Metro LEC9600A User Manual

Equipment Platform
ASSEMBLY
INSTRUCTIONS
LIST OF COMPONENTS
For the Assembly of the Equipment Platform
CART WITH EQUIPMENT PLATFORM
Model No. LEC9600A
E
D C
B
A
Item Description Qty.
A. Equipment Platform 1 B. Bolt 1/4-20 Hex Head 2 C. Washer 2 D. Washer 4 E. Hex Nut 1/4-20 4
InterMetro Industries Corporation
®
North Washington Street, Wilkes-Barre, PA 18705
For Product Information Call: 1-800-433-2232 Visit Our Web Site: www.metro.com
ASSEMBLY
For the Equipment Platform
Equipment Platform
ASSEMBLY INSTRUCTIONS
For Equipment Platform
1. With the entry mechanism in the retracted position, remove the backboard.
2. Take the equipment platform and with the handles and ledge up, fit the threaded studs into the holes on the handle side of the cart (Fig. 1).
3. Slip a large washer over each stud from the inside of the cart and install the nuts provided until tight.
4. Slip a large flat washer over each bolt and then from the inside, slip the bolts through the holes provided in the bottom of the tub (See Note 1).
5. Fit the support wires over the bolts and slip a small flat washer onto the bolts. Install a nut onto each bolt and tighten (Fig. 2).
NOTE: The equipment platform is not to be used as a foot rest.
Max. weight load capacity 30 lbs.
NOTE 1: The following drilling operation may be required on your cart.
If holes in the bottom of your cart are
3
not 10 holes per diagram A.
DIAG. A
THIS COMPLETES THE ASSEMBLY OF THE EQUIPMENT PLATFORM.
/4” apart, drill 2-5/16 diameter
Fig. 1 Fig. 2
InterMetro Industries Corporation
®
North Washington Street, Wilkes-Barre, PA 18705
For Product Information Call: 1-800-433-2232 Visit Our Web Site: www.metro.com
L01-110
Rev. A
Information and specifications are subject to change
without notice. Please confirm at time of order.
8/95
Loading...