
GOT2000 Series Supplementary
For GT2712-STWD (8 fittings)
a
a
a
b
a
b
a: Use the Installation fitting (4 fittings)
b: Use GT25-12FIT-EXS (separately sold product). (4 fittings)
In the middle (b
*1
) of the top, attach a large metal fittings
b
*1
b
Description
(Compliance with the ATEX Directive)
GT2712-STWD GT2710-VTWD GT2510-VTWD
GT2508-VTWD
Thank you for purchasing the GOT2000 Series.
Prior to use, please read both this manual and the
detailed manual thoroughly to fully understand the
product.
MODEL GOT2000-U-ATEX-EK
Model
code
IB(NA)-0800551ENG-B(1609)MEE
(Always read these precautions before using this equipment.)
The GOT that complies with the ATEX Directive 94/9/EC of the EU
Directives is in compliance with IECEx Scheme IEC 60079/0/15/31
standards has the Ex marking on its rating plate. To use the ATEXcompliant GOT in explosive atmospheres, thoroughly read this manual, the GOT2000 Series User's Manual (Hardware), and other relevant manuals introduced therein. Make sure to pay full attention to
safety and handle the product correctly.
The precautions given in this manual are concerned with the ATEXcompliant GOT to be used specifically in explosive atmospheres.
In this manual, the safety precautions are ranked as "DANGER".
Always follow the instructions because they are important to personal safety.
Please save this manual to make it accessible when required and
always forward it to the end user.
SAFETY PRECAUTIONS
Indicates that incorrect handling may cause
hazardous conditions, resulting in death or
serious injury.
[INSTALLATION PRECAUTIONS]
When conducting work (such as installing, operating, or
maintaining the product) in an explosive atmosphere, conform to
the following standards, laws, and regulations. Not doing so
results in death or serious injury.
• Standard IEC 60079-14: Explosive atmospheres - Part 14:
Electrical installations design, selection and erection
• Standard EN 60079-17: Explosive atmospheres - Part 17:
Inspection and maintenance of electrical installations in
hazardous areas
• Regional laws and regulations, etc.
Use both the fittings included with the GOT and separately sold
special fittings (*1) to install the GOT to the control panel.
*1 When purchasing special fittings, consult your local
Mitsubishi representative or branch office.
GOT
GT2712-STWD
GT2710-VTWD
GT2510-VTWD
GT2508-VTWD does not require special fittings.
Special fitting name
GT25-12FIT-EXS
GT25-10FIT-EXS
1D7MQ3
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
0
a: Use the Installation fitting (4 fittings)
b: Use GT25-10FIT-EXS (separately sold product). (2 fittings)
a: Use the Installation fitting (4 fittings)
b: Use GT25-12FIT-EXS (separately sold product). (4 fittings)
In the middle (b
• Press "b" (GT25-12FIT-EXS, GT25-10FIT-EXS) by hand and
attach it.
Sold separately Protective sheet(*2) is attached on the GOT
surface.
*2 For the Protective sheet sold separately, contact your local
sales office.
GOT
GT2712-STWD
GT2710-VTWD
GT2510-VTWD
GT2508-VTWD
If the protective sheet without the hole for the USB
environmental protection cover is attached, position the sheet
from the upper left of the GOT.
For GT2508-VTWD (4 fittings)
a
a
a: Use the Installation fitting (4 fittings)
For GT2710-VTWD, GT2510-VTWD (6 fittings)
a
b
a
For GT2712-STWD (8 fittings)
a
b
a
b
*1
a
a
a
b
a
*1
b
a
b
a
) of the top, attach a large metal fittings
Protective sheet name
GT25-12PSCC-UC
GT25-10PSCC-UC
GT25-08PSCC-UC
To attach the protective sheet, attach it from one direction
gradually. Make sure to fit the protective sheet onto the joining
surface closely without leaving any air between them.
Attach the protective sheet with adding additional pressure
sufficiently to the adhesive side of the outer circumference.
To hold adequate strength of the adhesive joining, use the GOT
after a lapse of about 24 hours.
If any of the fittings is out of place, the GOT installed to the
control panel does not comply with the ATEX Directive. (The
GOT cannot be used in explosive atmospheres.)
[PRECAUTIONS FOR INSTALLATION, REMOVAL,
OPERATION, AND MAINTENANCE]
The ATEX-compliant GOT is usable in Zone 2 or Zone 22
explosive atmospheres.
• Low mechanical impact: This equipment is to be installed in
an area of low mechanical impact.
• Electrostatic charging: Wipe the front panel with a damp cloth
before turning on the equipment.
• Extension and auxiliary extension interfaces : Extension and
auxiliary extension interfaces cannot be used in explosive
atmospheres.
• Before mounting or demounting, replacing, or wiring the GOT,
make sure that there is no explosive gas or dust around the
product.
• The ambient temperature of the protective enclosure must be
55°C or less.
• Make sure that each interface, the terminal block, an SD card,
and the battery cover are secured firmly into place.
• The USB cable must be clamped appropriately at the USB
interface (Host/Device). (Figure 1 is an example of clamping a
cable at the USB interface (Host).)
• The GOT must be installed in a protective enclosure with the
following protective structure rating.
- IP54 for use in gas atmospheres
- IP6X for use in dust atmospheres
• The protective enclosure cannot be opened while the system
is energized.
• Make sure to turn off the GOT, and then conduct work (such
as wiring or installing the GOT and inserting or removing an
SD card).
• Make sure that the FG terminal of the power supply is
grounded.
• Make sure that the GOT is screwed firmly into place.
• Do not use any damaged equipment.
Figure 1
The following shows manuals relevant to this product.
GOT2000 Series User’s Manual (Hardware) SH-081194ENG (1D7MJ5)
For detailed manuals and relevant manuals, refer to the Help or the
PDF manuals stored in the DVD-ROM for the screen design
software used.
The latest manuals are also available from MITSUBISHI
ELECTRIC FA Global Website (http://www.MitsubishiElectric.com/
fa/).
Before using the GOT
Connect the GOT to the battery.
Refer to the GOT2000 Series User ’s Manual (Hardware) for the
connection instructions.
For details on the GOT specifications, installing instructions, wiring,
maintenance
and inspection, or checking procedure for the version and the
compatible standard, refer to the GOT2000 Series User’s Manual
(Hardware).
Manual name Manual number (Model code)
© 2016MITSUBISHI ELECTRIC CORPORATION
1. CONFORMING STANDARDS
The GOT with the Ex marking on its rating plate complies with the
following standards.
- Standard EN 60079-0: Explosive atmospheres - Part 0:
Equipment - General requirements
- Standard EN 60079-15: Explosive atmospheres - Part 15:
Equipment protection by type of protection "n"
- Standard EN 60079-31: Explosive atmospheres - Part 31:
Equipment dust ignition protection by enclosure "t"
2. Ex MARKING
The ATEX-compliant GOT has the Ex marking on its rating plate as
shown below.
The following shows the meaning of the Ex marking.
(1) II 3G Ex nA IIC T5 Gc
(2) II 3D Ex tc IIIC T100°C Dc
(3) Tamb 0°C to +55°C
(4) TUV 15 ATEX 7585 X
(5) IECEx TUR 15.0030 X
|| 3 G Ex nA ||C T5 Gc
|| 3 D Ex tc |||C T100°C Dc
Tamb 0°C to +55°C
TUV 15 ATEX 7585 X
IECEx TUR 15.0030 X
II: Product group (non-mining)
3G: Product category (Zone 2, gases/vapors)
Ex: Explosion proof
nA: Type of protection (Non-sparking equipment)
IIC: Gas atmosphere (Typical gas: hydrogen)
T5: Temperature class (Highest surface temperature: 100°C)
Gc: Equipment protection level (Non-sparking equipment during
normal operation)
II: Product group (non-mining)
3D: Product category (Zone 22, dusts)
Ex: Explosion proof
Tc: Type of protection (Dust ignition protection)
IIIC: Dust atmosphere (Conductive dust)
T100°C: Highest surface temperature 100°C
Dc: Equipment protection level (Dust ignition protection by
enclosure)
Operating ambient temperature ranging from 0°C to 55°C
Certificate number
Certificate number
Manual
3. INSTALLING AND REMOVING THE
GOT
3.1 Installing the GOT
Install the GOT in the following procedure.
For the panel cutting dimensions for the GOT, refer to the following.
The following shows an installation example for the horizontal
direction.
For the vertical installation, install the GOT so that the vertical
installation arrow printed on the GOT rear face points
upward.
Step1. Insert the GOT rear face into the panel opening.
GOT
Panel opening
Step2. While positioning a fitting on the mounting hole of the GOT,
tighten a screw within the specified torque range
(0.42 N·m to 0.48 N·m).
Tightening the screw with a torque exceeding the specified
torque range may deform the GOT front panel,
causing the protective sheet to become crinkled.
For GT2508-VTWD (4 fittings)
a
a
3.2 Removing the GOT
Step1. Remove the screws from the GOT.
Remove the fittings from the GOT.
For GT2508-VTWD (4 fittings)
For GT2710-VTWD, GT2510-VTWD (6 fittings)
For GT2712-STWD (8 fittings)
4. INSTALLING AND REMOVING THE
BATTERY
Install a battery to the GOT before the first startup.
GT27 and GT25 come with a battery in the battery holder. Before
using GT27 and GT25, connect the battery connector to the GOT
connector.
To replace the battery, leave the GOT on for more than 10 minutes
before replacing the battery.Replace the battery within 5 minutes.
The following shows the procedure for installing and removing a
battery.(Described with the GOT rear face facing up.)
4.1 Installing the Battery
4.1.1 Installing the battery to GT2712-STWD, GT2710VTWD or GT2510-VTWD
Step1. Make sure that the GOT power is off.
Step2. Install the battery to the GOT rear face.
Open the battery cover as shown below.
Step3. Insert the battery connector to the GOT connector.
Battery cover
4.1.2 Installing the battery to GT2508-VTWD
Step1. Make sure that the GOT power is off.
Step2. Install the battery inside the SD card cover on the side of the
GOT.Open the SD card cover as shown in the following figure.
SD card cover
Step3. Insert the battery connector to the GOT connector.
SD card cover
Connector
Battery
Step4. After installing the battery to the battery holder of the GOT,
close the SD card cover until it clicks.
Black cable
Red cable
SD card coverBattery
a
a
a: Use the Installation fitting (4 fittings)
For GT2710-VTWD, GT2510-VTWD (6 fittings)
a
b
a
a: Use the Installation fitting (4 fittings)
b: Use GT25-10FIT-EXS (separately sold product). (2 fittings)
a
Step2. Remove the GOT from the panel opening.
GOT
Battery
Without a battery extension cable
Step4. After installing the battery to the battery holder of the GOT,
Panel opening
b
a
close the battery cover until it clicks.
Step5. Turn on the GOT.
Step6. Check that the battery condition is normal with the utility.
Connector
Battery coverBattery
Black cable
Red cable
Connector
Connector
Step5. Turn on the GOT.
Step6. Check that the battery condition is normal with the utility. For
the details of the battery condition display, refer to the following.

4.2 Removing the Battery
4.2.1 Removing the battery to GT2712-STWD, GT2710VTWD or GT2510-VTWD
Step1. Make sure that the GOT power is off.
Step2. The battery is stored in the GOT rear face. Open the battery
cover as shown below.
Battery coverBattery
Connector
Step3. Unplug the battery connector from the GOT connector.
Battery cover
4.2.2 Removing the battery to GT2508-VTWD
Step1. Make sure that the GOT power is off.
Step2. The battery is stored inside the SD card cover on the side of
the GOT. Open the SD card cover as shown in the following
figure.
SD card coverBattery
Connector
Step3. After removing the battery from the battery holder of the GOT,
unplug the battery connector from the GOT connector.
SD card cover
Connector
5. EC DECLARATION OF CONFORMITY
Black cable
Red cable
Battery Connector
Without a battery extension cable
Step4. Push and close the battery cover until it clicks.
Battery cover
Battery
Step4. Close the SD card cover until it clicks.
SD card cover
Black cable
Red cable
Warra nty
Mitsubishi will not be held liable for damage caused by factors found
not to be the cause of Mitsubishi; machine damage or lost profits
caused by faults in the Mitsubishi products; damage, secondary
damage, accident compensation caused by special factors
unpredictable by Mitsubishi; damages to products other than
Mitsubishi products; and to other duties.
For safe use
• This product has been manufactured as a general-purpose part for
general industries, and has not been designed or manufactured to
be incorporated in a device or system used in purposes related to
human life.
• Before using the product for special purposes such as nuclear
power, electric power, aerospace, medicine or passenger
movement vehicles, consult with Mitsubishi.
• This product has been manufactured under strict quality control.
However, when installing the product where major accidents or
losses could occur if the product fails, install appropriate backup or
failsafe functions in the system.
Country/Region Sales office/Tel
USA
Brazil
Mexico
Germany
UK
Italy
Spain
France
Czech
Turkey
Poland
Russia
South Africa
China
Taiwan
Korea
Singapore
Thailand
Indonesia
Vietnam
India
Australia
Mitsubishi Electric Automation, Inc.
500 Corporate Woods Parkway, Vernon Hills, IL 60061, U.S.A.
Tel: +1-847-478-2100
Mitsubishi Electric do Brasil Comercio e Servicos Ltda.
Rua Jussara, 1750- Bloco B Anexo, Jardim Santa Cecilia, CEP 06465-070,
Barueri - SP, Brasil
Tel: +55-11-4689-3000
Mitsubishi Electric Automation, Inc. Mexico Branch
Mariano Escobedo #69, Col. Zona Industrial, Tlalnepantla Edo. Mexico, C.P.54030
Tel: +52-55-3067-7511
Mitsubishi Electric Europe B.V. German Branch
Mitsubishi-Electric-Platz 1, 40882 Ratingen, Germany
Tel: +49-2102-486-0
Mitsubishi Electric Europe B.V. UK Branch
Travellers Lane, Hatfield, Hertfordshire, AL10 8XB, U.K.
Tel: +44-1707-28-8780
Mitsubishi Electric Europe B.V. Italian Branch
Centro Direzionale Colleoni - Palazzo Sirio, Viale Colleoni 7,
20864 Agrate Brianza (Milano), Italy
Tel: +39-039-60531
Mitsubishi Electric Europe B.V. Spanish Branch
Carretera de Rubi 76-80-Apdo.420, 08190 Sant Cugat del Valles (Barcelona), Spain
Tel: +34-935-65-3131
Mitsubishi Electric Europe B.V. French Branch
25, Boulevard des Bouvets, 92741 Nanterre Cedex, France
Tel: +33-1-55-68-55-68
Mitsubishi Electric Europe B.V. Czech Branch
Avenir Business Park, Radlicka 751/113e, 158 00 Praha 5, Czech Republic
Tel: +420-251-551-470
Mitsubishi Electric Turkey A.S. Umraniye Branch
Serifali Mahallesi Nutuk Sokak No:5, TR-34775 Umraniye / Istanbul, Turkey
Tel: +90-216-526-3990
Mitsubishi Electric Europe B.V. Polish Branch
ul. Krakowska 50, 32-083 Balice, Poland
Tel: +48-12-347-65-00
Mitsubishi Electric (Russia) LLC St. Petersburg Branch
Piskarevsky pr. 2, bld 2, lit “Sch”, BC “Benua”, office 720;
RU-195027 St. Petersburg, Russia
Tel: +7-812-633-3497
Adroit Technologies
20 Waterford Office Park, 189 Witkoppen Road, Fourways, Johannesburg, South Africa
Tel: +27-11-658-8100
Mitsubishi Electric Automation (China) Ltd.
No.1386 Hongqiao Road, Mitsubishi Electric Automation Center, Shanghai, China
Tel: +86-21-2322-3030
SETSUYO ENTERPRISE CO., LTD.
6F, No.105, Wugong 3rd Road, Wugu District, New Taipei City 24889, Taiwan
Tel: +886-2-2299-2499
Mitsubishi Electric Automation Korea Co., Ltd.
7F-9F, Gangseo Hangang Xi-tower A, 401, Yangcheon Gangseo-Gu,
Seoul 07528, Korea
Tel: +82-2-3660-9530
Mitsubishi Electric Asia Pte. Ltd.
307 Alexandra Road, Mitsubishi Electric Building, Singapore 159943
Tel: +65-6473-2308
Mitsubishi Electric Factory Automation (Thailand) Co., Ltd.
12th Floor, SV.City Building, Office Tower 1, No. 896/19 and 20 Rama 3 Road,
Kwaeng Bangpongpang, Khet Yannawa, Bangkok 10120, Thailand
Tel: +66-2682-6522 to 31
PT. Mitsubishi Electric Indonesia
Gedung Jaya 11th Floor, JL. MH. Thamrin No.12, Jakarta Pusat 10340, Indonesia
Tel: +62-21-3192-6461
Mitsubishi Electric Vietnam Co., LTD. Ho Chi Minh Head Office
Unit 01-04, 10th Floor, Vincom Center, 72 Le Thanh Ton Street, District 1,
Ho Chi Minh City, Vietnam
Tel: +84-8-3910-5945
Mitsubishi Electric India Pvt. Ltd. Pune Branch
Emerald House, EL -3, J Block, M.I.D.C., Bhosari, Pune - 411026, Maharashtra, India
Tel: +91-20-2710-2000
Mitsubishi Electric Australia Pty. Ltd.
348 Victoria Road, P.O. Box 11, Rydalmere, N.S.W. 2116, Australia
Tel: +61-2-9684-7777
HEAD OFFICE : TOKYO BUILDING, 2-7-3 MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN
NAGOYA WORKS : 1-14, YADA-MINAMI 5-CHOME, HIGASHI-KU, NAGOYA, JAPAN
When exported from Japan, this manual does not require application to the Ministry
of Economy, Trade and Industry for service transaction permission.
Specifications subject to change without notice.
Printed in Japan, September 2016.