ROTARY TUMBLER
INSTRUCTIONS AND PARTS LIST
Model
QT66
Model
QT12
Model
QT6
LORTONE
12130 Cyrus Way
Mukilteo, WA 98275
Copyright © 2008 Lortone, Inc (425) 493-1600
SETTING UP YOUR MACHINE
Install The Barrel Guide: Using the machine screw provided, install the barrel guide under the frame edge as shown in the picture. Align the slot in the guide with the groove in the knurled nut on the barrel. Adjust the position of the guide so the slot is centered on the groove. Tighten the screw securely with the nut provided.
Install Barrel guide under the tumbler frame edge. Tighten screw securely.
Copyright © 2008 Lortone, Inc
1
GETTING STARTED
I.Open the Barrel: Remove nut and washer, press down on bolt with thumb while lifting up on outside of outer lid with fingers. If outer lid is difficult to remove, insert washer between edge of outer lid and barrel, twist to loosen. After outer lid has been removed, lift inner lid out by center bolt.
II.Add Rocks: Fill Barrel about
1⁄2 to 2/3 full of rock. Rocks should be of assorted sizes for best results.
III. Add Abrasive: Add |
|
60/90 Silicon Carbide |
|
Abrasive. Use 10 level |
Add rocks |
Tbsp for a 6 Lb. barrel. |
until 2/3 full. |
Use 20 level Tbsp for a |
Add water to |
12 lb. barrel. |
top layer of |
Add water to cover |
rocks. |
|
|
rocks and abrasive. |
|
Do not overfill. |
|
IV. Close the Barrel: Wipe the mating surfaces of the barrel and inner lid clean with a damp cloth. Press inner lid into barrel until it rests on shoulder. Press outer lid firmly down onto the barrel. Install washer and tighten nut.
Knurled nut only needs to be snug Do Not Use tools to tighten. Over tightening of the nut can cause the inner lid to distort and leak.
Copyright © 2008 Lortone, Inc
2
Make sure to align barrel guide with groove in black knurled nut.
Plug tumbler in and place barrel on tumbler.
V.Tumble: Plug the tumbler into a suitable outlet. Place the barrel on the tumbler making sure the groove in the barrel nut sits on the tumbler guide. Tumble for 2-3 days. Open and check the rocks. The rough edges should be wearing down. After 5-7 days, open the barrel and rinse the rocks in a bucket of water. DO NOT put the rinse water down a household drain as it will clog the drain!
IMPORTANT: Clean the rocks and barrel parts thoroughly using mild soap and water!
VI. Repeat steps II through V: Use succesively finer abrasives according to your tumbling instruction booklet and the chart below:
|
Step 1 |
Step 2 |
Step 3 |
Step 4 |
|
|
|
|
|
Compound |
60/90 |
120/220 |
Pre-Polish |
Polish |
|
Silicon |
Silicon |
Aluminum |
Aluminum |
|
Carbide |
Carbide |
Oxide |
Oxide |
|
|
|
|
|
6 lb Barrel |
10 Tbsp |
10 Tbsp |
12 Tbsp |
12 Tbsp |
|
|
|
|
|
12 lb Barrel 20 Tbsp |
20 Tbsp |
24 Tbsp |
24 Tbsp |
|
|
|
|
|
|
|
Copyright © 2008 |
Lortone, Inc |
|
3