient through a location where occupational/controlled limits apply provided he or she is made aware of the potential for exposure.

NOTE 2 TO TABLE 1: General population/uncontrolled exposures apply in situations in which the general public may be exposed, or in which persons that are exposed as a consequence of their employment may not be fully aware of the potential for exposure or can not exercise control over their exposure.

Note: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio-frequency energy, and, if not installed and used in accordance with the installation manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case users will be required to correct the interference at their own expense.

ii

TABLE 2. Technical Information

Transmitting power

1m watts to 2 watts

 

1m watts to 5 watts (high power option)

Operating voltage

120 VAC nominal

Frequency band

2500 - 2686 MHz TX/RX

Frequency stability

±1.0 ppm

Number of channels

31

Channel bandwidth

6 MHz

Modulation

Orthogonal frequency division multiplex

Transmission

Time division duplex/time division multiplex

This Class A digital apparatus complies with Canadian ICES-003.

THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE. ALL STATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT WARRENTY OF ANY KIND. USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCT.

NOTWITHSTANDING ANY OTHER WARRANTY HEREIN, ALL DOCUMENT FILES AND SOFTWARE ARE PROVIDED “AS IS” WITH ALL FAULTS. NEXTNET WIRELESS DISCLAIMS ALL WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING, WITHOUT LIMITATION, THOSE OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT OR ARISING FOM A COUSRE OF DEALING, USAGE, OR TRADE PRACTICE.

IN NO EVENT SHALL NEXTNET WIRELESS OR ITS SUPPLIERS BE LIABLE FOR ANY INDIRECT, SPECIAL, CONSEQUENTIAL, OR INCIDENTAL DAMAGES, INCLUDING, WITHOUT LIMITATION, LOST PROFITS OR LOSS OF DAMAGE TO DATA ARISING OUT OF THE USE OR INABILITY TO USE THIS MANUAL, EVEN IF NEXTNET WIRELESS HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.

NextNet Wireless, Inc. recommends the antennas listed on the next page for base station installations:

iii

iv

Manufacturer:Stella Doradus

Frequency Range:2500-2700 MHz

NextNet

Model / Part

Polarization

Gain

Azimuth

 

Elevation

Special

Front to

 

Cross Pol.

Antenna

 

Length

 

Width /

Depth

Windage

Wireess

Number

 

 

(dBi)

Beam-

 

Beamwidth

Characteristics

Back Ratio

 

Disc. (dB)

Weight

 

(in)

 

Diame-

(in)

 

Part Number

 

 

 

 

 

 

width

 

(Degrees)

 

 

(dB)

 

 

 

(lbs)

 

 

 

 

ter (in)

 

 

 

 

 

 

 

 

 

(Degrees)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

26SD9005H

Horizontal

19

 

90

 

5

 

--

 

32

 

28

 

35.2

 

63.0

 

 

9.1

 

5.5

237 lbs @

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

125 mph

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

501-1009-2701

26SD9890NV

Vertical

16

 

90

 

7

 

null fill

35

 

35

 

8.6

 

35.8

 

 

5.5

 

4.7

86 lbs @

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

125 mph

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

501-1006-2701

26SD9860NV

Vertical

17.5

 

60

 

7

 

null fill

40

 

30

 

8.75

 

35.8

 

 

5.5

 

4.7

86 lbs @

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

125 mph

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

501-1002-2701

26SD98120NV

Vertical

15

 

120

 

7

 

null fill

21

 

30

 

8.5

 

35.8

 

 

5.5

 

5.3

86 lbs @

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

125 mph

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

501-3004-2601

26SD2360

Vertical

10

 

360

 

9

 

Omni

N/A

 

26

 

2.86

 

43.3

 

 

1.9

 

--

100 lbs @

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

125 mph

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Manufacturer:Stella Doradus

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Frequency Range:3300-3600 MHz

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NextNet

Model / Part

 

Polarization

 

Gain

 

Azimuth

Elevation

 

Special

 

Front to

Cross

Antenna

Length

 

Width /

 

Depth

Windage

Wireess

Number

 

 

 

(dBi)

 

Beam-

Beamwidth

 

Characteristics

 

Back Ratio

Pol.

Weight (lbs)

(in)

 

Diameter

 

(in)

 

Part Number

 

 

 

 

 

 

width

(Degrees)

 

 

 

(dB)

Disc.

 

 

 

 

 

(in)

 

 

 

 

 

 

 

 

 

 

(Degrees)

 

 

 

 

 

 

(dB)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

501-1009-3401

35SD9890NV

 

Vertical

 

16

 

90

7

 

null fill

 

35

35

5.4

 

28

 

 

5.5

 

4.7

67 lbs @

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

125 mph

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

501-1006-3401

35SD9860NV

 

Vertical

 

17.5

 

60

7

 

null fill

 

33

30

6.5

 

28

 

 

5.5

 

4.7

67 lbs @

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

125 mph

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

501-1002-3401

35SD98120NV

 

Vertical

 

15

 

120

7

 

null fill

 

25

30

5.4

 

28

 

 

5.4

 

5.3

67 lbs @

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

125 mph

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

501-3004-3601

35SD3360

 

Vertical

 

13

 

360

6

 

Omni

 

N/A

28

5.72

 

42.1

 

1.9

 

--

4.95 lbs @

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

135 mph

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTENTS

About this guide

Preface overview ..............................................................................

xiii

About this guide ..............................................................................

xiii

Chapters in this guide ........................................................................................

xiv

Additional documentation .................................................................

xv

Typographical conventions this guide uses ....................................

xvi

Where to go for more help ..............................................................

xvii

Technical support.............................................................................................

xvii

Documentation additions and corrections...................................................

xvii

Introduction to backhaul installations

Chapter overview ..............................................................................

1-1

System overview ................................................................................

1-1

System overview ................................................................................................

1-1

Infrastructure overview ....................................................................................

1-2

Installation overview .........................................................................

1-5

Installation steps common to RMB and I-BTS ............................................

1-5

Planning the installation ..................................................................

1-7

Choosing an installation location ....................................................................

1-7

Assessing network access provider equipment needs .................................

1-8

Planning for the antennas and antenna installation tips ..............................

1-9

Designing the deployment of base stations ................................................

1-10

Configuring network architecture

Chapter overview ............................................................................

2-11

Architecture overview .....................................................................

2-11

Configuring switches ......................................................................

2-12

Configuring the switch at the cell site ..........................................................

2-12

Configuring the head end switch ..................................................................

2-12

Configuring the ISP switch ............................................................................

2-12

Selecting links and circuits .............................................................

2-12

Selecting links based on maximum rate needed .........................................

2-12

Selecting links based on another rate ...........................................................

2-13

v

Configuring the AP server

Chapter overview ............................................................................

3-15

AP server overview ..........................................................................

3-15

Starting the AP server .....................................................................

3-15

Configuring the AP server ..............................................................

3-16

Defining AP server users and administrators .............................................

3-16

Defining zone names ......................................................................................

3-21

Defining ISPs ...................................................................................................

3-22

Changing ISP information .............................................................................

3-24

Monitoring ISPs and base stations ...............................................................

3-25

Configuring a standby AP server

Chapter overview ............................................................................

4-27

Standby AP server overview ............................................................

4-27

Configuring the base station with standby AP server information 4-27

Setting up common configuration file and directory .................................

4-28

Switching from the primary AP server to the secondary AP server .......

4-30

Configuring base stations

Chapter overview ............................................................................

5-31

Before you begin .............................................................................

5-31

Setting up connection methods used to configure base stations ..5-32

Setting up terminal emulation access ...........................................................

5-32

Setting up Telnet access .................................................................................

5-32

Setting up web access .....................................................................................

5-34

Setting up SNMP access ................................................................................

5-35

Setting base station configuration parameters ...............................

5-37

set airlink channel ...........................................................................................

5-37

set airlink downlink power .............................................................................

5-38

set airlink downlink bias ................................................................................

5-39

set system location ..........................................................................................

5-41

set system name ...............................................................................................

5-42

set airlink state .................................................................................................

5-42

Recommended parameter changes ................................................

5-42

set system cell ..................................................................................................

5-42

set system sector ..............................................................................................

5-42

set DHCP state ................................................................................................

5-42

Setting legacy and management VLAN IDs ...............................................

5-43

Setting up Syslog ............................................................................

5-43

Configuring the authority that grants network access to CPEs ....5-44

Using base station caching feature for re-registering CPEs .....................

5-44

Remote authority: setting up the provisioning server to grant CPEs

 

network access .................................................................................................

5-45

vi C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

Local authority: setting up the base station to grant CPEs

 

network access .................................................................................................

5-46

Configuring the time signal used by base stations ........................

5-46

Configuring the GPS to supply the time signal ..........................................

5-46

Configuring a base station to supply a time signal .....................................

5-47

Installing the integral base transceiver station (I-BTS)

Chapter overview ............................................................................

6-49

Before you begin .............................................................................

6-49

Cell wiring .......................................................................................

6-50

Installation overview .......................................................................

6-51

Antenna and bracket assembly for I-BTS ......................................

6-51

Base station connectors ..................................................................

6-55

Ethernet (data) and power connector ..........................................................

6-56

TVS module connectors ................................................................................

6-58

GPS connectors ...............................................................................................

6-59

Serial interface connector ...............................................................................

6-60

Antenna connector .........................................................................................

6-60

Mounting and grounding the base station .....................................

6-61

Mounting the base station to a wall ..............................................................

6-61

Mounting the base station to a tower ..........................................................

6-62

Mounting the base station to a 19 inch rack ...............................................

6-62

Grounding the base station ...........................................................................

6-62

Connecting the antenna to the base station ...................................

6-63

Antenna connection tips ................................................................................

6-63

Connecting the antenna to the base station ................................................

6-63

Connecting the GPS equipment to a base station .........................

6-63

GPS equipment mounting tips .....................................................................

6-63

Connecting the GPS unit to the base station .............................................

6-64

Connecting to the backbone network ............................................

6-64

Powering base stations ...................................................................

6-65

Powering tips ...................................................................................................

6-65

Powering the base station ..............................................................................

6-65

Installing the rackmount base station (RMB)

Chapter overview ............................................................................

7-67

Before you begin .............................................................................

7-67

Installation overview .......................................................................

7-68

Installing the mounting bracket and attaching cabinet to

 

the 19-inch rack ...............................................................................

7-69

Attaching the switch and power supply to the rack .......................

7-70

v i i

Installing the RMBs into the cabinet .............................................

7-70

Connecting RMBs to cell (cell wiring) ...........................................

7-71

Connecting power to the RMBs .....................................................

7-73

Powering the base station ..............................................................................

7-73

Powering tips ...................................................................................................

7-75

Grounding the RMBs .....................................................................

7-76

Turning on the RMB’s power ........................................................

7-77

Base station connectors ..................................................................

7-78

GPS connectors ...............................................................................................

7-78

Power supply cable connections ...................................................................

7-79

Diagnostic cable connections ........................................................................

7-79

Fuses and Ethernet cable connections on cabinet .....................................

7-80

Wiring alarms for RMBs .................................................................

7-82

Connecting to the backbone network ............................................

7-82

Testing and managing the network

Chapter overview ............................................................................

8-83

Testing the setup overview .............................................................

8-83

Installing the ISP’s provisioning server .......................................................

8-83

Testing the connection between the AP server and the

 

provisioning server ..........................................................................................

8-84

Ensuring CPE access to ISP VLAN ............................................................

8-84

Network management overview .....................................................

8-84

Fault isolation overview .................................................................................

8-85

Performance management overview ............................................................

8-86

Configuration management overview ..........................................................

8-86

Accounting feature overview ........................................................................

8-86

GPS status codes

Appendix overview ........................................................................

A-87

Supported frequency ranges

Appendix overview ........................................................................

B-89

MMDS frequency range ................................................................................

B-89

3.3 GHz frequency range ..............................................................................

B-91

3.5 GHz frequency range ..............................................................................

B-91

viii C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

FIGURES

About this guide

Introduction to backhaul installations

Rackmount base station (RMB) ......................................................................

1-2

Rackmount base stations inside cabinet ........................................................

1-3

Base station for indoor or outdoor installation ............................................

1-4

Configuring network architecture

 

Configuring the AP server

 

AP server log in page ......................................................................................

3-16

Access Provider Management page ..............................................................

3-17

Configure page ................................................................................................

3-18

Administrators page ........................................................................................

3-19

New User page ................................................................................................

3-20

Base Station Attributes page ..........................................................................

3-21

ISP Management page ....................................................................................

3-22

Create new ISP page .......................................................................................

3-23

ISP details page ................................................................................................

3-24

Monitor ISPsBase Stations page ................................................................

3-25

Base Station Properties page .........................................................................

3-26

Configuring a standby AP server

 

Configuration files to share between primary and secondary

 

AP servers ........................................................................................................

4-28

Configuring base stations

Installing the integral base transceiver station (I-BTS)

Cell wiring diagram .........................................................................................

6-50

Attaching L-shaped brackets to I-BTS ........................................................

6-51

Attaching antenna bracket to the L-shape bracket ....................................

6-52

Attaching tilt guide bracket to the bracket on the antenna ......................

6-52

Attaching antenna cable to I-BTS ................................................................

6-54

Base station connectors ..................................................................................

6-55

Ethernet (data) and power connector ..........................................................

6-56

Ethernet (data) and power connector ..........................................................

6-56

TVS module connector: Base station connector ........................................

6-58

TVS module connector: power/Ethernet connector ................................

6-58

ix

GPS connector ................................................................................................

6-59

Serial interface connector ...............................................................................

6-60

Base station mounting template ....................................................................

6-61

Installing the rackmount base station (RMB)

Cabinet mounting bracket .............................................................................

7-69

Location of switch and power supply in rack .............................................

7-70

Cell wiring diagram .........................................................................................

7-72

Power connections on bottom of cabinet ...................................................

7-74

Grounding the RMBs .....................................................................................

7-76

RMB LEDs ......................................................................................................

7-77

Connector on the serial cable used in configuring base stations .............

7-78

Diagnostic cable: DB9 connector pins ........................................................

7-80

Fuses and Ethernet cable connections on cabinet .....................................

7-80

Removing fuse from cabinet .........................................................................

7-81

External alarm connections ...........................................................................

7-82

Testing and managing the network

GPS status codes

Supported frequency ranges

x C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

TABLES

About this guide

Chapters and appendices in the guide

.............................................. preface-xiv

Additional documentation ..................................................................

preface-xv

Typographical conventions ...............................................................

preface-xvi

Contacting technical support ...........................................................

preface-xvii

Introduction to backhaul installations

Advantages/disadvantages of location choices ............................................

1-8

Configuring network architecture

 

Configuring the AP server

 

Create new ISP page .......................................................................................

3-23

Configuring a standby AP server

 

Configuring base stations

 

Transmit power levels .....................................................................................

5-38

Transmit power levels .....................................................................................

5-39

Downlink rate based on modulation method .............................................

5-40

Uplink data rate for 4-QAM modulation method .....................................

5-40

Uplink data rate for 16-QAM modulation method ...................................

5-40

Uplink data rate for 64-QAM modulation method ...................................

5-40

Uplink data rate for 16-QAM lite modulation method .............................

5-41

Methods used to grant CPEs access to ISPs’ VLANs ..............................

5-44

Installing the integral base transceiver station (I-BTS)

Ethernet/power base station cable choices ................................................

6-57

Ethernet/power cable pins ............................................................................

6-57

Function of wires in cable 597-6027-0xxx ..................................................

6-57

Recommended mating connectors (optional) .............................................

6-59

Installing the rackmount base station (RMB)

Connector type to use with cabinet connectors .........................................

7-74

Description of LEDs on the base station ...................................................

7-77

Power cable pins ..............................................................................................

7-79

Diagnostic cable pin connections (RJ-45) ...................................................

7-79

Testing and managing the network

xi

GPS status codes

GPS status codes and meaning ....................................................................

A-87

Supported frequency ranges

 

xii C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

P R E F A C E

ABOUT THIS GUIDE

Preface overview

Thank you for choosing the Expedience™ system from NextNet Wireless. This guide describes how to configure and install the system’s base transceiver station (BTS) and the rack-mounted base stations system (RMB).

This preface describes:

Audience for this guide

Additional documentation

Typographical conventions used in this guide

Where to go for more help

About this guide

This guide describes how to configure and install the system’s base station. It also describes how to configure and work with the access provider (AP) server.

This guide is intended for network and system administrators who must install, configure, and manage base stations and the AP server. This guide provides detailed configuration and installation instructions.

It is assumed readers of this guide are familiar with:

Basic networking concepts

Layer 2 (link layer) of OSI model

Cell structure engineering

xiii

Chapters in this guide

Table i describes the chapters and appendices in this guide.

Table i

Chapters and appendices in the guide

 

 

 

Chapter

 

Description

 

 

 

Preface

 

Provides an overview of the guide, related documentation,

 

 

the guide’s intended audience, typographical conventions,

 

 

and methods for obtaining technical support.

Chapter 1 Introduction to

Provides an overview of the Expedience system and of the

backhaul installations

system’s base station component. It provides an installation

 

 

overview and describes things you need to consider before

 

 

installing base stations.

Chapter 2 Configuring

Describes a simple network topology and provides an

network architecture

overview of how to configure switches at the cell site, the

 

 

head end, and the ISP sites.

Chapter 3 Configuring the

Describes how to configure and use the access provider (AP)

AP server

 

server.

Chapter 4 Configuring a

Explains how to configure a standby AP server. The

standby AP server

network will use the standby server if the primary server

 

 

becomes unavailable.

Chapter 5 Configuring base

Describes how to configure base stations, including how to

stations

 

use Telnet or Term to set up a base station before deploying

 

 

it and mounting it to a tower or building. The chapter also

 

 

describes how to configure base stations after you have

 

 

deployed them, for example, to maintain the system and

 

 

optimize system performance.

Chapter 6 Installing the

Explains how to install a base station at a cell site. Also

integral base transceiver

describes the components used to mount the base station on

stations (I-BTS)

a building or tower.

Chapter 7 Installing the

Describes how to install the rackmount base station (RMB),

rackmount base station

including installing the cabinet onto a 19 inch rack, installing

(RMB)

 

the power supply and switch, installing the RMB into the

 

 

base station cabinet and connecting the RMBs to the cell and

 

 

to cell-site components.

Chapter 8 Testing and

Explains how to work with the ISP to ensure the network is

managing the network

installed and running correctly.

Appendix A GPS status

Describes the codes that the GPS can generate.

codes

 

 

Appendix B Supported

Provides reference information about the frequency ranges

frequency ranges

in which the equipment can operate.

xiv C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

Additional documentation

If you cannot find the information you need in this guide, you may want to refer to the documents described in Table ii.

Table ii

Additional documentation

 

 

 

Guide

 

Description

 

 

Getting Started with the

Provides an overview of the Expedience system, its

Expedience System

components, its network architecture, and options for

 

 

selecting a deployment scheme for the system in the service

 

 

provider (backbone) network.

Configuring, Installing, and

This is the guide you are currently reading. Describes how to

Using Carrier Infrastructure

set up and configure base stations, including how to connect

 

 

antenna systems, the backbone network equipment, and

 

 

global positioning system (GPS) equipment.

 

 

Also provides an overview of the AP server and how to

 

 

configure the AP server for your network.

Using the NextNet

Describes the NextNet operating system (NNOS), which is

Operating System (NNOS)

the common operating system for the system’s base station

 

 

devices and customer premise equipment (CPE) devices.

 

 

This guide describes how you can configure the operating

 

 

system on devices by using commands issued from Telnet,

 

 

Terminal, or a Web interface.

Configuring and monitoring

Intended for use by an ISP. Provides an overview of the

the ISP network

Expedience system, its components, and its network

 

 

architecture. This guide describes how to install and

 

 

configure the ISP’s provisioning server. It describes how to

 

 

define service level agreements (SLAs).

Expedience Broadband

Intended for use by your subscribers, this guide describes

Wireless Access Modem

how to install a RSU (that is, an indoor CPE) at a subscriber

 

 

site. Your subscribers can completely install the RSU.

 

 

The guide explains, in detail, how to connect the RSU to a

 

 

computer or to a network device. It explains system pre-

 

 

requisites, and provides troubleshooting information.

 

 

This guide is available in electronic (pdf) format, on the

 

 

CD-ROM that accompanies the LinkMonitor software.

Installing the RSU

Intended for use by your subscribers, this guide describes

 

 

how to quickly install a RSU directly to a computer.

Expedience NLOS

Intended for use by a professional installer, this guide

Outdoor Broadband

describes how to install an outdoor CPE.

Wireless Access Modem

 

xv

Typographical conventions this guide uses

Table iii describes the typographical conventions that this guide uses.

Table iii Typographical conventions

Convention

Meaning

 

 

Bold face

If you are using a graphical user interface (GUI), bold face

 

indicates a button, menu option, icon, and so on, that you

 

manipulate directly.

 

If you are using a command line interface, bold face indicates

 

commands and keywords.

 

Bold face can also indicate information that you must enter.

 

 

Italic face

Arguments for which you supply values are in italic face.

Courier

A command you type in, exactly as it appears, at a command

(mono-spaced) font

line.

[ ... ]

Arguments that appear inside square brackets [ ], are

 

optional.

 

Also, when the guide shows a system prompt, the default

 

system prompt appears inside square brackets.

{..} | {..}

Required keywords are grouped in braces and separated by

 

vertical bars.

Note

Notes contain helpful suggestions for the reader.

 

 

<...>

Non-printing characters, such as passwords, appear in angle

 

brackets.

Caution

Cautions contain information about which the reader must

 

exercise care.

Warning

Warnings contain information about how readers might do

 

something resulting in harm to themselves or in damage to

 

equipment or data.

xvi C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

Where to go for more help

This section describes how to obtain support for your NextNet Wireless product. It also describes how to provide comments on the product documentation.

Technical support

NextNet Wireless is committed to providing our customers with high quality technical support. Table iv describes how to contact technical support.

Table iv Contacting technical support

Contact

Description

 

 

Phone

1.877.962.2200

E-mail

support@nextnetwireless.com

 

 

Web site

www.nextnetwireless.com

Documentation additions and corrections

If you find documentation errors, or want to see additional information not presented in this guide, please contact our documentation group at the following e-mail address:

techdocs@nextnetwireless.com

xvii

xviii C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

C H A P1T E R

INTRODUCTION TO BACKHAUL

INSTALLATIONS

Chapter overview

This chapter provides an overview of the Expedience system and of the system’s infrastructure components:

The base station, which comes in two forms:

The integral base transceiver station (I-BTS)

The rackmount base station (RMB)

The access provider (AP) server

The network switches

The chapter provides an installation overview. It also describes things you need to consider before installing base stations.

System overview

This section provides a brief overview of the Expedience system, as well as the infrastructure that network access providers must install. For additional system overview information, refer to the guide “Getting Started with the Expedience System.”

System overview

NextNet Wireless designed the Expedience system to give small office, home office (SOHO), and residential subscribers high speed, wireless access to network communication systems, such as the Internet. The Expedience system is an end-to-end broadband wireless access system and operates in several frequency ranges.

The system was designed to allow network access providers to re-sell network bandwidth to ISPs on a wholesale basis. In turn, the ISPs sell access to their subscribers on a retail basis. To support multiple ISPs on the network, the system uses virtual LAN (VLAN) technology.

The system does not have a line-of-sight (LOS) requirement between the base station and the CPEs. The air link between base stations and CPEs functions as an Ethernet bridge carrying IP/ARP packets. Time division duplex (TDD) and cellular deployment offer you flexibility in adjusting downlink versus uplink airtime.

1-1

Infrastructure overview

The base station and AP server are network infrastructure components supplied by NextNet Wireless. The network access provider configures and maintains this equipment.

Additional infrastructure components include switches for use at the base station cell sites, and the head-end switch. These switches are supplied by the network access provider. If desired, the network access provider can purchase the switches through NextNet Wireless.

Base station overview

The base station maintains contact with CPEs at your subscribers’ sites. The base station integrates the transceiver and modem into one device.

Under typical configurations, the base station covers an approximate radius of 2 to 3 miles, with a 5 mile maximum. If desired, network access providers can configure their base stations to cover a maximum radius of 20 miles. To cover up to 20 miles, the network access provider enables the extended range feature.

There are two types of base stations offered by NextNet Wireless:

An indoor-only base station that slides into a base station cabinet after the cabinet has been installed on a standard 19 inch rack. This base station is known as the rackmount base station (RMB).

A base station that can be installed indoors or outdoors. This base station can be installed on a tower, on a roof, on a wall, or on a rack. The antenna can be installed on the base station itself, or the antenna can be installed separately. This base station is known as the integral base transceiver station (I-BTS).

Figure 1.1 shows an individual RMB which will be installed inside a cabinet. This cabinet is then installed on a standard 19 inch rack. Up to 8 RMBs can be installed inside a cabinet.

Figure 1.1 Rackmount base station (RMB)

1-2 C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

Nokia BTS2500C Manual

Figure 1.2 shows 8 RMBs installed inside the base station cabinet.

Figure 1.2 Rackmount base stations inside cabinet

1-3

Figure 1.3 shows a base station that can be installed outdoors or indoors The figure shows the antenna installed on the base station. If desired, you can install the antenna separately from the base station.

Figure 1.3 Base station for indoor or outdoor installation

AP server overview

The AP server acts as a relay for the CPE registration events which arrive from base stations (on the management VLAN) and are forwarded to the correct ISP provisioning server (over the control VLAN).

The base stations each have a TCP/IP connection to the AP server. The base stations use their connection to forward CPE registration requests to the AP server.

The AP server is provided by NextNet Wireless.

1-4 C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

Head-end switch, base station cell switch, and ISP switch overview

The network access provider must supply switches for their network, which include the headend switch and the switches used at the base station cell site. The network access provider must also assist their ISPs when the ISPs program their switches with the proper ISP VLAN IDs.

The base stations are grouped together into cells, with between 1 and 6 base stations at a cell site. (If the network access provider chooses to stack base stations, more than 6 base stations can exist in a cell.) To form the base station LAN, the base stations are connected to a switch at the cell site.

WAN links are then used to connect the cell sites to the head end switch. The head end switch splits incoming traffic to the management VLAN and to the appropriate ISP VLAN. The ISP then has a configured switch that controls traffic coming into and out of the ISP VLANs.

Installation overview

This section provides a high-level overview of how to install the indoor, rackmount base station (RMB), as well as the integral base transciever stations (I-BTS) that can be installed outdoors or indoors.

Installation steps common to RMB and I-BTS

1Plan the installation of base stations:

a Choose an appropriate location for the base station installation. For more information, refer to the section “Choosing an installation location” on page 1-7 in this chapter.

b Design the deployment of base stations. Determine how base stations will be deployed by marking a location on a map that shows where each base station will be installed. Also determine naming conventions for cells, sectors, zones, and base stations names. For more information, refer to the section, “Designing the deployment of base stations” on page 1-10.

2Plan for system components that you need to supply to complete the network. For more information, refer to the section “Assessing network access provider equipment needs” on page 1-8 in this chapter.

3Install and configure the access provider (AP) server. For more information, refer to Chapter 3, “Installing the AP server,” in this guide.

4On the AP server, configure zone names, VLAN IDs, and the ISP IDs. For more information, refer to Chapter 3, “Installing the AP server,” in this guide.

5Using the NextNet Operating System (NNOS), configure the base stations before deploying them in the field. For more information, refer to the chapter “Configuring base stations” in this guide.

RMB installation overview

This section provides a high-level overview of how to install the base station cabinet onto a 19 inch rack, and then how to install the base stations into the cabinet.

1Slide the metal base station cabinet into the 19 inch rack.

2Install the power supply onto the 19 inch rack.

1-5

3Install the switch onto the 19 inch rack.

4Slide each base station into the appropriate slot in the cabinet on the rack.

5If you are using a 5 watt base station, install the 5 watt channel specific filter.

6Plug in the cables which include:

GPS cable

Antenna cable

Ethernet cables

Power cables

Alarm cables

Also, make sure that the fuses are installed properly.

7Plug in the power cable to the RMBs in the cabinet, make sure the power supply is working, then turn on each RMB.

I-BTS installation overview

This section provides a high-level overview of the base station installation process. Other sections in this guide then explain these installation tasks in detail.

The tasks you perform to deploy base stations are:

1Mount the base station at the site you selected. For more information, refer to the section “Mounting and grounding the base station” on page 6-57 in this guide.

2Connect the antenna to the base station, as described in the section “Connecting the antenna to the base station” on page 6-59.

3Mount the GPS device and connect it to the base station. One GPS device can service the multiple base stations at a cell site. For more information, refer to the section “Connecting the GPS equipment to a base station” on page 6-59 in this guide.

4Connect the base station to the transcient voltage suppressor (TVS) module, then connect the TVS module to your network switch.

The TVS module splits the connection: one connection goes to a switch that connects to your network, and the other goes to a power supply. For more information, refer to the section “Connecting to the backbone network” on page 6-60 in this guide.

5Power the base stations by connecting the TVS module to the power supply. For more information, refer to the section “Powering base stations” on page 6-61 in this guide.

6Configure cell site switches, the head end switch, and the ISP switches. For more information, refer to “Configuring switches” on page 2-12 in this guide.

7Test the network by working with an ISP to:

Install the ISP’s provisioning server

Test the AP server to provisioning server connection.

Test that CPEs can access the ISP’s VLAN(s).

1-6 C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

Planning the installation

This section describes issues you need to consider before you install the base stations, including:

Choosing locations for the base station installation

Planning for service provider equipment components

Selection antennas

Defining naming conventions for cells, sectors, and base stations and for VLANs

Choosing an installation location

The base station’s location at a site depends on many factors, including the site’s physical environment, the coverage pattern you want to achieve, and the ease of maintenance you require.

RMB installation location

The RMB is always installed indoors, inside the base station cabinet and on a standard 19 inch rack. In turn, the rack is installed in an indoor equipment room or in another type of indoor housing unit such as a shed near the tower.

1-7

BTS installation location

Table 1.1 describes some of the locations you might want to consider for a BTS.

Table 1.1 Advantages/disadvantages of location choices

Location

Advantages

Disadvantages

On tower, at

Installing at the antennas offers

antennas

cost savings, due to the fact that

 

you can use a shorter coaxial cable

 

to connect the base stations to your

 

cells. This also offers the ability to

 

transmit at higher power levels,

 

since there is lower signal loss in

 

shorter cables.

When you install base stations near the top of the tower, installation and maintenance are more difficult.

At base of

Placing the base stations at the base

tower

of a tower offers simpler

 

installation and maintenance than a

 

base station installed on the tower,

 

at the antennas.

 

Base station installation and

 

maintenance are simpler than other

 

options;

If you install at the base of the tower, you need to run a coaxial cable from the base stations to the antennas. This cable must be of sufficient size to reduce signal loss, which may increase costs.

Installation still requires you to install the antennas and coaxial cable.

On rooftop

You can use a shorter coaxial cable

 

to connect base stations to

 

antennas. As such, you can

 

probably operate at higher power

 

levels, and still stay within signal

 

loss criteria.

 

Rooftop access is usually available,

 

making installation and

 

maintenance easier. Also, a housing

 

unit for the backbone network

 

switch, power supplies, and other

 

equipment is typically available.

You need to obtain permission to use a rooftop, and comply with building codes.

Note: Regardless of the location you choose, plan to provide a weatherproof housing unit for the network switch, the power supply, and the TVS equipment.

Placement of base stations and switches on network

Make sure your network design places the base stations behind a switch so that the base station only sees Ethernet traffic addressed to it. The switch you choose needs to be able to handle the Ethernet traffic on your network

Assessing network access provider equipment needs

Before you install and deploy the base station, ensure you have made provisions for the following components:

Power and data connection between the base station and your network

Global position system (GPS) for proper TDD functions. You must use the GPS supplied with the Expedience system.

Antenna system for transmitting and receiving signals for the base stations.

1-8 C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

SNMP server

DHCP server, if desired, to supply IP addresses to base stations

AP server

Weatherproof housing for the backbone network switch, power supplies, and UPS. Also supply weatherproof housing for the TVS module, which provides lightning protection.

Coaxial cable to connect the base station to the antenna.

Tower or building structure on which to mount cell site equipment.

Equipment needs of ISP

As a network access provider, you provide network bandwidth to ISPs. The ISPs in turn sell network access to subscribers. Make sure your ISPs plan for the following pieces of equipment on the ISP VLAN:

DHCP server

Customer care server and a customer relationship management application

Provisioning server

Switch to receive and direct traffic from the network access provider

Router to route traffic to the Internet

Planning for the antennas and antenna installation tips

The type of antenna you choose depends on the cell type and pattern you want to use. Make sure:

The antenna is a high-gain antenna, preferably at least 15dBi or higher.

The installation of the antenna complies with the vendor’s installation directions, and that it meets building codes.

After you have installed an antenna, you need to connect it to a mounted base station. For instructions on connecting the antenna to a base station, refer to the section “Connecting the antenna to the base station” on page 6-59.

1-9

Designing the deployment of base stations

To plan for how base stations will be deployed:

1Determine a naming convention for base stations.

2Using a map of the area to be covered, define the zone names that will be used.

For example, an access provider can divide a metropolitan areas into North, South, East, West, and Central zones. The network access provider then assigns base stations to a specific zone by using the set system location command. Keep in mind that multiple base stations may be assigned to the same zone. Zones allow the ISPs to differentiate services to subscribers by allowing subscribers to operate in specific regions or clusters of zones.

3On a map, mark each location where base stations are installed.

4For each base station, document your design choices. Please note that some parameters are optional, depending on how you design the system.

Base station name (required)

Zone name (required)

Cell name (optional)

Sector name (optional)

Channel (required)

Default VLAN for legacy CPEs (optional, default is 1)

Management VLAN ID (optional; default ID is 1)

1-10 C o n f i g u r i n g , I n s t a l l i n g , a n d U s i n g C a r r i e r I n f r a s t r u c t u r e

C H A 2P T E R

CONFIGURING NETWORK ARCHITECTURE

Chapter overview

This chapter describes a simple network topology. It provides an overview of how to configure switches at the cell site, the head end, and the ISP sites.

Architecture overview

The hierarchy of the network architecture uses the concept of two layers: the access layer and the backbone layer.

The functions of the access layer include connecting users — which include subscribers and the ISPs — to the backbone layer.

Subscribers use components on the access layer (the CPEs and the base stations) to obtain broadband network services. The subscriber’s CPE communicates with a base station over a radio link which is commonly called the air link. The base stations that communicate with the CPEs are grouped into cells. The base stations in each cell are connected to a switch at the cell site and a base station LAN is formed. The switches at the cell sites then use WAN links to connect to the head-end switch.

The ISPs also use the access layer to connect to the backbone layer. An ISP receives network access requests from components on the backbone layer (specifically the AP server on the management VLAN). These requests for access are sent to the appropriate ISP. The ISP then grants or denies the request. If access is granted, the ISP provides the subscriber’s host computer with an IP address and traffic is shaped for that host computer according to the subscriber’s service level agreement (SLA). Traffic to and from the host computer travels through the backbone layer

The functions of the backbone layer include quickly switching incoming WAN trunk traffic to the management VLAN and to the ISP VLANs. The backbone layer also returns Internet traffic from the ISP to the appropriate base station and subscriber’s CPE.

2-11

Loading...
+ 87 hidden pages