National Instruments CFP-2200, CFP-2210, CFP-2220 User Manual

FIELDPOINT OPERATING INSTRUCTIONS AND SPECIFICATIONS
cFP-2200/2210/2220
Intelligent Real-Time Controllers for Compact FieldPoint
4
5
6
3
7
8
13
2
1
Front
1 RS-232 Serial Port 2 RJ-45 Ethernet Port 1 3 Removable Compact Flash (cFP-2220 Only) 4 Status LED 5 Power LED 6 User-Configurable LEDs 7 DIP Switches 8 USB Port (cFP-2220 Only)
9
12
10
11
BottomBottom
9 RJ-45 Ethernet Port 2 (cFP-2220 Only) 10 Reset Button 11 Power Connector 12 Digital Input/Output Terminals (cFP-2220 Only) 13 RS-485 Serial Port (cFP-2220 Only) 14 RS-232 Serial Port (cFP-2220 Only) 15 RS-232 Serial Port (cFP-2210 and cFP-2220 Only)

Figure 1. cFP-22xx, Front and Bottom Views

14
15
This document describes how to mount the cFP-2200/2210/2220 controllers, how to connect the controllers to networks, and how to use the features of the controllers. This document also contains specifications for the controllers. In this document, the cFP-2200/2210/2220 controllers are referred to inclusively as the cFP-22xx.

What You Need to Install the cFP-22xx

cFP-22xx intelligent real-time controller
cFP-BP-4 or cFP-BP-8 Compact FieldPoint backplane
Compact FieldPoint I/O modules
Compact FieldPoint connector blocks and/or cables
Ethernet cable
Mounting hardware (DIN rail, panel-mount, or rack-mount accessory)
Two M4 or number 10 panhead screws (for panel mounting only)
Number 2 Phillips screwdriver
14 AWG (1.6 mm) wire with ring lug to fit #8 screw
11–30 VDC Power supply
PC running Windows
FieldPoint software 6.0.1 or later
LabVIEW Real-Time Module 8.5.1 or later

Mounting the Compact FieldPoint Backplane

You can mount the cFP-BP-x backplane on a 35 mm DIN rail, on a panel, or in a standard 19 in. rack. NI recommends DIN rail mounting for the cFP-BP-4 only. Use panel mounting or rack mounting for the cFP-BP-8. Use the panel mounting method for high shock and vibration applications. Before using any mounting method, record the serial number from the back of the backplane. You will be unable to read the serial number after you have mounted the backplane.
Each set of mounting instructions in this document includes an instruction to connect the protective earth (PE) ground terminal on the cFP-BP-x backplane to the system safety ground. The backplane PE ground terminal
cFP-2200/2210/2220 2 ni.com
has the following symbol stamped beside it: . Connect the backplane PE ground terminal to safety ground using 14 AWG (1.6 mm) wire with a ring lug. Use the 5/16 in. panhead screw shipped with the backplane to secure the ring lug to the backplane PE ground terminal.
To ensure maximum cooling efficiency, mount the Compact FieldPoint so that the I/O module vents are at the top and bottom, as shown in the following figure:

Figure 2. cFP-22xx Installed on cFP-BP-4 Mounted Upright

Caution
Your installation must meet the following requirements for space and cabling
clearance:
Allow at least 51 mm (2 in.) all around the backplane for air circulation.
Allow 38 mm (1.5 in.) below and 51 mm (2 in.) above the controller.
© National Instruments Corporation 3 cFP-2200/2210/2220
Cabling
Clearance
Min. 182 mm (7.18 in.)
106 mm (4.18 in.)
4 slots = 246 mm (9.68 in.) 8 slots = 441 mm (17.4 in.)
Cooling Outline 51 mm (2 in.) Cooling Outline 51 mm (2 in.)

Figure 3. cFP-22xx Installed on cFP-BP-x, Bottom View with Dimensions

4 slots = 246 mm (9.68 in.)
8 slots = 441 mm (17.4 in.)
127 mm
(5.00 in.)
(6.50 in.)
Min. 165 mm
Cabling Clearance Cooling Outline 51 mm (2 in.) All Around

Figure 4. cFP-22xx Installed on cFP-BP-4, Front View with Dimensions

cFP-2200/2210/2220 4 ni.com
127.00 mm (5.0 in.)
104.78 mm (4.1 in.)
63.50 mm (2.5 in.)
22.23 mm (0.9 in.)
Caution
(1.3 in.)
33.15 mm
(5.1 in.)
129.54 mm
440.94 mm (17.4 in.)
(12.3 in.)
311.40 mm
(15.3 in.)
387.60 mm

Figure 5. cFP-BP-8, Back View with Dimensions

104.74 mm (4.1 in.)
127.00 mm (5.0 in.)
63.46 mm (2.5 in.)
22.19 mm (0.9 in.)
(1.3 in.)
34.04 mm
(3.3 in.)
84.84 mm
245.87 mm (9.6 in.)
(6.3 in.)
161.04 mm
(8.3 in.)
211.84 mm

Figure 6. cFP-BP-4, Back View with Dimensions

Make sure that no I/O modules are in the backplane before mounting it.
(16.1 in.)
407.80 mm
© National Instruments Corporation 5 cFP-2200/2210/2220

Mounting the Backplane on a DIN Rail

The DIN rail mounting kit is NI part number 778614-01. You need one kit to mount the cFP-BP-4 on a standard 35 mm DIN rail. Complete the following steps to mount the backplane on a DIN rail.
1. Fasten the DIN rail clip to the cFP-BP-4 using a number 2 Phillips screwdriver and the 8-32 × 5/16 in. countersink screws shipped with the mounting kit.
L
S
A
T
N
N
E
IO
T
M
A
U
R
N
T
S
IN

Figure 7. Installing the DIN Rail Clip on the cFP-BP-4

Caution
Do not use screws longer than 5/16 in. to fasten the DIN rail clip to the backplane.
2. Insert one edge of the DIN rail into the deeper opening of the DIN rail clip, as shown in Figure 8.
1
2
3
1 DIN Rail Clip 2 DIN Rail Spring 3 DIN Rail

Figure 8. One Edge of DIN Rail Inserted in Clip

cFP-2200/2210/2220 6 ni.com
3. Press down firmly on the backplane to compress the spring until the clip locks in place on the DIN rail.
4. Connect the PE ground terminal on the backplane to safety ground.
Caution Disconnect power and make sure that no I/O modules are in the backplane before
removing it from the DIN rail.

Mounting the Backplane on a Panel

The horizontal panel-mount kit has mounting holes on the sides of the backplane and is NI part number 778616-01. The vertical panel-mount kit has mounting holes on the top and bottom of the backplane and is NI part number 778688-01. Complete the following steps to mount the system on a flat surface.
1. Fasten the panel-mount plates to the back of the cFP-BP-x using a number 2 Phillips screwdriver and the 8-32 × 5/16 in. countersink screws shipped with the kit. You must use these screws because they are the correct depth and thread for the plates and backplane.
AL
NATION INSTRUMENTS

Figure 9. Installing the Horizontal Panel-Mount Kit on the cFP-BP-4

© National Instruments Corporation 7 cFP-2200/2210/2220
102 mm
(4 in.)
260 mm (10.25 in.)
Figure 10. cFP-BP-4 with Horizontal Panel Mount Kit Installed,
Front View with Dimensions
102 mm
(4 in.)
457 mm (18 in.)
Figure 11. cFP-BP-8 with Horizontal Panel-Mount Kit Installed,
Front View with Dimensions
L
S
A
T
N
N
E
IO
T
M
A
RU
N
ST
IN

Figure 12. Installing the Vertical Panel-Mount Kit on the cFP-BP-4

cFP-2200/2210/2220 8 ni.com
34.0 mm (1.34 in.)
7.6 mm (0.30 in.)
152 mm (6 in.)
178 mm (7 in.)
178 mm (7.0 in.)
7.6 mm
(0.30 in.)
17.8 mm (0.70 in.)
33.1 mm (1.31 in.)
152 mm (6 in.)
178 mm (7 in.)
17.8 mm (0.70 in.)
246 mm (9.7 in.)
Figure 13. cFP-BP-4 with Vertical Panel-Mount Kit Installed,
Front View with Dimensions
374 mm (14.7 in.)
457 mm (18 in.)
Figure 14. cFP-BP-8 with Vertical Panel-Mount Kit Installed,
Front View with Dimensions
2. Bolt or screw the plates to a panel.
3. Connect the PE ground terminal on the cFP-BP-x to safety ground.
Caution Disconnect power and make sure that no I/O modules are in the backplane before
removing it from the panel.
© National Instruments Corporation 9 cFP-2200/2210/2220

Mounting the Backplane in a Standard 19 in. Rack

The rack-mount kit for Compact FieldPoint is NI part number 778615-01. The following figure shows the dimensions of the rack-mount kit.
374.65 mm (14.750 in.)
278.89 mm
177.8 mm (7.000 in.)
152.15 mm (5.990 in.)
(10.980 in.)
63.07 mm
(2.483 in.)
Diameter
50.8 mm
(2.00 in.)
76.2 mm
(3.000 in.)
444.5 mm
(17.500 in.)
152.4 mm (6.000 in.)
38.1 mm
(1.500 in.)
8× Diameter
7.92 mm
0.312 in.
()
25.02 mm (0.985 in.)
82.52 mm (3.249 in.)
33.15 mm (1.305 in.)
Diameter
6.35 mm
0.250 in.
()
2.29 mm
(0.090 in.)
66.29 mm (2.610 in.)
34.93 mm (1.375 in.)
2×
6.91 mm
(0.272 in.)
37.69 mm (1.484 in.)
37.72 mm
(1.485 in.)
2×
21.34 mm (0.840 in.)
2×
2× Radius
25.4 mm
(1.000 in.)
25.4 mm
(1.000 in.)
+0.07 mm 0 mm
+0.003 in. –0.000 in.
132.56 mm (5.219 in.)
+0.07 mm –0.02 mm
+0.003 in. –0.001 in.
Full Radius
4×
7.06 mm
(0.278 in.)
10.59 mm (0.417 in.)
4× Radius
179.32 mm
2.29 mm
(0.090 in.)
(7.060 in.)

Figure 15. Dimensions of Rack-Mount Kit

Complete the following steps to mount the system in a rack.
1. Fasten the rack-mount bracket to the back of the cFP-BP-x using the captive screws on the bracket.
cFP-2200/2210/2220 10 ni.com
AL
TS ION UMEN
NAT INSTR

Figure 16. Installing the Rack-Mount Bracket on the cFP-BP-4

L
NA
NATIO INSTRUMENTS

Figure 17. Installing the Rack-Mount Bracket on the cFP-BP-8

© National Instruments Corporation 11 cFP-2200/2210/2220
2. Bolt the rack-mount bracket to a standard 19 in. rack.
3. Connect the PE ground terminal on the cFP-BP-x to safety ground.
Caution Disconnect power and make sure that no I/O modules are in the backplane before
removing it from the rack.
You can install an 8 in. DIN rail in the rack-mount kit to mount a power supply such as the PS-5. The captive #10-32 nuts on the rack-mount kit make it easy to attach a DIN rail. Use two #10-32 screws of 3/8 in. length as shown in Figure 18. If you want to install flat washers under the screw heads, use a slightly longer screw, up to 1/2 in. length. If you need more DIN rail space, you can install an 18 in. rail in a second rack-mount kit using four #10-32 screws.
1
2
3
4
1 cFP-BP-4 Backplane 2 Captive #10-32 Nuts

Figure 18. Installing an 8 in. DIN Rail in the Rack-Mount Kit

cFP-2200/2210/2220 12 ni.com
3 8 in. DIN Rail 4 #10-32 Screws, 3/8–1/2 in.
Loading...