Installation
ReadyNAS OS6 Rack-Mount Storage
Contents
Package Contents ....................................................................................................... 3
Front Bezel .................................................................................................................... 4
Basic Setup .................................................................................................................... 5
Reformat Disks ............................................................................................................. 8
Additional Information .............................................................................................10
2
Package Contents
ReadyNAS system
(your model might vary)
Front bezel (included with
some models)
Power cord (varies by model)
Ethernet cable
Important: Read all safety warnings in the hardware manual for your
system before connecting the system to the power supply.
3
Front Bezel
Some ReadyNAS models include a front bezel.
¾ To install the front bezel:
1. Hold the bezel in front of the ReadyNAS chassis.
2. Insert the tabs on the right side of the bezel into the holes on the
right bezel brace.
3. Push the bezel to the right and insert the tabs on the le side of the
bezel into the holes on the le bezel brace.
The bezel snaps into place.
4. (Optional) Lock the bezel.
4