This manual must only be used
by a qualified heating installer
/ service technician. Read all
instructions, including this manual
and the Knight Fire Tube Boiler
Service Manual, before installing.
Perform steps in the order given.
Failure to comply could result in
severe personal injury, death, or
substantial property damage.
Revision Notes .................................................. Back Cover
Hazard definitions
The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or
to important information concerning the life of the product.
DANGER
WARNING
CAUTION
CAUTION
NOTICE
2
DANGER indicates an imminently hazardous situation which, if not avoided, will result in death or serious
injury.
WARNING indicates a potentially hazardous situation which, if not avoided, could result in death or serious
injury.
CAUTION indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate
injury.
CAUTION used without the safety alert symbol indicates a potentially hazardous situation which, if not
avoided, may result in property damage.
NOTICE indicates special instructions on installation, operation, or maintenance that are important but not
related to personal injury or property damage.
Page 3
Please read before proceeding
Installation & Operation Manual
WARNING
NOTICE
WARNING
WARNING
Installer – Read all instructions, including
this manual and the Knight
Boiler Service Manual, before installing.
Perform steps in the order given.
User – This manual is for use only
by a qualified heating installer/
service technician. Refer to the User’s
Information Manual for your reference.
Have this boiler serviced/inspected by
a qualified service technician, at least
annually.
Failure to comply with the above could
result in severe personal injury, death or
substantial property damage.
When calling or writing about the boiler
– Please have the boiler model and serial
number from the boiler rating plate.
Consider piping and installation when
determining boiler location.
Any claims for damage or shortage in
shipment must be filed immediately
against the transportation company by
the consignee.
Factory warranty (shipped with unit) does
not apply to units improperly installed or
improperly operated.
Failure to adhere to the guidelines on this
page can result in severe personal injury,
death, or substantial property damage.
If the information in this manual is not
followed exactly, a fire or explosion may
result causing property damage, personal
injury or loss of life.
This appliance MUST NOT be installed in
any location where gasoline or flammable
vapors are likely to be present.
Fire Tube
WARNING
DO NOT install units in rooms or
environments that contain corrosive
contaminants (see Table 1B). Failure to
comply could result in severe personal
injury, death, or substantial property
damage.
When servicing boiler –
• To avoid electric shock, disconnect electrical supply
before performing maintenance.
• To avoid severe burns, allow boiler to cool before
performing maintenance.
Boiler operation –
• Do not block flow of combustion or ventilation air to
the boiler.
• Should overheating occur or gas supply fail to shut off,
do not turn off or disconnect electrical supply to
circulator. Instead, shut off the gas supply at a location
external to the appliance.
• Do not use this boiler if any part has been under water.
The possible damage to a flooded appliance can be
extensive and present numerous safety hazards. Any
appliance that has been under water must be replaced.
Boiler water –
• Thoroughly flush the system (without boiler
connected) to remove sediment. The high-efficiency
heat exchanger can be damaged by build-up or
corrosion due to sediment.
CAUTION
CAUTION
Do not use petroleum-based cleaning or
sealing compounds in the boiler system.
Gaskets and seals in the system may be
damaged. This can result in substantial
property damage.
Do not use “homemade cures” or “boiler
patent medicines”. Serious damage to
the boiler, personnel, and/or property
may result.
WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electric switch; do
not use any phone in your building.
• Immediately call your gas supplier
from a near by phone. Follow the
gas supplier’s instructions.
• If you cannot reach your gas supplier,
call the fire department.
• Installation and service must be
performed by a qualified installer,
service agency, or the gas supplier.
Freeze protection fluids –
• NEVER use automotive antifreeze. Use only inhibited
propylene glycol solutions, which are specifically
formulated for hydronic systems. Ethylene glycol is
toxic and can attack gaskets and seals used in hydronic
systems.
3
Page 4
Installation & Operation Manual
The Knight Fire Tube Boiler - How it works...
1. Stainless steel heat exchanger
Allows system water to flow around specially designed tubes
for maximum heat transfer, while providing protection against
flue gas corrosion.
2. Combustion chamber access cover
Allows access to the combustion side of the heat
exchanger.
3. Blower
The blower pulls in air and gas through the venturi (item
5). Air and gas mix inside the blower and are pushed into the
burner, where they burn inside the combustion chamber.
4. Gas valve
The gas valve senses the negative pressure created by the
blower, allowing gas to flow only if the gas valve is
powered and combustion air is flowing.
5. Venturi
The venturi controls air and gas flow into the burner.
6. Flue gas sensor (limit rated)
This sensor monitors the flue gas exit temperature. The control
module will modulate and shut down the boiler if flue gas
temperature gets too hot. This protects the flue pipe from
overheating.
7. Boiler outlet temperature sensor (housed with the
high limit sensor)
This sensor monitors boiler outlet water temperature (system
supply). If selected as the controlling sensor, the control
module adjusts boiler firing rate so the outlet temperature is
correct.
8. Boiler inlet temperature sensor
This sensor monitors return water temperature (system
return). If selected as the controlling sensor, the control
module adjusts the boiler firing rate so the inlet temperature is
correct.
9. Temperature and pressure gauge
Monitors the outlet temperature of the boiler as well as the
system water pressure.
10. Electronic LCD display
The display features a high resolution liquid crystal screen, four
(4) buttons, and a navigation dial. A serial and USB port
support additional communication with the control.
11. Flue pipe adapter
Universal vent adapter allows connection of PVC/CPVC,
polypropylene, or stainless steel venting systems to the boiler.
12. Burner (not shown)
Made with metal fiber and stainless steel construction,
the burner uses pre-mixed air and gas and provides a
wide range of firing rates.
13. Water outlet (system supply)
Copper water connection that supplies hot water to the
system, either 1" or 1-1/4", depending on the
model.
14. Water inlet (system return)
Copper water connection that returns water from the system
to the heat exchanger, either 1" or 1-1/4", depending on the
model.
15. Gas connection pipe
Threaded pipe connection. This pipe should be connected
to the incoming gas supply for the purpose of delivering
gas to the boiler.
16. SMART SYSTEM Control Module
The SMART SYSTEM Control responds to internal and
external signals to regulate the blower, gas valve, and pump
functions to meet heating demand. Optional remote
connectivity allows boiler settings to be monitored and
modified when connected to the internet.
17. Air intake adapter (Models 110 - 285 only)
Allows for the connection of the PVC air intake pipe to
the boiler.
18. High voltage junction box
The junction box contains the connection points for the line
voltage power and all pumps.
19. Low voltage connection board
The connection board is used to connect external low voltage
devices.
20. Low voltage wiring connections
Conduit connection points for the low voltage
connection board.
21. Condensate trap
The condensate trap has a 1/2" PVC outlet connection pipe.
22. Access cover - front
Provides access to the gas valve, control panel, and heat exchanger.
23. Ignition electrode
Provides direct spark for igniting the burner.
24. Flame inspection window
The quartz glass window provides a view of the burner
surface and flame.
25. Relief valve
Protects the heat exchanger from an over pressure condition.
The relief valve provided with the unit is set at 30 psi.
26. Flame sensor
Used by the control module to detect the presence of burner
flame.
27. Line voltage wiring connections
Conduit connection points for the high voltage junction box.
28. Top panel
Removable panel allows access to the gas train and combustion
chamber.
29.Side access panels (not shown)
Remove panels to gain access to temperature sensors.
30. Power switch
Turns 120 VAC ON/OFF to the boiler.
31. Leveling legs
Used to allow the heat exchanger to be leveled. This is needed
for the proper draining of the condensate from the combustion
chamber.
32.Flue and temperature access door
Provides access to the flue and temperature sensor.
33.Transformer
The transformer provides 24V power to the integrated control.
34.High limit sensor (housed with the outlet
temperature sensor)
Device that monitors the outlet water temperature. If the
temperature exceeds its setting, the integrated control will
break the control circuit, shutting the boiler down.
35.Stainless steel flue collector (not shown)
Flue gas and condensate enter the stainless flue collector through
the fire tubes. A 1" drain connection allows condensate to flow
through the collector into a condensate trap for disposal.
36.Line voltage receptacle
Equipment outlet for use with a condensate pump or other low
power equipment. Do not exceed 7 amp load.
Note: The power outlet is on a separate circuit than the boiler ON/
OFF switch, and will remain powered when the boiler is turned off.
4
Page 5
Installation & Operation Manual
The Knight Fire Tube Boiler - How it works... (continued)
22
10
28
Front View
DIR #2000507762 00
4
5
3
2
25
23
26
DIR #2000557480 00
24
Top View (inside unit)
11
34
29
7
13
15
6
8
14
17
9
36
27
30
20
18
19
31
21
DIR #
2000557480 00
DIR #
2000557480
Left Side (inside unit) Front View (inside unit)
1
16
33
00
5
Page 6
Ratings
A
S
M
E
H
Installation & Operation Manual
Knight Fire Tube Boiler
Other Specifications
AHRI Rating
Model Number
KHB(XXX)(N,L)
XXX = Input (MBH)
N = Natural Gas
L = Propane Gas
KHB055(N,L)8.255514495
KHB085(N,L)8.585796995
KHB110(N,L)111101028995
KHB155(N,L)15.515514412595
KHB199(N,L)2019918416095
KHB285(N,L)28.528526422995
NOTICE
Min Max
Maximum allowed working pressure is located on the rating plate.
Input
MBH
(Note 5)
Heating
Capacity
MBH
(Note 2,7)
Net
AHRI
Ratings
Water,
MBH
(Note 3,7)
Notes:
1. As an Energy Star Partner, Lochinvar has determined that
Knight Fire Tube boilers meet the Energy Star guidelines
for energy efficiency.
2. The ratings are based on standard test procedures prescribed
by the United States Department of Energy.
3. Net AHRI ratings are based on net installed radiation of
sufficient quantity for the requirements of the building
and nothing need be added for normal piping and pickup.
Ratings are based on a piping and pickup allowance of 1.15.
4. Knight Fire Tube boilers require special gas venting. Use
only the vent materials and methods specified in the Knight
Fire Tube Installation and Operation Manual.
5. Standard Knight Fire Tube boilers are equipped to operate
from sea level to 4,500 feet only. The boiler will de-rate by
4% for each 1,000 feet above sea level up to 4,500 feet.
6. High altitude Knight Fire Tube boilers are equipped to
operate from 3,000 to 9,600 feet. e boiler will de-rate
1.7% between 5,000 to 9,600 feet. For any units installed
past 9,600 feet there is an additional de-rate of 4% per 1,000
feet beyond 9,600 feet per the National Fuel Gas Code.
Boilers con gured for high altitude shall not be installed
below 3000 feet.
e operation given in this manual remains the same as the
standard boilers. A high altitude label (as shown in FIG A.)
is also a xed to the unit.
De-rate values are based on proper combustion calibration
and
7. Ratings have been confirmed by the Hydronics Section of
CO2’s adjusted to the recommended levels.
AHRI.
6
AFUE
%
(Note 1, 7)
Boiler
Water
Content
Gallons
2.31"1/2"2"2"
2.21"1/2"2"2"
2.31"1/2"3"3"
3.21"1/2"3"3"
5.21-1/4"1/2"3"3"
4.91-1/4"1/2"3"3"
Water
Connections
Gas
Connections
Air
Size
Vent
Size
(Note 4,8)
8. Models 055 - 085 can be alternatively vented using a 3" vent/
air size, the 110 model can be alternatively vented using a
2" vent/air size, and the 285 model can be alternatively
vented using a 4" vent/air size. See the General Venting
- Sizing Section of this manual for maximum allowable
lengths.
9. The manual reset high limit provided with the Knight Fire
Tube is listed to UL353.
UNIT EQUIPPED FOR
HIGH ALTITUDE
3,000 FT. TO 9,600 FT.
DIR #
2000557484
00
Figure A High Altitude Label Location
Page 7
1 Determine boiler location
Installation & Operation Manual
Installation must comply with:
• Local, state, provincial, and national codes, laws,
regulations, and ordinances.
• National Fuel Gas Code, ANSI Z223.1 – latest edition.
• Standard for Controls and Safety Devices for Automatically
Fired Boilers, ANSI/ASME CSD-1, when required.
• National Electrical Code.
• For Canada only: B149.1 Installation Code, CSA C22.1
Canadian Electrical Code Part 1 and any local codes.
NOTICE
The Knight Fire Tube boiler gas manifold
and controls met safe lighting and other
performance criteria when the boiler
underwent tests specified in ANSI Z21.13
– latest edition.
Before locating the boiler, check:
1. Check for nearby connection to:
• System water piping
• Venting connections
• Gas supply piping
• Electrical power
2. Locate the appliance so that if water connections should
leak, water damage will not occur. When such locations
cannot be avoided, it is recommended that a suitable
drain pan, adequately drained, be installed under the
appliance. The pan must not restrict combustion air
flow. Under no circumstances is the manufacturer to be
held responsible for water damage in connection with
this appliance, or any of its components.
3. Check area around the boiler. Remove any combustible
materials, gasoline and other flammable liquids.
WARNING
4. The Knight Fire Tube boiler must be installed so that gas
control system components are protected from dripping
or spraying water or rain during operation or service.
5. If a new boiler will replace an existing boiler, check for
and correct system problems, such as:
• System leaks causing oxygen corrosion or heat
exchanger cracks from hard water deposits.
• Incorrectly-sized expansion tank.
• Lack of freeze protection in boiler water causing system
and boiler to freeze and leak.
• Debris left from existing piping, if not flushed and
cleaned with an appropriate cleaner.
6. Check around the boiler for any potential air
contaminants that could risk corrosion to the boiler
or the boiler combustion air supply (see Table 1B).
Prevent combustion air contamination. Remove any of
these contaminants from the boiler area.
WARNING
Failure to keep boiler area clear and free
of combustible materials, gasoline, and
other flammable liquids and vapors can
result in severe personal injury, death, or
substantial property damage.
DO NOT install units in rooms or
environments that contain corrosive
contaminants (see Table 1B). Failure to
comply could result in severe personal
injury, death, or substantial property
damage.
WARNING
WARNING
This appliance is certified as an indoor
appliance. Do not install the appliance
outdoors or locate where the appliance
will be exposed to freezing temperatures
or to temperatures that exceed 100°F.
Do not install the appliance where the
relative humidity may exceed 93%.
Do not install the appliance where
condensation may form on the inside
or outside of the appliance, or where
condensation may fall onto the appliance.
Failure to install the appliance indoors
could result in severe personal injury,
death, or substantial property damage.
This appliance requires a special venting
system. Use only the vent materials,
primer and cement specified in this
manual to make the vent connections.
Failure to follow this warning could result
in fire, personal injury, or death.
Closet and alcove installations
A closet is any room the boiler is installed in which the room
volume is less than the room volume listed in the table below.
An alcove is any room which meets the criteria for a closet,
but it does not have a door.
Table 1A Room Volume
ModelRoom Volume (in cubic feet)
55 - 285124
Example: Room dimensions = 4 feet long, 3 feet wide, and
8 foot ceiling = 4 x 3 x 8 = 96 cubic feet. This would be
considered a closet for a 285 model.
WARNING
Recommended clearances for service access
- Front / Left / Top ........................................................ 24"
- Back / Right ................................................................. 0"
NOTICE
For closet and alcove installations as shown
in FIG.’s 1-1 and 1-2, CPVC, polypropylene
or stainless steel vent material must be used
inside the structure. The ventilating air
openings shown in FIG. 1-1 are required
for closet installations. Failure to follow this
warning could result in fire, personal injury,
or death.
If you do not provide the recommended
service clearances shown, it may not be
possible to service the boiler without
removing it from the space.
For alcove installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used
in an alcove structure due to
elevated temperatures. Failure to
follow this warning could result
in fire, personal injury, or death.
Required Clearances to Combustible Materials
- Front .........................................................................6"
- Top / Le Side ........................................................ 12"
- Back / Right Side .....................................................0"
6"
FRONT
12"
LEFT
DIR #2000507571 00
8
Page 9
1 Determine boiler location (continued)
Installation & Operation Manual
Provide clearances:
Clearances from combustible materials
1. Hot water pipes—at least 1/4" (6 mm) from combustible
materials.
2. Vent pipe – at least 1" (25 mm) from combustible
materials.
3. See FIG.’s 1-1 and 1-2 on page 8 for other clearance
minimums.
Provide air openings to room:
Knight Fire Tube boiler alone in boiler room
1. No air ventilation openings into the boiler room are
needed when the total room volume is greater than the
value given for closet installations (see Table 1A). For
spaces that do NOT supply this clearance, provide two
openings as shown in FIG. 1-1. Each opening must
provide one square inch free area per 1,000 Btu/hr of
boiler input.
Knight Fire Tube boiler in same space with other
gas or oil-fired appliances
1. Follow the National Fuel Gas Code (U.S.) or CSA B149.1
(Canada) to size/verify size of the combustion/ventilation
air openings into the space.
WARNING
2. Size openings only on the basis of the other appliances
in the space. No additional air opening free area is
needed for the Knight Fire Tube boiler because it takes
its combustion air from outside (direct vent installation).
The space must be provided with
combustion/ventilation air openings
correctly sized for all other appliances
located in the same space as the Knight
Fire Tube boiler.
Do not install the boiler in an attic.
Failure to comply with the above warnings
could result in severe personal injury,
death, or substantial property damage.
Flooring and foundation
Flooring
The Knight Fire Tube boiler is approved for installation
on combustible flooring, but must never be installed on
carpeting.
WARNING
If flooding is possible, elevate the boiler sufficiently to prevent
water from reaching the boiler.
Do not install the boiler on carpeting even
if foundation is used. Fire can result,
causing severe personal injury, death, or
substantial property damage.
Residential garage installation
Precautions
Take the following precautions when installing the appliance
in a residential garage. If the appliance is located in a
residential garage, it should be installed in compliance with
the latest edition of the National Fuel Gas Code, ANSI Z223.1
and/or CAN/CGA-B149 Installation Code.
• Appliances located in residential garages and in
adjacent spaces that open to the garage and are not part
of the living space of a dwelling shall be installed so that
all burners and burner ignition devices are located not
less than 18 inches (46 cm) above the floor.
• The appliance shall be located or protected so that it is
not subject to physical damage by a moving vehicle.
Vent and air piping
The Knight Fire Tube boiler requires a special vent system,
designed for pressurized venting.
The boiler is to be used for either direct vent installation or
for installation using indoor combustion air. When room
air is considered, see Section 3, General Venting. Note
prevention of combustion air contamination below when
considering vent/air termination.
Vent and air must terminate near one another and may be
vented vertically through the roof or out a side wall, unless
otherwise specified. You may use any of the vent/air piping
methods covered in this manual. Do not attempt to install
the Knight Fire Tube boiler using any other means.
Be sure to locate the boiler such that the vent and air piping
can be routed through the building and properly terminated.
The vent/air piping lengths, routing and termination method
must all comply with the methods and limits given in this
manual.
Prevent combustion air contamination
Install air inlet piping for the Knight Fire Tube boiler as
described in this manual. Do not terminate vent/air in
locations that can allow contamination of combustion air.
Refer to Table 1B, for products and areas which may cause
contaminated combustion air.
WARNING
You must pipe combustion air to the boiler
air intake. Ensure that the combustion air
will not contain any of the contaminants
in Table 1B. Contaminated combustion
air will damage the boiler, resulting in
possible severe personal injury, death
or substantial property damage. Do not
pipe combustion air near a swimming
pool, for example. Also, avoid areas
subject to exhaust fumes from laundry
facilities. These areas will always contain
contaminants.
9
Page 10
1 Determine boiler location
Installation & Operation Manual
Table 1B Corrosive Contaminants and Sources
Products to avoid:
Spray cans containing chloro/fluorocarbons
Permanent wave solutions
Chlorinated waxes/cleaners
Chlorine-based swimming pool chemicals
Calcium chloride used for thawing
Sodium chloride used for water softening
Refrigerant leaks
Paint or varnish removers
Hydrochloric acid/muriatic acid
Cements and glues
Antistatic fabric softeners used in clothes dryers
Chlorine-type bleaches, detergents, and cleaning solvents
found in household laundry rooms
Adhesives used to fasten building products and other
similar products
Areas likely to have contaminants
Dry cleaning/laundry areas and establishments
Swimming pools
Metal fabrication plants
Beauty shops
Refrigeration repair shops
When using an existing vent system to
install a new boiler:
WARNING
Check the following venting components before installing:
• Material - For materials listed for use with this appliance,
see Section 3 - General Venting.
• Size - To ensure proper pipe size is in place, see the
General Venting - Sizing Section of this manual. Check
to see that this size is used throughout the vent system.
• Manufacturer - For a stainless steel or polypropylene
application, you must use only the listed manufacturers
and their type product listed in the General Venting
Section for CAT IV positive pressure venting with flue
producing condensate.
• Supports - Non-combustible supports must be in place
allowing a minimum 1/4" rise per foot. The supports
should adequately prevent sagging and vertical slippage,
by distributing the vent system weight. For additional
information, consult the vent manufacturer’s
instructions for installation.
• Terminations - Carefully review Sections 3 through 5 to
ensure requirements for the location of the vent and air
terminations are met and orientation of these fit the
appropriate image from the Sidewall or Vertical
options listed in the General Venting Section.
• Seal - With prior requirements met, the system should be
tested to the procedure listed in parts (c) through (f) of
the Removal of an Existing Boiler Section.
Failure to follow all instructions can result
in flue gas spillage and carbon monoxide
emissions, causing severe personal injury
or death.
Photo processing plants
Auto body shops
Plastic manufacturing plants
Furniture refinishing areas and establishments
New building construction
Remodeling areas
Garages with workshops
10
With polypropylene and stainless steel vent, seal and connect
all pipe and components as specified by the vent manufacturer
used; with PVC/CPVC vent, see the General Venting - Install
Vent and Combustion Air Piping Section.
WARNING
If any of these conditions are not met,
the existing system must be updated or
replaced for that concern. Failure to
follow all instructions can result in flue gas
spillage and carbon monoxide emissions,
causing severe personal injury or death.
Page 11
1 Determine boiler location (continued)
When removing a boiler from existing
common vent system:
Installation & Operation Manual
DANGER
WARNING
At the time of removal of an existing boiler, the following steps
shall be followed with each appliance remaining connected
to the common venting system placed in operation, while
the other appliances remaining connected to the common
venting system are not in operation.
a. Seal any unused openings in the common venting
system.
b. Visually inspect the venting system for proper size and
horizontal pitch and determine there is no blockage
or restriction, leakage, corrosion, or other deficiencies,
which could cause an unsafe condition.
c. Test vent system – Insofar as is practical, close all
building doors and windows and all doors between the
space in which the appliances remaining connected to
the common venting system are located and other spaces
of the building. Turn on clothes dryers and any appliance
not connected to the common venting system. Turn on
any exhaust fans, such as range hoods and bathroom
exhausts, so they will operate at maximum speed. Do not
operate a summer exhaust fan. Close fireplace dampers.
Do not install the Knight Fire Tube boiler
into a common vent with any other
appliance. This will cause flue gas spillage
or appliance malfunction, resulting in
possible severe personal injury, death, or
substantial property damage.
Failure to follow all instructions can result
in flue gas spillage and carbon monoxide
emissions, causing severe personal injury
or death.
g. Any improper operation of the common venting system
should be corrected so the installation conforms with the
National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or
CAN/CSA B149.1, Natural Gas and Propane Installation
Code. When resizing any portion of the common venting
system, the common venting system should be resized
to approach the minimum size as determined using the
appropriate tables in Part 11 of the National Fuel Gas Code,
ANSI Z223.1/NFPA and/or CAN/CSA B149.1, Natural Gas
and Propane Installation Code.
d. Place in operation the appliance being inspected. Follow
the lighting instructions. Adjust thermostat so appliance
will operate continuously.
e. Test for spillage at the draft hood relief opening after
5 minutes of main burner operation. Use the flame of a
match or candle, or smoke from a cigarette, cigar, or pipe.
f. After it has been determined that each appliance
remaining connected to the common venting system
properly vents when tested as outlined herein, return
doors, windows, exhaust fans, fireplace dampers, and any
other gas-burning appliance to their previous conditions
of use.
11
Page 12
2 Prepare boiler
Remove boiler from wood pallet
1. After removing the outer shipping carton from the boiler,
remove the parts box.
2. Remove the front door to access the lag bolts in front of
the unit (FIG. 2-1).
3. To remove the boiler from the pallet (after removing the
front door):
a. Remove the two lag bolts from the wood pallet
inside the boiler (FIG. 2-1).
b. Detach the boiler from the lag bolts in the rear of the
unit, see FIG. 2-1.
NOTICE
Figure 2-1 Boiler Mounted on Shipping Pallet
FRONT
Gas conversions
WARNING
You must install a propane venturi and any additional
components supplied in the kit to operate the Knight Fire
Tube boiler on propane gas. Verify when installing that
the venturi label and orifice marking matches the boiler
size (see Table 2A).
Table 2A LP Conversion Table
ModelKit #
10026804020 mm2.45 mm 2.65 mm 100150434N/A
55
10026810420 mm2.45 mm 2.55 mm 100150434N/A
85
10028581522 mm3.00 mm 2.85 mm 100284510.250
110
10028581724 mm3.35 mm 2.95 mm 100284509.302
155
10028581824 mm3.40 mm 3.00 mm 100150947.302
199
10026810930 mm4.20 mm 4.00 mm 100150434N/A
285
*NOTE: e 199 LP air shutter should have the hole oriented towards
the back right corner of the unit.
Do not drop the boiler or bump the jacket
on the floor or pallet. Damage to the
boiler can result.
REAR
DIR #
LAG BOLTS
(QTY. 2)
2000557487
00
LAG BOLTS
(QTY. 2)
For a boiler already installed, you must
turn off gas supply, turn off power and
allow boiler to cool before proceeding.
You must also completely test the boiler
after conversion to verify performance
as described under Start-up, Section 10
of this manual. Failure to comply could
result in severe personal injury, death, or
substantial property damage.
Venturi Ø
(mm)
Orifice Ø
BottomTop
Air
Shutter
Stamping
Orifice
Installation & Operation Manual
1. If boiler is already installed, you must turn off
the gas supply, turn off the power, and allow the
boiler to cool before proceeding.
2. Remove the top panel front access cover from the
unit (no tools required for removal) and remove
the bezel.
3. Disconnect the air inlet piping from the venturi
by loosening the band clamp around the rubber
boot coupling. Slide the rubber boot off of the
venturi.
4. Disconnect gas piping from the venturi by
loosening the threaded nut on the venturi.
Remove the gasket between the gas piping and
venturi.
5. Remove the bolts connecting the venturi to
the fan and proceed to remove the natural
gas venturi from the unit, making sure not to
damage the blower O-ring gasket (FIG. 2-2).
6. a. Disconnect the wiring from the fan and
remove the bolts securing the fan to the
combustion chamber access cover.
b. Remove the fan and gasket, and install
the air shutter provided in the kit. NOTE: On 199 LP models, the air shutter MUST
be installed in the proper direction. Install
the air shutter so that the hole in the corner
is oriented towards the back right corner
of the unit (opposite the front door and gas
piping).
c. Replace all torn or damaged gaskets.
Reassemble the fan.
d. Reconnect the wiring harness before
operation.
7. Install the propane venturi and verify the
following:
a. The UP arrow on the plastic housing is
pointing up.
b. The threaded connection for the gas piping is
facing towards the front of the unit.
8. LP models 110 - 199 ONLY require an orifice to
be installed in the threaded venturi connection:
a. Locate the propane orifice from the
conversion kit bag and verify the stamping
on the orifice matches the boiler size (see
Table 2A).
b. With the stamped side facing inwards,
place the orifice in the cavity provided in
the threaded connection.
9. Reassemble the gas pipe to the threaded
connection on the venturi. Replace torn or
damaged gasket(s) and ensure the venturi gasket
is seated properly before tightening the nut on
the venturi.
12
Page 13
2 Prepare boiler (continued)
Installation & Operation Manual
10. Reconnect the rubber boot on the air inlet to the venturi
inlet and tighten the band clamp at this connection.
11. After installation is complete, attach the propane
conversion label (inside the conversion kit) next to the
boiler rating plate. Attach the LP caution label (inside the
conversion kit bag) to the left side of the boiler underneath
the gas supply piping.
12. Replace the top bezel and front access cover removed in
Step 1 and resume operation.
DANGER
When removing the natural gas venturi,
inspect the gasket at the gas connection
and the O-ring at the blower. These
gaskets must be in good condition and
must be installed. Failure to comply
will cause a gas leak, resulting in severe
personal injury or death.
Figure 2-2 Remove Natural Gas Venturi
BLOWER O-RING
FAN/BLOWER
GASKET
VENTURI
ORIFICE
(LP MODELS 110 - 199 ONLY)
VENTURI GASKET
Leveling the boiler
1. Set the boiler in place and check level.
a) Adjust legs if necessary to level boiler, see FIG. 2-3
below.
Figure 2-3 Leveling Legs on the Boiler
GASKET
AIR SHUTTER
GASKET
WARNING
DIR #2000544505 00
After converting to LP, check combustion
per the Start-up procedure in Section 10
of this manual. Failure to check and verify
combustion could result in severe personal
injury, death, or substantial property damage.
The Knight Fire Tube boiler must be vented and supplied with combustion and ventilation air as described
in this section. Ensure the vent and air piping and the combustion air supply comply with these instructions
regarding vent system, air system, and combustion air quality. See also Section 1 of this manual.
Inspect finished vent and air piping thoroughly to ensure all are airtight and comply with the instructions
provided and with all requirements of applicable codes. Failure to provide a properly installed vent and air
system will cause severe personal injury or death.
Installation & Operation Manual
WARNING
This appliance requires a special venting system. Use only approved stainless steel, PVC, CPVC or
polypropylene pipe and fittings listed for vent pipe, and fittings. Failure to comply could result in severe
personal injury, death, or substantial property damage.
WARNING
WARNING
WARNING
CAUTION
NOTICE
DO NOT mix components from different systems. The vent system could fail, causing leakage of flue products
into the living space. Mixing of venting materials will void the warranty and certification of the appliance.
Do not connect any other appliance to the vent pipe or multiple boilers to a common vent pipe. Failure to
comply could result in severe personal injury, death, or substantial property damage.
For closet and alcove installations, CPVC, polypropylene or stainless steel material MUST BE used in a closet/
alcove structure. Failure to follow this warning could result in fire, personal injury, or death.
Improper installation of venting systems may result in injury or death.
Installation must comply with local requirements and with the National Fuel Gas Code, ANSI Z223.1 for U.S.
installations or CSA B149.1 for Canadian installations.
You may use any of the vent / air piping methods covered in this manual. Do not attempt to install the Knight Fire Tube boiler
using any other means. Follow the procedures in this manual for the method chosen.
Air intake/vent connections
1. Combustion Air Intake Connector (FIG. 3-6) - Used to
provide combustion air directly to the unit from outdoors.
On Models 110 - 285 a fitting is provided on the unit for
final connection. Combustion air piping must be supported
per guidelines listed in the National Mechanical Code,
Section 305, Table 305.4 or as local codes dictate.
2. Vent Connector - Used to provide a passageway for
conveying combustion gases to the outside. A transition
fitting sized for PVC/CPVC, polypropylene, or stainless
steel is provided on the unit for final connection. Reference
the appropriate venting section to determine if an adapter
is needed to connect to the specific manufacturer’s vent.
Vent piping must be supported per the National Building
Code, Section 305, Table 305.4 or as local codes dictate.
Approved Air Intake
Terminations
• Elbow with Screen
• Stainless Steel Hood Intake
• Room Air Kit (see Table 3?)
Approved Vent Kits
• Sidewall Vent Kit (see Table 3A)
• Concentric Vent Kit (see Table 3B)
NOTE: When using the Sidewall Vent Kit with polypropylene, an adapter
kit must be used.
Approved Vent
Terminations
• Elbow with Screen
• Coupling with Screen
• Rain Cap
• Chimney Cover
Figure 3-6 Near Boiler Air Intake / Vent Connections
UNIVERSAL PVC/CPVC
POLYPROPYLENE OR
STAINLESS STEEL VENT
ADAPTER
Air intake / vent terminations
The Knight Fire Tube boiler vent and air piping can be
installed through the roof or through a sidewall. Intake air
must be supplied from outside to the boiler air intake adapter
unless following the Optional Room Air instructions in this
manual. The resultant installation is direct vent (sealed
combustion). Use only approved stainless steel, PVC, CPVC,
or polypropylene vent terminations listed. The location and
IR INTAKE
CONNECTOR
orientation of vent and air terminations must comply with the
requirements given in Section 3 through 5. Vent and air must
terminate near one another unless otherwise specified. Ensure
the location and orientation of the vent and air terminations
are met and comply with the requirements given in the
DIR #2000556896 00
Sidewall Direct Venting or Vertical Direct Venting Section.
15
Page 16
3 Generalventing
Air intake / vent location
The total length of piping for vent or air must not exceed the
limits given in the General Venting - Sizing Section. Follow
all instructions given in the specific venting section. Locate
the vent / air terminations using the following guidelines:
1. Position the vent termination where vapors will not
damage nearby shrubs, plants, air conditioning equipment,
or be objectionable.
2. The flue products will form a noticeable plume as they
condense in cold air. Avoid areas where the plume could
obstruct window views.
3. Prevailing winds could cause freezing of condensate and
water /ice buildup where flue products impinge on building
surfaces or plants.
4. Avoid possibility of accidental contact of flue products
with people or pets.
5. Do not locate the terminations where wind eddies could
affect performance or cause recirculation, such as inside
building corners, near adjacent buildings or surfaces,
window wells, stairwells, alcoves, courtyards, or other
recessed areas.
6. Do not terminate above any door or window. Condensate
can freeze, causing ice formations.
7. Locate or guard vent to prevent condensate damage to
exterior finishes.
8. Locate terminations so they are not likely to be damaged by
foreign objects, such as stones or balls, or subject to
buildup of leaves or sediment.
9. Vent must terminate:
• At least 6 feet from adjacent walls.
• No closer than 12 inches below roof overhang.
• At least 7 feet above any public walkway.
• At least 3 feet above any forced air intake within
10 feet.
• No closer than 12 inches below or horizontally
from any door or window or any other gravity air
inlet.
10. Do not terminate closer than 4 feet horizontally
from any electric meter, gas meter, regulator, relief
valve, or other equipment. Never terminate above or
below any of these within 4 feet horizontally.
11. Air inlet must terminate at least 12 inches above
grade or snow line, and at least 12 inches below the vent.
Optional room air
Commercial applications utilizing the Knight Fire Tube
boiler may be installed with a single pipe carrying the flue
products to the outside while using combustion air from the
equipment room.
Table 3A Optional Room Air Kit
Model Vent SizeKit Number
55 - 852 inch100157614
110 - 2853 inch100157615
16
Installation & Operation Manual
NOTICE
In order to use the room air venting option the following
conditions and considerations must be followed.
• The unit MUST be installed with the appropriate
room air kit.
• The equipment room MUST be provided with
properly sized openings to assure adequate
combustion air. Please refer to instructions provided
with the room air kit.
• There will be a noticeable increase in the noise level
during normal operation from the inlet air opening.
• Using the room air kit makes the unit vulnerable to
combustion air contamination from within the
building. Take precautions to ensure proper
installation.
• Vent system and terminations must comply with the
standard venting instructions set forth in this
manual.
WARNING
Air contamination
Pool and laundry products and common household and hobby
products often contain fluorine or chlorine compounds. When
these chemicals pass through the boiler, they can form strong
acids. The acid can eat through the boiler wall, causing serious
damage and presenting a possible threat of flue gas spillage or
boiler water leakage into the building.
Please read the information given in Table 1B, listing
contaminants and areas likely to contain them. If contaminating
chemicals will be present near the location of the boiler
combustion air inlet, have your installer pipe the boiler
combustion air and vent to another location, per this manual.
WARNING
WARNING
Optional room air is intended for
commercial applications. Combustion air
piping to the outside is recommended for
residential applications.
When utilizing the single pipe method,
provisions for combustion and ventilation
air must be in accordance with Air for
Combustion and Ventilation, of the latest
edition of the National Fuel Gas Code,
ANSI Z223.1, in Canada, the latest edition
of CGA Standard B149 Installation Code for
Gas Burning Appliances and Equipment, or
applicable provisions of the local building
codes.
If the boiler combustion air inlet is located in
a laundry room or pool facility, for example,
these areas will always contain hazardous
contaminants.
To prevent the potential of severe personal
injury or death, check for areas and products
listed in Table 1B before installing the boiler
or air inlet piping.
If contaminants are found, you MUST:
• Remove contaminants permanently.
—OR—
• Relocate air inlet and vent terminations
to other areas.
Page 17
3 Generalventing (continued)
Installation & Operation Manual
Requirements for installation in
Canada
1. Installations must be made with a vent pipe system
certified to ULC S636.
2. The first three (3) feet of plastic vent pipe from the
appliance flue outlet must be readily accessible for visual
inspection.
3. The components of the certified vent system must not be
interchanged with other vent systems or unlisted pipe/
fittings. For existing concentric vent installations, the inner
vent tube must be replaced with field supplied certified
vent material to comply with this requirement.
4. The 2", 3" and 4" Concentric and Sidewall Vent Kits
available from Lochinvar and IPEX (see Tables 3B and 3C)
are approved for use on the Knight Fire Tube boiler. All
kits are listed to the ULC S636 standard for use in Canada.
The Knight Fire Tube boiler uses model specific combustion
air intake and vent piping sizes as detailed in Table 3D. When
venting with flexible polypropylene, refer to the General
Venting - Polypropylene Section for allowable vent diameters
and maximum lengths.
Table 3E Equivalent Length Guidelines - Polypropylene
Vent ØVent Pipe45° Elbow90° ElbowTee
2 inch1 ft3 ft5 ft9 ft
3 inch1 ft4 ft7 ft15 ft
4 inch1 ft5 ft10 ft20 ft
See the Polypropylene Venting Section for flexible vent
installation guidelines and specific manufacturer equivalent
lengths.
Table 3F Equivalent Length - Concentric Vent Kits
Vent DiameterKit NumberEquivalent Length
2 inch10014048530 ft
3 inch10026900530 ft
4 inch10014048430 ft
NOTICE
Increasing or decreasing combustion air or
vent piping sizes is not authorized, unless
referenced in manual.
NOTICE
For Models 55 - 110 using 2" venting and
Model 285 using 3" venting, the first seven
(7) equivalent feet of vent must be CPVC
polypropylene, or stainless steel (field
supplied). This includes any transition
piece used to increase or decrease the vent
diameter.
NOTICE
NOTICE
The minimum combustion air and vent
piping length is 12 equivalent feet.
The appliance output rating will reduce by
up to 2.3% for each 25 feet of vent length.
Consult factory to determine de-rate values.
If the specific polypropylene vent manufacturer's instructions
do not list equivalent lengths for standard fittings, reference
Table 3E for guidelines.
Unless otherwise stated by the vent manufacturer, add 5 feet for
each 90° elbow and 3 feet for each 45° elbow of PVC/CPVC or
stainless steel venting material.
The air inlet pipe(s) must be sealed. Choose acceptable
combustion air inlet pipe materials from the following list:
PVC, CPVC, Polypropylene or ABS
Dryer Vent or Sealed Flexible Duct (not recommended
for rooftop air inlet)
Galvanized steel vent pipe with joints and seams sealed as
specified in this section.
Type “B” double-wall vent with joints and seams sealed as
specified in this section.
AL29-4C, stainless steel material to be sealed to
specification of its manufacturer.
An adapter may be required to transition between the air
inlet connection on the appliance and the air inlet pipe.
WARNING
NOTICE
Sealing of Type “B” double-wall vent material or galvanized
vent pipe material used for air inlet piping on a sidewall or
vertical rooftop Combustion Air Supply System:
a. Seal all joints and seams of the air inlet pipe using either
Aluminum Foil Duct Tape meeting UL Standard 723 or
181A-P or a high quality UL Listed silicone sealant such as
those manufactured by Dow Corning or General Electric.
b. Do not install seams of vent pipe on the bottom of
horizontal runs.
c. Secure all joints with a minimum of three (3) sheet metal
screws or pop rivets. Apply Aluminum Foil Duct Tape or
silicone sealant to all screws or rivets installed in the vent
pipe.
d. Ensure that the air inlet pipes are properly supported.
The PVC, CPVC, or ABS air inlet pipe should be cleaned and
sealed with the pipe manufacturer’s recommended solvents
and standard commercial pipe cement for the material used.
The PVC, CPVC, ABS, Dryer Vent or Flex Duct air inlet pipe
should use a silicone sealant to ensure a proper seal at the
appliance connection and the air inlet cap connection. Dryer
vent or flex duct should use a screw type clamp to seal the vent
to the appliance air inlet and the air inlet cap. Proper sealing
of the air inlet pipe ensures that combustion air will be free of
contaminants and supplied in proper volume.
Using air intake materials other than those
specified can result in personal injury,
death or property damage.
The use of double-wall vent or insulated
material for the combustion air inlet pipe is
recommended in cold climates to prevent
the condensation of airborne moisture in
the incoming combustion air.
When a sidewall or vertical rooftop combustion air supply
system is disconnected for any reason, the air inlet pipe
must be resealed to ensure that combustion air will be free of
contaminants and supplied in proper volume.
DANGER
Failure to properly seal all joints and seams
as required in the air inlet piping may result
in flue gas recirculation, spillage of flue
products and carbon monoxide emissions
causing severe personal injury or death.
Vent pipe materials:
The Knight Fire Tube boiler requires a special vent system,
designed for pressurized venting. Use only approved
manufacturers and materials for vent pipe and fittings.
Refer to the appropriate PVC/CPVC, Polypropylene, or
Stainless Steel Vent Section of this manual for approved
manufacturers and additional information.
Approved materials certified for Category IV and Direct Vent
appliance venting:
1. PVC - Schedule 40, Schedule 80, DWV
2. CPVC - Schedule 40, Schedule 80
3. AL29-4C Stainless Steel - UL-1738 and ULC S636
Listed from approved manufacturers
4. Polypropylene - ULC S636 Listed from approved
manufacturers
Follow the polypropylene manufacturer's instructions when
using polypropylene material as an inlet pipe.
18
Page 19
3 Generalventing (continued)
Installation & Operation Manual
PVC/CPVC
This product has been approved for use with the PVC/CPVC
vent materials listed in Table 3G.
NOTE: Closet and alcove installations require CPVC vent
pipe be used.
Installing vent and air piping
NOTICE
NOTICE
WARNING
Table 3G PVC/CPVC Vent Pipe, and Fittings
Use only cleaners, primers, and solvents
that are approved for the materials which
are joined together.
All PVC vent pipes must be glued, properly
supported, and the exhaust must be
pitched a minimum of a 1/4 inch per foot
back to the boiler (to allow drainage of
condensate).
Insulation should not be used on PVC
or CPVC venting materials. The use of
insulation will cause increased vent wall
temperatures, which could result in vent
pipe failure.
Approved PVC/CPVC Vent Pipe and Fittings
ItemMaterialStandard
PVC Schedule 40, 80 ANSI/ASTM D1785
Vent pipe
Vent fittings
Pipe Cement /
Primer
NOTICE: DO NOT USE CELLULAR (FOAM) CORE PIPE
PVC - DWVANSI/ASTM D2665
CPVC Schedule 40, 80 ANSI/ASTM F441
PVC Schedule 40ANSI/ASTM D2466
PVC Schedule 80ANSI/ASTM D2467
CPVC Schedule 40ANSI/ASTM F438
CPVC Schedule 80ANSI/ASTM F439
PVC - DWVANSI/ASTM D2665
PVCANSI/ASTM D2564
CPVCANSI/ASTM F493
1. Work from the boiler to vent or air termination. Do
not exceed the lengths given in this manual for the air
or vent piping.
2. Cut pipe to the required lengths and deburr the inside
and outside of the pipe ends.
3. Chamfer outside of each pipe end to ensure even
cement distribution when joining.
4. Clean all pipe ends and fittings using a clean dry rag.
(Moisture will retard curing and dirt or grease will prevent
adhesion.)
5. Dry fit vent or air piping to ensure proper fit up before
assembling any joint. The pipe should go a third to
two-thirds into the fitting to ensure proper sealing after
cement is applied.
6. Priming and Cementing:
a. Handle fittings and pipes carefully to prevent
contamination of surfaces.
b. Apply a liberal even coat of primer to the fitting
socket and to the pipe end to approximately 1/2"
beyond the socket depth.
c. Apply a second primer coat to the fitting socket.
d. While primer is still wet, apply an even coat of
approved cement to the pipe equal to the depth of
the fitting socket along with an even coat of
approved cement to the fitting socket.
e. Apply a second coat of cement to the pipe.
f. While the cement is still wet, insert the pipe into
the fitting, if possible twist the pipe a 1/4 turn as
you insert it. NOTE: If voids are present,
sufficient cement was not applied and joint could
be defective.
g. Wipe excess cement from the joint removing ring
or beads as it will needlessly soften the pipe.
NOTE: In Canada, CPVC and PVC vent pipe, ttings and cement/
primer must be ULC S636 certi ed.
19
Page 20
3 Generalventing
Polypropylene
This product has been approved for use with polypropylene
venting from the manufacturers listed in Table 3H.
All terminations must comply with listed options in this
manual and be a single-wall vent offering.
For support and special connections required, see the
manufacturer's instructions. All vent is to conform to standard
diameter and equivalent length requirements established in the
General Venting - Sizing Section.
The vent connector provided with the unit is sized for PVC/
CPVC, polypropylene, or stainless steel venting. No adapter is
required to connect to listed venting options.
Flexible polypropylene
For use of flex pipe, it is recommended to have the vent material
in 32°F or higher ambient space before bending at installation.
No bends should be made to greater than 45° and ONLY
installed in vertical or near vertical installations.
When venting with flexible polypropylene it is acceptable to
increase piping sizes by one vent diameter. Up-sized flexible
polypropylene may be considered as equivalent to one (1) foot
of smaller diameter rigid pipe. Do not exceed the maximum
flexible vent lengths given in Table 3I. When venting with
same diameter flexible and rigid pipe refer to Table 3J for
manufacturer equivalent vent lengths.
Sidewall vent kits
When using the Sidewall Vent Kit (see Table 3B), an adapter
kit provided by the vent manufacturer must be used to
make the final connection. Reference Table 3K for specific
manufacturer's part numbers.
WARNING
WARNING
NOTICE
NOTICE
Use only the manufacturers and vent
adapters listed. DO NOT mix vent systems
of different types or manufacturers. Failure
to comply could result in severe personal
injury, death, or substantial property
damage.
Insulation should not be used on
polypropylene venting materials. The use
of insulation will cause increased vent wall
temperatures, which could result in vent
pipe failure.
All vent connections MUST be secured by
the vent manufacturer's joint connector.
Installation of a polypropylene system
should adhere to the manufacturer's
installation instructions supplied with the
vent system.
Installations must comply with applicable
national, state, and local codes. For Canadian
installation, polypropylene vent must be
listed as a ULC S636 approved system.
Table 3I Flexible Polypropylene Maximum Vent Lengths
Maximum Flexible Vent Length
Model
2 inch Flex3 inch Flex4 inch Flex
55
85
110
155--
199--
285--
40 ft
(80 ft 2 inch)*
25 ft
(50 ft 2 inch)*
20 ft
(40 ft 2 inch)*
*Length shown in parentheses reflects the maximum rigid pipe
vent length.
NOTE: Maximum vent lengths are based on 2 foot rigid
equivalent. Reference Table 3J for specific manufacturer
equivalent lengths.
Table 3J Flexible Polypropylene Equivalent Length
Manufacturer
DuraVent2 ft2 ft2 ft
Centrotherm2 ft2 ft2.7 ft
Heat Fab2.5 ft2.3 ft2.7 ft
Z-Flex3.2 ft2 ft2 ft
Table 3K Sidewall Vent Kit Adapters
Manufacturer
DuraVent(2", 3", 4")(2,3,4)PPS-HLKL
Centrotherm(2", 3", 4")ISLTK0(2,3,4)
Z-Flex(2", 3", 4")2ZDHKLPA(2,3,4)
(Rigid Equivalent)
50 ft
(100 ft 3 inch)*
50 ft
(100 ft 3 inch)*
50 ft
(100 ft 3 inch)*
50 ft
(100 ft 3 inch)*
50 ft
(100 ft 3 inch)*
25 ft
(50 ft 3 inch)*
100 ft
(100 ft 3 inch)*
100 ft
(100 ft 3 inch)*
100 ft
(100 ft 3 inch)*
100 ft
(100 ft 3 inch)*
100 ft
(100 ft 3 inch)*
50 ft
(100 ft 3 inch)*
Flexible Vent Diameter
2 inch3 inch4 inch
Vent DiameterSidewall Adapter
20
Page 21
3 Generalventing (continued)
Stainless steel vent
This product has been approved for use with stainless
steel venting from the manufacturers listed in Table 3L.
The vent connector provided with the unit is sized for
stainless steel venting. No additional vent adapter is
needed to connect to the unit.
All terminations must comply with listed options in
this manual and be a single-wall vent offering. See
Table 3M for specific manufacturer terminations.
For support and special connections required, see the
manufacturer's instructions. All vent is to conform to
standard diameter and equivalent length requirements
established.
WARNING
NOTICE
NOTICE
Installation & Operation Manual
Use only the materials, vent systems, and terminations
from listed manufacturers. DO NOT mix vent
systems of different types or manufacturers. Failure
to comply could result in severe personal injury,
death, or substantial property damage.
Installations must comply with applicable national,
state, and local codes. Stainless steel vent systems
must be listed as a UL-1738 approved system for the
United States and a ULC S636 approved system for
Canada.
Installation of a stainless steel vent system should
adhere to the stainless steel vent manufacturer's
installation instructions supplied with the vent
system.
FasNSeal Flex
Use of FasNSeal Flex smooth inner wall vent is to
be used in vertical or near vertical sections ONLY.
Taking precaution to ensure no sagging occurs of the
vent system. Connect to the FasNSeal rigid vent using
specially designed adapters and sealing method. See
manufacturer's instructions.
Table 3L Approved Stainless Steel Vent
ManufacturerModel
DuraVentFasNSeal / FasNSeal Flex
Heat FabSaf-T Vent EZ Seal
Z-FlexZ-Vent
NOTE: DuraVent FasNSeal Flex stainless steel vent
may be used as an equivalent substitute for rigid pipe.
*To the best of our knowledge, manufacturer part numbers are accurate
as of the date of publication, but may be subject to change. Contact the
manufacturer to verify specific terminations.
21
Page 22
4 Sidewall directventing
Vent/air termination – sidewall
Installation & Operation Manual
WARNING
Follow instructions below when
determining vent location to avoid
possibility of severe personal injury,
death, or substantial property damage.
WARNING
A gas vent extending through an exterior
wall shall not terminate adjacent to a wall
or below building extensions such as eaves,
parapets, balconies, or decks. Failure to
comply could result in severe personal
injury, death, or substantial property
damage.
WARNING
Sidewall vent and air intake terminations
must terminate in the same pressure zone.
Determine location
Reference the General Venting - Air Intake / Vent Location
Section of this manual for required clearances and guidelines
on locating vent and air intake terminations.
When using a sidewall termination, follow installation
instructions and maintain clearances as shown in this section:
1. Air inlet must terminate at least 12 inches above grade
or snow line, and at least 12 inches below the vent
termination.
2. For installations where the vent terminates in an elbow
outside the building, the vent piping must not extend more
than 24 inches vertically (FIG. 4-1). To prevent blockages
due to freezing condensate, the recommended maximum
length of vent piping is 15 inches.
WARNING
All vent pipes and air inlets must terminate
at the same height to avoid recirculation
of flue products and the possibility of
severe personal injury, death, or substantial
property damage.
Sidewall vent kit
When venting out a sidewall using PVC, CPVC, or polypropylene
vent material, an optional sidewall vent termination kit can be
ordered (FIG. 4-5A). See General Venting Section for kit
numbers.
Field supplied fittings
The air piping must terminate in a down-turned elbow. This
arrangement avoids recirculation of flue products into the
combustion air stream. The vent piping must terminate in an
elbow pointed outward or away from the air inlet, as shown in
FIG. 4-5B.
Figure 4-1 Field Supplied Fittings with Vent Termination
Elbow
FACTORY PROVIDED
BIRD SCREEN
24” MAX
Do not exceed the maximum lengths of the outside vent
piping. Excessive length exposed to the low temperatures
could cause freezing of condensate in the vent pipe,
resulting in potential boiler shutdown.
3. Vent piping must terminate no closer than 12 inches
below a roof overhand, or 12 inches below or horizontally
from any door, window, or other gravity air inlet (FIG.
4-2).
4. Vent must terminate at least 3 feet above any forced air
intake within 10 feet (FIG. 4-3).
Multiple vent / air terminations
Multiple vent terminations must be placed to maintain a
minimum clearance of 12 inches (U.S. installations) between
the edge of the air inlet and adjacent vent outlet (FIG. 4-4).
For Canadian installations, provide clearances required by
CSA B149.1 Installation Code.
The air inlet of a Knight Fire Tube boiler is part of a direct
vent connection. It is not classified as a forced air intake with
regard to spacing from adjacent boiler vents.
FACTORY PROVIDED
BIRD SCREEN
Figure 4-2 Clearance to Gravity Air Inlets (Field Supplied
Fittings Shown)
12”
MIN.
BIRD
SCREEN
(TYPICAL)
12”
MIN.
12”
MIN.
22
Page 23
4 Sidewall direct venting (continued)
Vent/air termination – sidewall
Installation & Operation Manual
Figure 4-3 Clearance to Forced Air Inlets (Sidewall
Vent Kit Shown)
Figure 4-5B Field Supplied Fittings with Vent Termination
Coupling
FROM BOILER
VENT PIPE
CONNECTION
TO BOILER
INTAKE AIR
CONNECTION
BIRD
SCREEN
GRADE OR
SNOW LINE
ALTERNATE VENTING ARRANGEMENT
(IF SPACE PERMITS)
COUPLING
12” MIN
BIRD SCREEN
12”
MIN
Figure 4-5C Typical Stainless Steel Sidewall Termination
with Field Supplied Fittings and Hood Intake
TO BOILER
INTAKE AIR
CONNECTION
BIRD SCREEN
12" MIN.
24” MAX.
Figure 4-5A Sidewall Vent Kit
TO BOILER
INTAKE AIR
CONNECTION
FROM BOILER
VENT PIPE
CONNECTION
POSSIBLE ORIENTATIONS
VENT / AIR
TERMINATION
GRADE OR
SNOW LINE
12"
MIN
TO
OVERHANG
12"
MIN
FROM BOILER
VENT PIPE
CONNECTION
12" MIN.
GRADE OR
SNOW LINE
23
Page 24
4 Sidewall direct venting
Installation & Operation Manual
Vent/air termination – sidewall
Prepare wall penetrations - Sidewall
vent kit
The PVC/CPVC and polypropylene sidewall vent terminations
are designed to accommodate any wall thickness of standard
construction.
Install the sidewall vent kit as shown in FIG. 4-6 and per the
directions found in this manual.
1. Use the factory supplied wall plate as a template to locate
the vent and air intake holes and mounting holes.
2. Cut a hole for the air pipe. Size the air pipe hole as
close as desired to the air pipe outside diameter.
3. Cut a hole for the vent pipe. For either combustible
or noncombustible construction, size the vent pipe
hole with at least a 1/2 inch clearance around the
vent pipe outer diameter:
• 3½ inch hole for 2 inch vent pipe
• 4½ inch hole for 3 inch vent pipe
• 5½ inch hole for 4 inch vent pipe
4. Drill 3/16" diameter holes for inserting the plastic anchors
into the wall.
5. Polypropylene Venting: Install the vent and air intake
sidewall adapters listed in the General Venting Polypropylene Section into the vent plate. Slide the
sidewall retaining bracket down the sidewall adapters
flush to the vent plate.
PVC/CPVC Venting: Install the vent and air intake
piping through the wall into the vent plate openings.
Use RTV silicone sealant to seal the air pipe. Use the
cement/primer listed in the General Venting - PVC/
CPVC Section to seal the vent pipe.
6. Mount and secure the vent plate to the wall, using stainless
steel screws.
7. Seal all gaps between the pipes and wall. Seal around the
plate to the wall assuring no air gaps.
8. Assemble the vent cap to the vent plate.
Insert the stainless steel screws into the vent
cap screw hole openings and securely attach the vent cap
to the vent plate.
7. Seal all wall cavities and exterior openings.
2. Cut a hole for the vent pipe. For either combustible
or noncombustible construction, size the vent pipe
hole with at least a 1/2 inch clearance around the vent
pipe outer diameter:
• 3½ inch hole for 2 inch vent pipe
• 4½ inch hole for 3 inch vent pipe
• 5½ inch hole for 4 inch vent pipe
3. Insert a galvanized metal thimble in the vent pipe
hole as shown in FIG. 4-7.
4. For installations using a vent elbow termination, use
the sidewall termination plate as a template for correct
location of hole centers.
5. Follow all local codes for isolation of vent pipe when
passing through floors or walls.
6. Seal exterior openings thoroughly with exterior caulk.
Figure 4-6 Sidewall Vent Kit Assembly
PVC/CPVC PIPE OR
POLYPROPYLENE ADAPTER
(AIR)
WALL
PVC/CPVC PIPE OR
POLYPROPYLENE ADAPTER
(VENT)
GALVANIZED
THIMBLE
PLATE
IMG00085
SIDEWALL
RETAINING
PLATE
VENT
PLATE
VENT
CAP
Figure 4-7 Field Supplied Termination Assembly
AIR PIPING
VENT PIPING
ELBOW
BIRD SCREEN
Prepare wall penetrations - Field supplied
fittings
PVC/CPVC and polypropylene sidewall vent terminations
are designed to accommodate any wall thickness of standard
construction. Stainless steel terminations are designed to
penetrate a wall with a thickness up to 9.25 inches of standard
construction.
1. Cut a hole for the air pipe. Size the air pipe hole as
close as desired to the air pipe outside diameter.
24
GALVANIZED
THIMBLE
SIDEWALL
TERMINATION PLATE
ELBOW
BIRD SCREEN
Page 25
Installation & Operation Manual
4 Sidewall direct venting (continued)
Sidewall termination – optional concentric vent
Description and usage
Lochinvar offers optional concentric combustion air and vent pipe termination kits (see the General Venting Section for part
numbers). Both combustion air and vent pipes must attach to the termination kit. The termination kits must terminate outside
the structure and must be installed as described in the General Venting - Air Intake / Vent Location Section, and as shown below
in FIG. 4-8.
The required combustion air and vent pipe materials are listed in the General Venting - PVC/CPVC Section of this manual.
Concentric sidewall installation
1. Cut one (1) hole into the structure to install the
termination kit.
• 5 inch diameter for 2 inch concentric vent kit
• 4 inch diameter for 3 inch concentric vent kit
• 7 inch diameter for 4 inch concentric vent kit
2. Partially assemble the concentric vent termination kit.
Clean and cement using the procedures found in these
instructions (FIG.'s 4-9A and 4-9B).
a. Cement the Y concentric fitting to the larger kit pipe.
b. Cement the rain cap to the smaller diameter kit pipe.
Figure 4-8 Concentric Sidewall Termination
Figure 4-9A 2 and 3 Inch Concentric Vent Kits (reference
the General Venting Section)
Figure 4-9B 4 Inch Concentric Vent Kit (reference the
General Venting Section)
RAIN CAP
6" (152 MM) TO 4" (102 MM) REDUCER
6" (152 MM) DIA.
"Y" CONCENTRIC
FITTING
6" (152 MM) DIA.
"FLEXIBLE" PIPE
COUPLING
6" (152 MM) DIA.
4" (102 MM) DIA.
25
Page 26
Installation & Operation Manual
4 Sidewall direct venting
Sidewall termination – optional concentric vent
Figure 4-10A 2 and 3 Inch Concentric Vent Dimensions
(reference the General Venting Section)
NOTICE
Instead of cementing the smaller pipe
to the rain cap, a field-supplied stainless
steel screw may be used to secure the
two (2) components together when field
disassembly is desired for cleaning (see
FIG. 4-11).
WARNING
When using the alternate screw assembly
method, drill a clearance hole in the rain
cap and a pilot hole in the vent pipe for
the screw size being used. Failure to
drill adequate holes may cause cracking of
PVC components, allowing combustion
products to be recirculated. Failure to
follow this warning could result in personal
injury or death.
WARNING
Do not operate the appliance with the rain
cap removed or recirculation of combustion
products may occur. Water may also collect
inside the larger combustion air pipe and
flow to the burner enclosure. Failure to
follow this warning could result in product
damage or improper operation, personal
injury, or death.
Figure 4-11 Rain Cap to Vent Pipe Alternate Assembly
Figure 4-10B 4 Inch Concentric Vent Dimensions
(reference the General Venting Section)
(152 MM)
"B" DIA.
"G"
(76 MM)
(537 MM)
3"
"H" DIA.
(254 MM) (194 MM)
"D"
"F"
(168 MM)
(76 MM)
"C" DIA.
"B" DIA. PVC
VENT / EXHAUST
ABC DEF GH
60"4"6"21 1/8"10"7 5/8"3"6 5/8"
(1524 MM)
(102 MM)
3. Install the Y concentric fitting and pipe assembly through
the structure’s hole from an inside wall.
NOTICE
Do not allow insulation or other materials to
accumulate inside the pipe assembly when
installing through the hole.
4. Install the rain cap and small diameter pipe assembly into
the Y concentric fitting and large pipe assembly from an
outside wall. Ensure small diameter pipe is bottomed
and cemented in the Y concentric fitting for 2 and 3 inch
installations and fastened tightly into the rubber adapter for
4 inch installations.
5. Secure the assembly to the structure as shown in FIG. 4-12
using field-supplied metal strapping or equivalent support
material.
NOTICE
NOTICE
Ensure termination location clearance
dimensions are as shown in FIG. 4-8.
If assembly needs to be extended to allow
sidewall thickness requirement, the two (2)
pipes supplied in the kit may be replaced
by using the same diameter, field-supplied
SDR-26 PVC (D2241) pipe for 2 and 3 inch
kits and standard Schedule 40 PVC for 4
inch. Do not exceed dimension "D" more
than 60 inches (see FIG.'s 4-10A and 4-10B).
"E"
26
NOTICE
If assembly depth needs to be reduced,
dimension D can be as short as possible.
Page 27
Installation & Operation Manual
4 Sidewall direct venting (continued)
Sidewall termination – optional concentric vent
Figure 4-12 Concentric Vent Sidewall Attachment
NOTE: 100140480 shown for illustration purposes.
CAUTION
6. Cement appliance combustion air and vent pipes to
the concentric vent termination assembly. See FIG.
4-12 for proper pipe attachment.
7. Operate the appliance one (1) heat cycle to ensure
combustion air and vent pipes are properly connected
to the concentric vent termination connections.
DO NOT use field-supplied couplings
to extend pipes. Airflow restriction
will occur and may cause intermittent
operation.
Multi-venting sidewall terminations
When two (2) or more direct vent appliances are vented near
each other, each appliance must be individually vented (see
FIG. 4-13). NEVER common vent or breach vent this appliance.
When two (2) or more direct vent appliances are vented near
each other, two (2) vent terminations may be installed as shown
in FIG. 4-13. It is important that vent terminations be made as
shown to avoid recirculation of flue gases.
12"
MINIMUM
VENT
COMBUSTION
AIR
Figure 4-13 Concentric Vent and Combustion Air Termination
27
Page 28
5 Vertical direct venting
Installation & Operation Manual
Vent/air termination – vertical
WARNING
Determine location
Reference the General Venting - Air Intake / Vent Location
Section of this manual for required clearances and guidelines
on locating vent and air intake terminations.
When using vertical termination methods, follow installation
instructions and maintain clearances as shown in this section.
1. The air intake must terminate in a down-turned 180°
return pipe with a bird screen installed.
2. The vent pipe must terminate in either an up-turned
coupling with a bird screen installed or a stainless steel
rain cap.
3. The air intake must terminate at least 6 inches above the
roof or snow line.
4. The vent must terminate at least 3 feet (36 inches) above
the highest place in which the vent penetrates the roof
and at least 2 feet (24 inches) above any part of a building
within 10 horizontal feet.
Follow instructions below when
determining vent location to avoid
possibility of severe personal injury, death
or substantial property damage.
Figure 5-1A PVC/CPVC/Polypropylene Vertical
Termination of Air and Vent
ALTERNATE INTAKE LOCATIONS:
INTAKE PIPES MAY BE LOCATED
ANYWHERE WITHIN 24” OF VENT
PIPE
BIRD SCREEN
(TYPICAL)
VENT
COUPLING
(FIELD SUPPLIED)
VENT OUTLET
12” MINIMUM
ABOVE AIR INLET
COMBUSTION
AIR
6” MINIMUM
ABOVE ROOF /
SNOW LINE
Figure 5-1B Stainless Steel Vertical Termination of Air
and Vent
ALTERNATE INTAKE LOCATIONS:
INTAKE PIPES MAY BE LOCATED
ANYWHERE WITHIN 24” (610 MM)
OF VENT PIPE
VENT
5. The top of the PVC/CPVC or polypropylene vent
coupling must be at least 1 foot (12 inches) above the air
intake.
The discharge opening of a stainless steel coupling or
rain cap termination must maintain at least 3 feet (36
inches) above the air inlet.
6. The air inlet pipe and vent pipe can be located in any
desired position on the roof, but must always be no
further than 2 feet (24 inches) apart. This placement
avoids recirculation of flue products into the combustion
air stream.
7. Do not extend exposed vent pipe outside of building
more than shown in this document. Condensate could
freeze and block vent pipe.
WARNING
Rooftop vent and air inlet terminations
must terminate in the same pressure
zone, unless vertical vent sidewall air is
set up as shown in the General Venting Vertical Vent, Sidewall Air Section.
6” (152 MM) MINIMUM
ABOVE ROOF /
SNOW LINE
COMBUSTION
AIR
Multiple vent / air terminations
Multiple vent terminations must be placed to maintain a
minimum clearance of 12 inches (U.S. installations) between
the edge of the air inlet and adjacent vent outlet (FIG. 5-2A).
For Canadian installations, provide clearances required by
CSA B149.1 Installation Code.
The air inlet of a Knight Fire Tube boiler is part of a direct
vent connection. It is not classified as a forced air intake with
regard to spacing from adjacent boiler vents.
28
Page 29
5 Vertical direct venting (continued)
Vent/air termination – vertical
Installation & Operation Manual
Figure 5-2A Vertical Terminations with Multiple Boilers
12” MINIMUM (STAINLESS STEEL 36”
MINIMUM) VERTICALLY FROM VENT
OUTLET TO ANY AIR INLET
Figure 5-2A Alternate Vertical Terminations with
Multiple Boilers
12” MINIMUM (STAINLESS STEEL 36”
MINIMUM) VERTICALLY FROM VENT
OUTLET TO ANY AIR INLET
Existing vent as a chase
Follow all existing termination and clearance requirements and
allowable pipe lengths. Use only approved venting materials
listed in the General Venting Section of this manual.
Figure 5-3 Existing Vent as a Chase
AIR INLET
CAP
FLUE EXHAUST
SEAL
EXISTING
SEAL
FLUE OUTLET
WARNING
Terminate all vent pipes at the same height
and all air pipes at the same height to
avoid possibility of severe personal injury,
death, or substantial property damage.
Prepare roof penetrations
1. Cut a hole for the air pipe. Size the air pipe hole as close
as desired to the air pipe outside diameter.
2. Cut a hole for the vent pipe. For either combustible
or noncombustible construction, size the vent pipe hole
with at least a 1/2 inch clearance around the vent pipe
outer diameter:
• 3 1/2 inch hole for 2 inch vent pipe
• 4 1/2 inch hole for 3 inch vent pipe
• 5 1/2 inch hole for 4 inch vent pipe
3. Insert a galvanized metal thimble in the vent pipe hole.
4. Maintain clearances as described in both the General
Venting and the Vertical Direct Venting sections of this
manual.
5. Follow all local codes for isolation of vent pipe when
passing through floors, ceilings, and roofs.
6. Provide flashing and sealing boots sized for the vent and
air pipe.
29
Page 30
Installation & Operation Manual
5 Vertical direct venting
Vertical termination – optional concentric vent
Lochinvar offers an optional concentric combustion air
and vent pipe termination kit. Both combustion air and
vent pipes must attach to the termination kit. The kit must
terminate outside the structure and must be installed as
shown in this section.
Field supplied pipe and fittings are required to complete the
installation. The required combustion vent pipe and fittings
are listed in the General Venting Section of this manual.
Vertical termination installation
Maintain clearances as described in both the General Venting
and the Vertical Direct Venting sections of this manual,
where applicable.
1. Cut one (1) hole (5 inch diameter for 2 inch installations,
4 inch diameter for 3 inch installations, or 7 inch
diameter for 4 inch installations) into the structure to
install the termination kit.
2. Partially assemble the concentric vent termination kit.
Clean and cement following the cleaning procedures in
these instructions.
a. Cement the Y concentric fitting to the larger
diameter kit pipe.
b. Cement rain cap to the smaller diameter kit pipe.
See the Sidewall Direct Venting - Optional Concentric
Vent Section for details.
3. Install the Y concentric fitting pipe assembly up through
the structure’s hole and field supplied roof boot/flashing.
4. Secure the assembly to the roof structure as shown
in FIG. 5-4 using field supplied metal strapping or
equivalent support material.
5. Cement the appliance combustion air and vent pipes to
the concentric vent termination assembly. See FIG. 5-4
for proper pipe attachment.
6. Operate the appliance through one (1) heat cycle to ensure
combustion air and vent pipes are properly connected to
the concentric vent termination connections.
NOTICE
WARNING
30
Instead of cementing the smaller pipe
to the rain cap, a field supplied stainless
steel screw may be used to secure the
two (2) components together when field
disassembly is desired for cleaning.
When using the alternate screw assembly
method, drill a clearance hole in the rain
cap and a pilot hole in the vent pipe for
the screw size being used. Failure to drill
adequate holes may cause cracking of
PVC components, allowing combustion
products to be recirculated. Failure
to follow this warning could result in
personal injury or death.
Figure 5-4 Concentric Vent Vertical Installation
WARNING
NOTICE
NOTICE
NOTICE
CAUTION
Do not operate the appliance with the rain
cap removed or recirculation of combustion
products may occur. Water may also
collect inside the larger combustion air
pipe and flow to the burner enclosure.
Failure to follow this warning could result
in product damage or improper operation,
personal injury, or death.
Do not allow insulation or other materials
to accumulate inside the pipe assembly
when installing through the hole.
Ensure termination height is above the
roof surface or anticipated snow level (12
inches in U.S.A. or 18 inches in Canada) as
shown in FIG. 5-4.
If assembly is too short to meet height
requirement, the two (2) pipes supplied in
the kit may be replaced by using the same
diameter, field supplied SDR-26 PVC
(D2241) pipe for 100140480/100140485
and standard schedule 40 PVC for 4 inch.
Do not extend dimension "D" more than
60 inches. Refer to the Sidewall Direct
Venting - Optional Concentric Vent
Section.
DO NOT use field-supplied couplings
to extend pipes. Airflow restriction will
occur.
Page 31
5 Vertical direct venting (continued)
Vertical termination – Concentric vent kit
Figure 5-5 Do Not Install U-Bend to Rain Cap
Multi-venting vertical terminations
Installation & Operation Manual
When two (2) or more direct vent appliances are vented
near each other, each appliance must be individually vented
(see FIG. 5-6). NEVER common vent or breach vent this
appliance. When two (2) or more direct vent appliances
are vented near each other, two (2) vent terminations may
be installed as shown in FIG. 5-6. It is important that vent
terminations be made as shown to avoid recirculation of flue
gases.
This appliance may be installed with a concentric vent
arrangement where the vent pipe is routed through an
existing unused venting system; or by using the existing
unused venting system as a chase for vent and combustion
air routing.
Concentric venting arrangement
The venting is to be vertical through the roof. The annular
space between the O.D. of the vent pipe and the I.D. of the
existing unused venting system is utilized for the combustion
air source.
The minimum size of the existing vent system required to
achieve enough annular space for combustion air can be
found in Table 5A below.
The upper and lower termination as well as any other unsealed
joints in the existing vent system must be sealed to ensure that
all combustion air is drawn from under the vent cap as shown
in FIG.’s 5-7A and 5-7B.
Approved venting materials must be used as specified in the
General Venting Section of this manual.
Follow all vent / air termination and clearance requirements
per this section to the appropriate example. Installation must
comply with local requirements and with the National Fuel
Gas Code.
The maximum allowable equivalent vent and air intake
lengths for this venting arrangement are to be determined
from the General Venting Section.
If an existing unused venting system is converted for use
with this method of concentric venting, the installer must
ensure that the existing venting system is clean and free
from particulate contamination that will harm this appliance
and cause increased nuisance calls or maintenance. See the
Corrosive Contaminants and Sources table in the Determine
Boiler Location Section for a list of corrosive contaminants
and sources.
Two example scenarios of a concentric venting arrangement
are shown for illustrative purposes in FIG.’s 5-7A and 5-7B.
The Knight Fire Tube is designed to function in a closed loop
pressurized system not less than 12 psi (Non-metallic system
piping must have an oxygen barrier to be considered a closed
loop). A temperature and pressure gauge is included to
monitor system pressure and outlet temperature and should
be located on the boiler outlet.
It is important to note that the boiler has a minimal
amount of pressure drop and must be figured in when
sizing the circulators. Each boiler installation must have
an air elimination device, which will remove air from
the system. Install the boiler so the gas ignition system
components are protected from water (dripping, spraying,
etc.) during appliance operation for basic service of circulator
replacement, valves, and others.
Observe a minimum of 1/4 inch (6 mm) clearance around all
un-insulated hot water pipes when openings around the
pipes are not protected by non-combustible materials.
Low water cutoff device
On a boiler installed above radiation level, some states and
local codes require a low water cutoff device at the time of
installation.
Chilled water system
If the boiler supplies hot water to heating coils in air handler
units, flow control valves or other devices must be installed to
prevent gravity circulation of heater water in the coils during
the cooling cycle. A chilled water medium must be piped in
parallel with the heater.
Freeze protection
Freeze protection for new or existing systems must use
glycol that is specially formulated for this purpose. This
includes inhibitors, which prevent the glycol from attacking
the metallic system components. Make certain to check that
the system fluid is correct for the glycol concentration and
inhibitor level. The system should be tested at least once
a year and as recommended by the producer of the glycol
solution. Allowance should be made for the expansion of the
glycol solution in the system piping.
WARNING
General piping information
IMPORTANT
Basic steps are listed in this section along with illustrations on
the following pages (FIG.’s 6-2 thru 6-12), which will guide
you through the installation of the Knight Fire Tube boiler
with either zone valves or circulation pumps.
Use only inhibited propylene glycol
solutions, which are specifically formulated
for hydronic systems. Ethylene glycol is
toxic and can attack gaskets and seals used
in hydronic systems.
All boiler piping must contain an
oxygen barrier. This will help prevent
any excess oxygen from entering the
system.
Installation & Operation Manual
NOTICE
1. Connect the system return marked “Inlet”.
2. Connect the system supply marked “Outlet”.
3. Install purge and balance valve or shutoff valve and drain
on system return to purge air out of each zone.
4. Install a backflow preventer on the cold feed make-up
water line.
5. Install a pressure reducing valve on the cold feed makeup water line, (15 psi nominal). Check temperature and
pressure gauge (shipped separately), which should read a
minimum pressure of 12 psi.
6. Install a circulator as shown on the piping diagrams in this
section. Make sure the circulator is properly sized for the
system and friction loss. Refer to the graph in FIG. 6-1 for
pressure drop through the Knight Fire Tube boiler heat
exchanger.
7. Install an expansion tank on the system supply. Consult the
tank manufacturer’s instructions for specific information
relating to tank installation. Size the expansion tank for the
required system volume and capacity.
8. Install an air elimination device on the system supply.
9. Install a drain valve at the lowest point of the system.
NOTE: The boiler cannot be drained completely of water
without purging the unit with an air pressure of 15 psi.
10. This appliance is supplied with a relief valve sized in
accordance with ASME Boiler and Pressure Vessel Code,
Section IV (“Heating Boilers”). The relief valve is installed
at the factory on the left side of the boiler. Pipe the
discharge of the safety relief valve to prevent injury in
the event of pressure relief. Pipe the discharge to a drain.
Provide piping that is the same size as the safety relief valve
outlet. Never block the outlet of the safety relief valve.
11. Install a field supplied strainer to prevent damage to the
heat exchanger caused by debris entering from the system
piping. When installing in a pre-existing system, a strainer/
filter capable of removing debris left in the system is
recommended.
SMART SYSTEM / Multi-temperature loop
control option
The Knight Fire Tube boiler is capable of producing up to
three (3) set point temperatures to meet different space heating
demands. When using more than one temperature demand
it is necessary to protect the lower temperature loop from
overheating. To help aid with this protection, Lochinvar offers
the Multi-Temperature Loop Control Board Kit.
CAUTION
*These illustrations are meant to show
system piping concept only, the installer is
responsible for all equipment and detailing
required by local codes.
It is the responsibility of the installer to
protect the loops with lower temperature
requirements from higher temperatures
that may be required by other loops.
33
Page 34
6 Hydronic piping
Near boiler piping components
1. Boiler system piping:
Boiler system piping MUST be sized per the pipe
requirements listed in Table 6A. Reducing the pipe size
can restrict the flow rate through the boiler, causing
inadvertent high limit shutdowns and poor system
performance.
2. Boiler circulating pump:
A Grundfos UPM series variable speed pump will be
provided by the factory as the boiler circulation pump.
When connected to the low voltage board, the Knight
Fire Tube boiler will control the pump via a 0 - 10 VDC
signal. In case the pump does not receive a signal from
the control (cable break), it will run at maximum speed.
Factory supplied pump wiring - brown (+) blue (-).
3. Domestic hot water circulating pump:
Field supplied. The pump MUST be sized to meet
the specified minimum flow requirements listed in
Table 6A. Consult the indirect water heater operating
guide to determine flow characteristics for the selected
product used.
4. Boiler isolation valves:
Field supplied. Full port ball valves are required.
Failure to use full port ball valves could result in a
restricted flow rate through the boiler.
5. Check valves:
Field supplied. Check valves are recommended for
installation as shown in FIG.’s 6-2 thru 6-12. Failure to
install check valves could result in a reverse flow
condition during pump(s) off cycle.
6. Domestic indirect hot water isolation valves:
Field supplied. Full port ball valves are required. Failure
to use full port ball valves could result in a restricted flow
rate through the boiler.
7. Anti-scald mixing valve:
Field supplied. An anti-scald mixing valve is
recommended when storing domestic hot water above
115°F.
8. Unions:
Field supplied. Recommended for unit serviceability.
9. Temperature and pressure gauge:
Factory installed.
10. Pressure relief valve:
Factory installed. The pressure relief valve is sized to
ASME specifications.
Installation & Operation Manual
12. System temperature sensor:
Lochinvar supplies a system temperature sensor.
The sensor is to be installed in the heating loop
downstream from the boiler hot water piping and
heating loop junction. Typically the sensor will be
located far enough downstream to sense system diluted
water temperature.
13. Indirect water heaters:
The Knight Fire Tube boiler may be piped to an indirect
water heater to heat domestic hot water with the space heat
transfer medium. As depicted in FIG.'s 6-2 thru 6-12
there are two options when utilizing an indirect water
heater.
A. The space heating piping will branch off to flow the
space heat transfer medium through a single wall
heat exchanger coil inside the indirect water heater.
B. The indirect water heater is connected to the system
supply piping. A pump controlled by the Knight
Fire Tube boiler’s control will regulate the flow of
water through the indirect water heater. The indirect
water heater’s temperature will be regulated by the
Knight Fire Tube boiler’s control.
The Knight Fire Tube boiler is pre-configured to control
the operation of the DHW pump with Domestic Hot
Water Prioritization programming. The DHW
programming is designed to control and balance the
space heating demand by switching between DHW and
space heating.
Lochinvar offers the Squire which is a series of indirect
water heaters. The Squire features a stainless steel vessel
with a single wall stainless steel heat exchanger.
CAUTION
WARNING
14. Water Meter:
Field supplied. A water meter to monitor makeup water is
recommended. Makeup water volume should not exceed
5% of total system per year.
It is up to the installer to ensure the
minimum system flow is not less than the
minimum boiler flow at any time.
The National Standard Plumbing Code, the
National Plumbing Code of Canada and the
Uniform Plumbing Code limit the pressure
of the heat transfer fluid to less than the
minimum working pressure of the potable
water system up to 30 psi maximum. Also,
the heat transfer fluid must be water or
other non-toxic fluid having a toxicity of
Class 1, as listed in Clinical Toxicology of
Commercial Products, 5th Edition.
11. Boiler purge valve:
Field supplied. The boiler purge valve is used to
remove entrapped air from the heat exchanger during
start-up.
34
15. Y-Strainer:
Field supplied. Install a Y-strainer or equivalent multi purpose strainer just before the boiler pump at the inlet
of the heat exchanger. This item is used to remove system
debris from older hydronic systems and to protect newer
systems.
Page 35
6 Hydronic piping (continued)
Figure 6-1 Pressure Drop vs. Flow
Installation & Operation Manual
Table 6A - Boiler Flow Requirements
Temperature Rise and Head Loss Based on Boiler Output in Btu/hr
Figure 6-2 Single Boiler - Single Temperature with Zone Valves - DHW Priority
ZONE #1
WATER
METER
MAKE UP
WATER
PRESSURE
REDUCING VALVE
BACKFLOW
PREVENTER
SYSTEM SUPPLY SENSOR
AIR SEPARATOR
BALL VALVE
(TYPICAL)
DRAIN POINT
(TYPICAL)
BOILER
CIRCULATOR
PRESSURE
GAUGE
SYSTEM
CIRCULATOR
EXPANSION
TANK
Y-STRAINER
ZONE #2ZONE #3ZONE #4
ZONE VALVES
(TYPICAL)
DIFFERENTIAL
PRESSURE BYPASS
VALVE (IF USED)
MAY SUBSTITUTE LOW LOSS HEADER
NOT TO EXCEED 4 PIPE DIA OR MAX. OF 12" APART
HOT
WATER
OUT
FLOW CHECK
VALVE
DOMESTIC
HOT WATER
CIRCULATOR
ANTI-SCALD
MIXING VALVE
COLD
WATERIN
NOTICE
36
FLOW CHECK
VALVE
BALL VALVE
(TYPICAL)
PRESSURE
E
RELIEF
VALVE
TEMPERATURE /PRESSURE GAUGE
E
UNION
(TYPICAL)
DRAIN POINT
(TYPICAL)
INDIRECT
DHW TANK
INDIRECT DHW
TANK
DIR #2000507794 00
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
Page 37
Installation & Operation Manual
/ESS
A
6 Hydronic piping (continued)
Figure 6-3 Single Boiler - Single Temperature Zoned with Circulators - DHW Priority
ZONE 1
PRESSURE
REDUCING VALVE
BACKFLOW
WATER
METER
PREVENTER
MAKE UP WATER
SYSTEM SUPPLY
AIR SEPARATOR
BALL VALVE
(TYPICAL)
DRAIN POINT
(TYPICAL)
BOILER
CIRCULATOR
SENSOR
VALVE
PRESSURE
GAUGE
ZONE 2ZONE 3ZONE 4
EXPANSION
TANK
MAY SUBSTITUTE LOW LOSS HEADER
NOT TO EXCEED 4 PIPE DIA OR MAX. OF 12" APART
Y-STRAINER
DOMESTIC
HOT WATER
CIRCULATOR
ANTI-SCALD
MIXING VALVE
FLOW CHECK
VALVE
(TYPICAL)
ZONE CIRCULATORS
(TYPICAL)
HOT
WATER
OUT
COLD
WATER
IN
NOTICE
PRESSURE
RELIEF
VALVE
TEMPERATURE /
BALL VALVE
(TYPICAL)
PRESSURE GAUGE
UNION
(TYPICAL)
DRAIN POINT
(TYPICAL)
INDIRECT
D
DHW TANK
DIR #2000507791 00
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
37
Page 38
Installation & Operation Manual
/
SS
A
A
T
T
YPI
A
T
YPI
A
/
SS
A
A P
T
T
YPI
A
6 Hydronic piping
Figure 6-4 Multiple Boilers - Single Temperature Zoned with Circulators - DHW Priority
It is the responsibility of the installer to maintain flow rates based on system piping requirements.
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
Page 39
6 Hydronic piping (continued)
X VAV
/
SS
F
A
P
YPI
A
Figure 6-5 Single Boiler - Multiple Temperatures - DHW Priority
SYSTEM
SUPPLY
SENSOR
Installation & Operation Manual
WATER
METER
MAKE
UP
WATER
BACKFLOW
PREVENTER
AIR SEPARATOR
BALL VALVE
(TYPICAL)
DRAIN POINT
(TYPICAL)
PRESSURE
REDUCING VALVE
PRESSURE
GAUGE
EXPANSION
TEMPERATURE
LOOP #1
TANK
MAY SUBSTITUTE
LOW LOSS HEADER
NOT TO EXCEED 4 PIPE DIA
OR MAX. OF 12" APART
Y-STRAINER
BOILER
CIRCULATOR
FLOW CHECK
VALVE
PRESSURE
RELIEF
EL
E
VALVE
TEMPERATURE
LOOP #2
DOMESTIC
HOT WATER
CIRCULATOR
TEMPERATURE
LOOP #3
WATER
MIXING VALVES
HOT
OUT
(TYPICAL)
ANTI-SCALD
MIXING VALVE
COLD
D
WATER
I
IN
CAUTION
NOTICE
TEMPERATURE /
BALL VALVE
(TYPICAL)
E
PRESSURE GAUGE
UNION
(TYPICAL)
DRAIN POINT
(TYPICAL)
INDIRECT
DHW TANK
INDIRECT DHW
TANK
DIR #2000507796 00
Mixing valves are required for the protection of low temperature loops.
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
Mixing valves are required for the protection of low temperature loops.
It is the responsibility of the installer to maintain flow rates based on system piping requirements.
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
Page 41
Installation & Operation Manual
XVA
V
/
SS
A
T
A
APTTYPIAT
YPI
A
6 Hydronic piping (continued)
Figure 6-7 Single Boiler - Multiple Temperatures with DHW Piped as a Zone
SYSTEM
SUPPLY
SENSOR
WATER
METER
MAKE
UP
WATER
BACKFLOW
PREVENTER
AIR SEPARATOR
BALL VALVE
(TYPICAL)
DRAIN POINT
(TYPICAL)
PRESSURE
REDUCING VALVE
PRESSURE
GAUGE
EXPANSION
TEMPERATURE
LOOP #1
TANK
MAY SUBSTITUTE
LOW LOSS HEADER
NOT TO EXCEED 4 PIPE DIA
OR MAX. OF 12" APART
Y-STRAINER
BOILER
CIRCULATOR
PRESSURE
RELIEF
VALVE
TEMPERATURE
LOOP #2
TEMPERATURE
LOOP #3
MIXING VALVES
(TYPICAL)
DOMESTIC
HOT WATER
CIRCULATOR
FLOW CHECK
VALVE
HOT
WATER
OUT
ANTI-SCALD
MIXING VALVE
COLDWATER
I
IN
CAUTION
NOTICE
NOTICE
TEMPERATURE /
E
DRAIN POINT
(TYPICAL)
INDIRECT
DHW TANK
INDIRECT DHW
TANK
DIR #2000507803 00
BALL VALVE
(TYPICAL)
PRESSURE GAUGE
UNION
(TYPICAL)
YPI
Mixing valves are required for the protection of low temperature loops.
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
Please note that the installer is responsible for ensuring DHW prioritization when piped as a zone.
41
Page 42
6 Hydronic piping
/
SS
T
YPI
A
/
SS
A
T
YPI
A
T
YPI
A
Figure 6-8 Multiple Boilers - Single Temperature Zoned with Valves
It is the responsibility of the installer to maintain flow rates based on system piping requirements.
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
It is the responsibility of the installer to maintain flow rates based on system piping requirements.
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
43
Page 44
Installation & Operation Manual
WA
T
/
SS
A
SS
R
A
6 Hydronic piping
Figure 6-10 Single Boiler - Full Flow - Single Temperature - Zoned with Zone Valves - DHW Priority
ZONE #1
WATER
METER
MAKE UP
WATER
PRESSURE
REDUCING VALVE
BACKFLOW
PREVENTER
SYSTEM SUPPLY SENSOR
AIR SEPARATOR
BALL VALVE
(TYPICAL)
DRAIN POINT
(TYPICAL)
FLOW CHECK
BOILER
CIRCULATOR
ILE
VALVE
U
PRESSURE
GAUGE
SYSTEM
CIRCULATOR
EXPANSION
TANK
E
PRESSURE
RELIEF VALVE
Y-STRAINER
ZONE #2ZONE #3ZONE #4
FLOW CHECK
VALVE
DOMESTIC
HOT WATER
CIRCULATOR
ZONE VALVES
(TYPICAL)
DIFFERENTIAL
PRESSURE BYPASS
VALVE (IF USED)
HOT
WATER
OUT
ANTI-SCALD
MIXING VALVE
COLD
WATERIN
TEMPERATURE /PRESSURE GAUGE
E
NOTICE
BALL VALVE
(TYPICAL)
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
UNION
(TYPICAL)
DRAIN POINT
(TYPICAL)
INDIRECT
DHW TANK
INDIRECT DHW
TANK
DIR #2000507800 00
44
Page 45
Installation & Operation Manual
X VAV
WAT
A
T
6 Hydronic piping (continued)
Figure 6-11 Single Boiler - Full Flow - Single Temperature Zoned with Valves - DHW Piped as a Zone
ZONE 1
PRESSURE
WATER
METER
REDUCING VALVE
BACKFLOW
PREVENTER
PRESSURE
GAUGE
ZONE 2ZONE 3ZONE 4
ZONE VALVES
(TYPICAL)
MAKE UP
WATER
SYSTEM SUPPLY
AIR SEPARATOR
EXPANSION
TANK
BALL VALVE
(TYPICAL)
DRAIN POINT
(TYPICAL)
BOILER
CIRCULATOR
RCUL
FLOW CHECK
VALVE
SENSOR
Y-STRAINER
PRESSURE
RELIEF
VALVE
TEMPERATURE /
PRESSURE GAUGE
DIFFERENTIAL
PRESSURE
BYPASS VALVE
(RECOMMENDED)
HOT
WATER
OUT
ANTI-SCALD
MIXING VALVE
COLDWATERIN
BALL VALVE
(TYPICAL)
UNION
(TYPICAL)
DRAIN POINT
(TYPICAL)
INDIRECT
DHW TANK
INDIRECT DHW
TANK
DIR #2000507805 00
NOTICE
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
45
Page 46
Installation & Operation Manual
W
A
6 Hydronic piping
Figure 6-12 Single Boiler - Full Flow - Single Temperature Zoned with Circulators - DHW Piped as a Zone
ZONE 1
WATER
METER
MAKE UP
WATER
PRESSURE
REDUCING VALVE
BACKFLOW
PREVENTER
SYSTEM SUPPLY SENSOR
AIR SEPARATOR
EXPANSION
TANK
Y-STRA INER
DRAIN POINT
(TYPICAL)
PRESSURE
GAUGE
PRESSURE
RELIEF
VALVE
ZONE 2ZONE 3ZONE 4
DOMESTIC
HOT WATER
CIRCULATOR
BALL VALVE
(TYPICAL)
MIXING VALVE
ANTI-SCALD
FLOW CHECK
VALVE
(TYPICAL)
ZONE CIRCULATORS
(TYPICAL)
HOT
WATER
OUT
COLD
WATER
IN
TEMPERATURE /
PRESSURE GAUGE
BALL VALVE
(TYPICAL)
UNION
(TYPICAL)
DRAIN POINT
(TYPICAL)
INDIRECT
IND
DHW TANK
DIR #2000507790 00
NOTICE
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
46
Page 47
7 Gas connections
Installation & Operation Manual
Connecting gas supply piping
1. Refer to FIG. 7-1 to pipe gas to the boiler.
a. Install ground joint union for servicing, when
required.
b. Install a manual shutoff valve in the gas supply
piping outside boiler jacket when required by local
codes or utility requirements.
c. In Canada – When using manual main shutoff
valves, it must be identified by the installer.
2. Install sediment trap / drip leg.
Figure 7-1 Gas Supply Piping
GAS SUPPLY
UNION
DRIP
LEG
MANUAL
SHUTOFF
VALV E
3. Support piping with hangers, not by the boiler or its
accessories.
WARNING
The gas valve and blower will not support
the weight of the piping. Do not attempt
to support the weight of the piping with
the boiler or its accessories. Failure to
comply could result in severe personal
injury, death, or substantial property
damage.
4. Purge all air from the gas supply piping.
5. Before placing the boiler in operation, check the boiler
and its gas connection for leaks.
a. The appliance must be disconnected from the gas
supply piping system during any pressure testing of
that system at a test pressure in excess of 1/2 PSIG
(3.5 kPa).
b. The appliance must be isolated from the gas supply
piping system by closing a manual shutoff valve
during any pressure testing of the gas supply piping
system at test pressures equal to or less than 1/2 PSIG
(3.5 kPa).
c. The appliance and its gas connection must be leak
tested before placing it in operation.
WARNING
Do not check for gas leaks with an open
flame – use the bubble test. Failure to
use the bubble test or check for gas leaks
can cause severe personal injury, death, or
substantial property damage.
DIR #2000507859 00
6. Use pipe sealing compound compatible with propane
gases. Apply sparingly only to male threads of the pipe
joints so that pipe dope does not block gas flow.
WARNING
Failure to apply pipe sealing compound as
detailed in this manual can result in severe
personal injury, death, or substantial
property damage.
WARNING
Knight Fire Tube boilers are typically
shipped ready to fire on natural gas.
Check boiler rating plate to determine
which fuel the boiler is set for. If set to
natural gas, it may be converted to LP
by installing an LP venturi. In order to
operate on LP gas, an LP venturi MUST
BE installed. Failure to comply could
result in severe personal injury, death, or
substantial property damage.
47
Page 48
7 Gas connections
Installation & Operation Manual
WARNING
Figure 7-2 Inlet Pipe with Backup Wrench
Use two wrenches when tightening gas
piping at boiler (FIG. 7-2), using one
wrench to prevent the boiler gas line
connection from turning. Failure to
support the boiler gas connection pipe to
prevent it from turning could damage gas
line components.
USE BACKUP WRENCH
TO PREVENT PIPE FROM
ROTATING
Natural gas:
Pipe sizing for natural gas
1. Refer to Table 7A for pipe length and diameter. Based on
rated boiler input (divide by 1,000 to obtain cubic feet per
hour).
a. Table 7A is only for natural gas with specific gravity
0.60 inches, with a pressure drop through the gas
piping of 0.3 inches w.c.
b. For additional gas pipe sizing information, refer to
ANSI Z223.1 (or B149.1 for Canadian installations).
Natural gas supply pressure requirements
1. Pressure required at the gas valve inlet pressure port:
• Maximum 14 inches w.c. with no flow (lockup) or
with boiler on.
• Minimum 4 inches w.c. with gas flowing (verify during
boiler startup).
2. Install 100% lockup gas pressure regulator in supply line if
inlet pressure can exceed 14 inches w.c. at any time. Adjust
lockup regulator for 14 inches w.c. maximum.
NOTICE
DIR #2000507867 00
Maximum inlet gas pressure must not
exceed the value specified. Minimum
value listed is for the purposes of input
adjustment.
Propane Gas:
WARNING
Pipe sizing for propane gas
1. Contact gas supplier to size pipes, tanks, and 100% lockup
gas pressure regulator.
Propane Supply Pressure Requirements
1. Adjust propane supply regulator provided by the gas
supplier for 14 inches w.c. maximum pressure.
2. Pressure required at gas valve inlet pressure port:
• Maximum 14 inches w.c. with no flow (lockup) or with
boiler on.
• Minimum 8 inches w.c. with gas flowing (verify during
boiler startup).
Knight Fire Tube boilers are typically
shipped ready to fire on natural gas. Check
boiler rating plate to determine which fuel
the boiler is set for. If set to natural gas,
it may be converted to LP by installing an
LP venturi. In order to operate on LP gas,
an LP venturi MUST BE installed. Failure
to comply could result in severe personal
injury, death, or substantial property
damage.
48
WARNING
Ensure that the high gas pressure regulator
is at least 6 - 10 feet upstream of the
appliance.
Page 49
7 Gas connections (continued)
Table 7A Natural Gas Pipe Size Chart
Capacity of Schedule 40 Metallic Pipe in Cubic Feet of Natural Gas Per Hour
(based on .60 specific gravity, 0.30" w.c. pressure drop)
Knight Fire Tube boilers are typically shipped ready to fire on natural gas. Check boiler rating plate to
determine which fuel the boiler is set for. If set to natural gas, it may be converted to LP by installing an LP
venturi. In order to operate on LP gas, an LP venturi MUST BE installed. Failure to comply could result in
severe personal injury, death, or substantial property damage.
Check inlet gas supply
NOTICE
WARNING
The gas piping must be sized for the proper flow and length
of pipe, to avoid excessive pressure drop. Both the gas meter
and the gas regulator must be properly sized for the total gas
load.
If you experience a pressure drop greater than 1 inch w.c.,
the meter, regulator, or gas line is undersized or in need of
service. Perform the steps below when checking inlet gas
supply:
1. Turn the main power switch to the “OFF” position.
2. Shut off gas supply at the manual gas valve in the gas
piping to the appliance.
CSA or UL listed flexible gas connections
are acceptable, but you must exercise
caution to ensure that the line has adequate
capacity to allow your boiler to fire at full
rate. Consult with local codes for proper
installation or service procedures.
DO NOT adjust gas valve outlet pressure.
The gas valve is factory-set for the correct
outlet pressure. This setting is suitable
for natural gas and propane, requiring
no field adjustment. Attempting to
alter the gas valve outlet pressure could
result in damage to the valve, causing
potential severe personal injury, death, or
substantial property damage.
Length of Pipe in Straight Feet
3. Loosen the set screw one (1) full turn from inside the
pressure tap on top of the gas valve. Place the tubing of
the manometer over the tap once the set screw is
loosened as shown in FIG. 7-3.
4. Slowly turn on the gas supply at the field installed
manual gas valve.
5. Turn the power switch to the “ON” position.
6. Locate the pinhole button above the RESET button on
the display board (FIG. 11-1). Insert a thin
wire (such as a paper clip) into the hole and press the
button once and hold for 5 seconds to place the boiler
into Service Mode. In Service Mode the boiler will fire at
ignition speed and will then modulate up to full fire.
7. Observe the gas supply pressure as the burner fires at
100% of rated input. Percent of burner input will be
displayed on the control panel.
8. Ensure inlet pressure is within specified range.
Minimum and maximum gas supply pressures are
specified in this section of the manual.
9. If gas supply pressure is within normal range and no
adjustments are needed, proceed on to Step 11.
10. If the gas pressure is out of range, contact the gas utility,
gas supplier, qualified installer or service agency to
determine the necessary steps to provide proper gas
pressure to the control.
11. Place the boiler back into normal operation by pressing
STOP.
49
Page 50
7 Gas connections
A
Installation & Operation Manual
WARNING
When re-tightening the set screw, be sure
to tighten securely to prevent gas leaks.
Do not check for gas leaks with an open
flame -- use the bubble test. Failure to
use the bubble test or check for gas leaks
can cause severe personal injury, death, or
substantial property damage.
12. Turn the power switch to the “OFF” position.
13. Shut off the gas supply at the manual gas valve in the gas
piping to the appliance.
14. Remove the manometer from the pressure tap on top of
the gas valve. Re-tighten the set screw inside the pressure
tap.
15. Turn on the gas supply at the manual gas valve.
16. Turn the power switch to the “ON” position.
17. Check burner performance by cycling the system while
you observe burner response. The burner should ignite
promptly. Flame pattern should be stable. Turn system
off and allow burner to cool, then cycle burner again to
ensure proper ignition and flame characteristics.
Gas Pressure
The gas pressure must remain between 4 inches w.c. (natural),
8 inches w.c. (LP) minimum and 14 inches w.c. (natural and
LP) maximum during stand-by (static) mode and while in
operating (dynamic) mode. If an in-line regulator is used,
it must be a minimum of 10 feet from the Knight Fire Tube
boiler. It is very important that the gas line is properly
purged by the gas supplier or utility company. Failure to
properly purge the lines or improper line sizing, will result
in ignition failure.
The problem is especially noticeable in NEW LP installations
and also in empty tank situations. This can also occur when
a utility company shuts off service to an area to provide
maintenance to their lines.
Gas valve replacement
The gas valve MUST NOT be replaced with a conventional
gas valve under any circumstances. As an additional safety
feature, this gas valve has a flanged connection to the venturi
and blower.
WARNING
Failure to follow all precautions could
result in fire, explosion, or death!
Figure 7-3 Inlet Gas Supply Check
LOOSEN THE SET SCREW ONE (1) FULL TURN
ND PLACE THE MANOMETER TUBING OVER
THE PRESSURE TAP
A
DETAIL A
DIR #2000507872 00
50
Page 51
Installation & Operation Manual
8 Field wiring
Installation must comply with:
1. National Electrical Code and any other national, state, provincial, or local codes, or regulations.
2. In Canada, CSA C22.1 Canadian Electrical Code Part 1, and any local codes.
WARNING
NOTICE
NOTICE
CAUTION
ELECTRICAL SHOCK HAZARD – For your
safety, turn off electrical power supply before
making any electrical connections to avoid
possible electric shock hazard. Failure to do
so can cause severe personal injury or death.
Wiring must be N.E.C. Class 1.
If original wiring as supplied with boiler
must be replaced, use only type 105°C wire
or equivalent.
Boiler must be electrically grounded as
required by National Electrical Code ANSI/
NFPA 70 – latest edition.
This boiler is equipped with a feature that
saves energy by reducing the boiler water
temperature as the heating load decreases.
This feature is equipped with an override,
which is provided primarily to permit the use
of an external energy management system
that serves the same function. This override
MUST NOT be used unless at least one of the
following conditions is true:
1. An external energy management
system is installed that reduces the
boiler water temperature as the heating
load decreases.
2. This boiler is not used for any space
heating.
3. This boiler is part of a modular or
multiple boiler system having a total
input of 300,000 Btuh/hr or greater.
4. This boiler is equipped with a tankless
coil.
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation.
Line voltage connections
1. Connect 120 VAC power wiring to the line voltage
terminal strip in the junction box, as shown in FIG. 8-1.
2. Provide and install a fused disconnect or service switch
(15 amp recommended) as required by the code.
3. Wire the boiler, DHW (if used), and system pump as
shown in FIG. 8-1:
a. The boiler pump is shipped loose. Wire into the
line voltage terminal strip as shown. For variable
speed pump operation, connect the 0 - 10 VDC
signal cables to the low voltage board.
NOTICE
If the boiler, DHW, or system pump
motor is larger than 1/8 hp or 1.8 amps, it
must be isolated with a relay.
NOTICE
The power outlet is on a separate circuit
than the boiler ON/OFF switch, and will
remain powered when the boiler is turned
off.
The line voltage terminals supply power to an equipment
outlet, located on the side of the unit. This can be used to
supply power to a condensate pump or other low power
equipment. Ensure the load does not exceed a maximum of
7 amps.
Low voltage connections
1. Route all low voltage wires through the openings on the
left side, as shown in FIG. 8-2.
2. Connect low voltage wiring to low voltage connection
board as shown in FIG. 8-3 and the boiler wiring
diagram.
Figure 8-2 Routing Field Wiring
Figure 8-1 Line Voltage Field Wiring Connections
NEUTRAL
W
GROUND
PUMP
LINE
G
BK
BK
G
W
BK
G
W
BK
G
W
DIR #2000507881 00
120V SUPPLY
SERVICE
SWITCH
SYSTEM
PUMP
BOILER
DOMESTIC
HOT WATER
PUMP
HIGH VOLTAGE
WIRING OPENINGS
LOW VOLTAGE
CONNECTION BOARD
LOW VOLTAGE
WIRING OPENINGS
DIR #2000507882 00
51
Page 52
8 Field wiring
Installation & Operation Manual
Thermostat
1. Connect the room thermostats or end switches (isolated
contact only) to Heat/Loop Demand 1, 2, or 3, as shown
in FIG. 8-3.
2. Install the thermostat on the inside wall away from
influences of drafts, hot or cold water pipes, lighting
fixtures, television, sunlight, or fireplaces.
3. Thermostat anticipator (if applicable):
a. If connected directly to boiler, set for 0.1 amps.
b. If connected to relays or other devices, set to match
total electrical power requirements of connected
devices. See device manufacturer’s specifications
and thermostat instructions for details.
Outdoor temperature sensor
In the absence of an external energy management system, an
outdoor temperature sensor must be used.
1. Mount the sensor on an exterior wall, shielded from
direct sunlight or flow of heat or cooling from other
sources.
2. Route sensor wires through a knockout at the rear of the
boiler (see FIG. 8-2).
3. Connect outdoor temperature sensor (FIG. 8-3) to the
outdoor sensor terminals on the connection board to
enable outdoor reset operation of the Knight Fire Tube
boiler.
DHW thermostat
Connect storage indirect water heater (DHW) thermostat
(FIG. 8-3) to the DHW thermostat terminals on the
connection board. If a tank sensor is connected (see DHW
Tank Sensor below) the tank thermostat is ignored.
DHW tank sensor
1. By installing a tank sensor, the SMART SYSTEM control
can perform the tank thermostat function. The SMART
SYSTEM control automatically detects the presence of
this sensor and generates a DHW call for heat when
the tank temperature drops 6°F (3°C) below the tank
set point and finishes the call for heat when the tank
temperature reaches the tank set point.
2. The tank sensor included with the Lochinvar Squire
Indirect DHW tank is the only sensor suitable for use
with the SMART SYSTEM control. Connect the sensor
leads to the Tank Sensor terminals on the Low Voltage
Connection Board (FIG. 8-3).
WARNING
3. If the tank sensor is not compatible with the indirect
tank, a tank thermostat can be used to control the
boiler. The tank thermostat should be installed per
the manufacturer’s instructions and wired to the DHW
Thermostat terminals on the Low Voltage Connection
Board.
52
Failure to use the correct sensor may result
in the tank temperature being either above
or below the set point.
Louver relay
If louvers need to operate when the boiler fires, they can be
controlled by this output. Connect these terminals to a 24 VAC
relay coil, which is wired to operate the louvers (FIG. 8-3).
Auxiliary (louver proving) switch
When the operation of the louvers or auxiliary equipment needs
to be verified before the boiler fires, remove the jumper wire
from these terminals and connect them to the normally open
contacts on its proving switch (FIG. 8-3).
High gas pressure switch
If a switch is provided to detect excessive gas pressure, remove
the jumper wire from the terminals on the connection board,
and then connect them to its normally closed contacts (FIG.
8-3).
Low gas pressure switch
1. If a switch is provided to detect low gas pressure, remove
the jumper wire from the terminals on the connection
board and connect them to its normally open contacts (FIG.
8-3).
2. If both a high and low gas pressure switch is used, connect
their respective contacts in series, and connect them to the
terminals on the connection board (FIG. 8-3).
Variable speed system pump
If a variable speed pump is used in the primary loop, and a
0-10V signal is available from the pump speed control, this
signal can be used by the SMART SYSTEM control to anticipate
changes in the building heat load. By connecting this 0 - 10V
signal to the 0 - 10V SYS PUMP IN terminals, the boiler (or
cascade) can modulate up and down as the primary flow
increases and decreases.
Boiler pump speed output
This 0 - 10V output is available to control the speed of a variable
speed boiler pump. The SMART SYSTEM control will vary the
speed of this pump in order to maintain a minimum T across
the heat exchanger, as well as prevent high limit lockouts when
the flow in the primary loop is extremely low. NOTE: This
feature is to be used with Primary Secondary Piping systems
only. A system supply sensor must be installed. Connect this
output to the 0 - 10V input on the boiler pump speed control.
Factory supplied pump wiring - brown (+) blue (-).
Rate output
This output provides a 0 - 10V signal that is proportional to the
firing rate of the boiler. This may be used by a BMS system to
monitor the actual rate of the boiler.
ModBus/BACnet
When the optional ModBus or BACnet interface module is
installed, the RS-485 cable is connected to these terminals. Use
shielded, 2-wire twisted pair cable. If desired, the shield can
be connected to ground by installing a jumper wire between
terminals 1 and 3 on connector X5 on the optional ModBus/
BACnet interface module.
Page 53
8 Field wiring (continued)
Installation & Operation Manual
Flow switch
1. A flow switch is used to guarantee flow through the
boiler before allowing it to fire. The flow switch must be
installed at the boiler outlet.
2. Remove the jumper wire from these terminals, and
connect these terminals to the normally open contacts on
the flow switch (FIG. 8-3).
System supply sensor
1. By installing the system supply sensor into the supply
of the primary loop, the temperature of the primary
supply can be controlled. The SMART SYSTEM control
automatically detects the presence of this sensor, and
controls the boiler firing rate to maintain the system
supply temperature to the set point (if the outlet sensor
control is currently selected). If it is desired to control
the system return temperature, then program the
SMART SYSTEM control to use the inlet sensor as the
controlling sensor. See the Knight Fire Tube Boiler
Service Manual for instructions on how to use the inlet
sensor as the controlling sensor. When the inlet sensor
is programmed as the controlling sensor, it is vital that
the SYSTEM SUPPLY sensor be installed. DO NOT
INSTALL THE SYSTEM SUPPLY SENSOR INTO THE
SYSTEM RETURN.
2. The sensor provided with the boiler must be used for the
system sensor.
3. Connect these terminals to the system supply sensor
(FIG. 8-3).
Boiler management system
The United States Energy Policy and Conservation Act
requires residential heating boilers with inputs less than
300,000 Btu/hr be equipped with a control that automatically
adjusts boiler water temperature in relation to heat demand.
An external control may be connected to control the firing
rate or the set point of the boiler provided that either an
external energy management system is installed that reduces
the boiler water temperature as the heating load decreases,
the boiler is not used for any space heating, or the boiler is
part of a modular or multiple boiler system having a total
input of 300,000 Btu/hr or greater.
1. An external control may be connected to control either
the firing rate or the set point of the boiler. If the external
control uses a set of contacts to enable the boiler, connect
the contacts to the Heat/Loop Demand 1 terminals.
Otherwise, the SMART SYSTEM control will be enabled
by the 0-10V signal.
Runtime contacts
The SMART SYSTEM control closes a set of dry contacts
whenever the burner is running. This is typically used by
Building Management Systems to verify that the boiler is
responding to a call for heat.
Alarm contacts
The SMART SYSTEM control closes another set of contacts
whenever the boiler is locked out or the power is turned off.
This can be used to turn on an alarm, or signal a Building
Management System that the boiler is down.
DHW recirculation sensor
The Knight Fire Tube boiler is able to control a DHW
recirculation pump. To operate this feature, a temperature
sensor must be installed in the circulation loop return.
Connect this sensor to the DHW recirculation sensor
terminals on the Low Voltage Connection Board.
DHW recirculation pump
When the DHW recirculation sensor (as described above) is
connected, the Knight Fire Tube SMART SYSTEM control will
output 24 VAC to control a DHW recirculation pump relay
(field supplied). Connect the coil of the DHW recirculation
pump relay to the 24 VAC recirculation pump relay coil
terminals on the Low Voltage Connection Board.
Wiring of the cascade
When wiring the boilers for Cascade operation, select one
boiler as the Leader boiler. The remaining boilers will be
designated as Members. See the “Configuration of the
Cascade” Section for a detailed explanation of this procedure.
Connect the system supply sensor and outdoor air sensor (if
used) to the Leader boiler. For the Cascade system to work
properly the system supply sensor must be installed. The
location of the system supply sensor should be downstream
of the boiler connections in the main system loop (as shown
in Section 6 - Hydronic Piping). The system supply sensor
should be wired to the Low Voltage Connection Board at the
terminals marked for the system sensor (see FIG. 8-3). The
Leader control will use the water temperature at the system
supply sensor to control the operation of the Cascade.
2. Make sure the (-) terminal is connected to the (-) or
common output terminal of the external control, and
the 0 - 10 Vdc terminal is connected to the 0 - 10 Vdc
terminal of the external control. Make sure the (-)
voltage is not below ground.
53
Page 54
8 Field wiring
Wiring of the cascade (continued)
If outdoor air reset is desired, the outdoor air sensor should be
wired to the Low Voltage Connection Board at the terminals
marked for the outdoor air sensor (FIG. 8-3). If the outdoor
air sensor is connected, the Leader control will calculate the
water temperature set point based on the programmed reset
curve parameters. If the outdoor air sensor is not connected,
the Leader control will maintain the fixed water temperature set
point that is programmed into the control.
If a Thermostat, Zone Control enable output, or Building
Management System enable output is available, it should be
wired to the Low Voltage Connection Board on the Leader
boiler at the terminals marked for one of the heat/loop demands
1-3 (FIG. 8-3). If the boilers are to run continuously, connect a
jumper wire between the R and W terminals for the heat/loop
demand input. This will initiate a call for heat on the Cascade.
Communication between the Leader boiler and the Member
boilers is accomplished by using shielded, 2-wire twisted pair
communication cable. Connect one of the twisted pair wires
to Cascade terminal A on each of the Low Voltage Connection
boards, and the other wire of the twisted pair to Cascade
terminal B on each of the Low Voltage Connection Boards.
Connect the shield wires to one of the shield terminals on
the Low Voltage Connection Boards (FIG. 8-3). If more than
two boilers are on the Cascade, daisy chain the wiring from
the Cascade terminals on the second boiler to the Cascade
terminals on the third boiler, then from the third to the forth,
and so on. The connections between boilers can be made in any
order, regardless of the addresses of the boilers. Try to keep
each cable as short as possible.
Installation & Operation Manual
When the Member 1 boiler is programmed as an alternate
leader this allows the Member 1 boiler to automatically assume
control of the Cascade should it lose communications with the
Leader boiler. When programmed to YES, it is recommended
that the Member 1 boiler have its own set of external sensors
installed (such as the system supply sensor), to maintain the
same level of temperature control as with the Leader boiler.
Voltage signals (such as 0 - 10V system pump speed input) can
be connected to both boilers.
WARNING
When communication is re-established with the Leader boiler,
Member 1 will automatically relinquish control of the Cascade
to the Leader boiler.
DO NOT connect the sensors connected to
the Leader boiler to the Member 1 boiler.
The actual water temperatures will be
higher than expected, which could lead to
property damage, personal injury, or death.
54
Page 55
8 Field wiring (continued)
A
Figure 8-3 Low Voltage Field Wiring Connections
Installation & Operation Manual
DIR #2000507983 00
NOTE:
CONNECTION BOARD SPLIT FOR
ILLUSTRATION PURPOSES
NO
COM
LOUVER
ROOM THERMOSTAT 1
ROOM THERMOSTAT 2
SYSTEM SUPPLY SENSOR
OUTDOOR SENSOR
DHW RECICULATION SENSOR
TANK SENSOR
TO
NEXT
BOILER
A
B
SHIELD
TANK THERMOSTAT
ROOM THERMOSTAT 3
FLOW SWITCH
PROVING SWITCH
LOUVER RELAY
SYSTEM PUMP
RELAY
RECIRCULATION PUMP
SPEED
CONTROL
PUMP
BOILER
B
A
WIRE AS
NEEDED
SYSTEM
BUILDING
MANAGEMENT
FROM
BOILER
SHIELD
B
PREVIOUS
55
Page 56
9 Condensate disposal
R
Installation & Operation Manual
Condensate drain
1. This boiler is a high efficiency appliance that produces
condensate.
2. The bottom of the boiler has a 1 1/4 inch pipe for
connection of the condensate trap (FIG. 9-1).
3. The provided condensate trap is equipped with a ball
that acts as a seal against harmful flue gases escaping
in case there is no condensate in the trap. If this ball is
not present, flue gases may be able to pass through the
trap when there is no condensate present, resulting in an
unsafe environment. It is important to check and make
sure the ball is located in the trap, acting as a seal against
flue gases.
4. Fill condensate trap with enough water to make the ball
float (FIG. 9-1).
5. Loosen compression fitting (FIG. 9-1).
6. Slide the condensate trap onto the condensate drain
at the bottom of the unit. As the trap is pressed on, a
stainless steel retaining ring will engage the drain pipe
allowing the trap to be pushed on, but not pulled off.
7. Tighten compression fitting.
8. Slope condensate tubing down and away from the
boiler into a drain or condensate neutralizing filter.
Condensate from the Knight Fire Tube boiler will be
slightly acidic (typically with a pH from 3 to 5). Install a
neutralizing filter if required by local codes.
A Neutralizer Kit is available from the factory.
9. Do not expose condensate line to freezing temperatures.
10. Use only plastic tubing or piping as a condensate drain
line (FIG. 9-1).
11. A condensate removal pump is required if the boiler is
below the drain. When installing a condensate pump,
select one approved for use with condensing boilers and
furnaces. The pump should have an overflow switch to
prevent property damage from condensate spillage. The
switch should be wired in series with the air pressure
switch inside the boiler.
NOTICE
Use materials approved by the authority
having jurisdiction. In the absence of other
authority, PVC and CPVC pipe must comply
with ASTM D1785 or D2845. Cement and
primer must comply with ASME D2564 or
F493. For Canada use CSA or ULC certified
PVC or CPVC pipe, fittings, and cement.
NOTICE
To allow for proper drainage on large
horizontal runs, a second line vent may
be required and tubing size may need to
increase to 1 inch.
The condensate line must remain
unobstructed, allowing free flow of
condensate. If condensate is allowed to
freeze in the line or if the line is obstructed in
any other manner, condensate can exit from
the condensate trap vent opening, resulting
in potential water damage to property.
WARNING
The stainless steel retaining ring must be
installed between the rubber sealing gasket
and the compression fitting (FIG. 9-1). The
compression fitting must be tightened.
The condensate trap must have the float ball
(FIG. 9-1) in place during all times of boiler
operation to avoid flue gas emission from
the condensate drain line. Failure to ensure
the float ball is in place could result in severe
personal injury or death.
Figure 9-1 Condensate Disposal
COMPRESSION
FITTING
CONDENSATE
TRAP
REMOVABLE CAP
FOR CLEANING TRAP
CONDENSATE DRAIN CONNECTION ROUTE TO FLOOR DRAIN OR
NEUTRALIZING FILTER USING
1/2” PVC TUBING
DIR #2000556907 00
FLOAT BALL
REMOVABLE
CAP TO CLEAN
OUT TRAP
GASKET
RETAINING
RING
CONDENSATE
DRAIN
DIR #2000556918 00
DI
56
Page 57
10 Start-up (continued)
Installation & Operation Manual
Pre-Commissioning Cleaning
1. Prior to fill and start-up, flush the entire heating system.
2. Clean the entire heating system with an approved precommissioning cleaner (comparable to Sentinel X300
or Fernox F3) in accordance with the manufacturer’s
recommendation to remove debris and prolong the life of
the heat exchanger.
3. Clean all water filtering devices in the system.
4. Flush the cleaning solution out of the entire system and
refill.
Fill water
Check/control fill water chemistry
IMPORTANT
The manufacturer recommends the following for properly
filling your boiler with the appropriate water chemistry for
closed loop boilers. Good fill water quality will help extend
the life of the appliance by reducing the effects of lime scale
buildup and corrosion in closed loop systems.
Hardness between 5 and 12 grains per gallon
1. Consult local water treatment companies for hard water
areas (above 12 grains per gallon hardness).
2. Hardness levels that are above 12 grains/gallon can lead
to lime scale buildup throughout the boiler system. If the
fill water is below 5 grains/gallons, usually due to use of a
water softener, it is recommended to mix in some potable
water at the inlet to increase the hardness of the water to
above 5 grains/gallons.
pH between 6.5 and 8.5
1. pH levels below 6.5 can cause an increase in the rate of
corrosion. pH of 8.5 or higher can potentially cause lime
scale buildup.
Total Dissolved Solids (TDS) less than 350 ppm
1. Total dissolved solids are all minerals, salts, metals, and
charged particles that are dissolved in water.
2. The greater the amounts of TDS present, the higher the
corrosion potential due to increased conductivity in the
water.
Chlorine concentration less than 150 ppm
1. Do not fill boiler or operate with water containing
chlorine in excess of 150 ppm.
2. Filling with fresh drinking water should be acceptable.
Conduct water quality testing prior to
installing the appliance. Various solutions
are available to adjust water quality.
Boiler water
CAUTION
CAUTION
Table 10A Boiler Water Chemistry
Speci cationRange
Dissolved Solids< 2000 ppm
• Monitoring pH, chlorides, TDS, and hardness
levels can prolong the life of the appliance by reducing
lime scale buildup, corrosion, and erosion. Check for
leaks to ensure that fresh water is not entering the
system.
• Continual fresh makeup water will reduce boiler life.
• Mineral buildup in the heat exchanger reduces heat
transfer, overheats the stainless steel heat exchanger,
and causes failure.
• The addition of oxygen carried in by makeup water
can cause internal corrosion in system components.
• Leaks in the boiler or piping must be repaired at
once to prevent excessive makeup water. For this
purpose, it is recommended to install a water meter
to easily check the amount of makeup water entering
the system. Makeup water volume should not exceed
5% of the total system volume per year. NOTE: When
makeup water is added, make sure the chemical
additives are added to maintain the correct level.
• An approved multi-metal corrosion inhibitor
(comparable to Sentinel X100 or Fernox F1) is
recommended at the correct concentration and in the
manner recommended by the manufacturer.
Do not use petroleum based cleaning or
sealing compounds in the boiler system.
Gaskets and seals in the system may be
damaged. This can result in substantial
property damage.
DO NOT use "homemade cures" or "boiler
patent medicines". Serious damage to
boiler, personnel, and/or property may
result.
BOILER WATER CHEMISTRY
pH Level6.5 to 9.5
Chloride< 150 ppm
Freeze protection
WARNING
Ethylene glycol is toxic, DO NOT use as
your freeze protection. Ethylene glycol has a
sweet aroma which children and pets could
mistake as food and ingest; leading to death.
3. Do not use the boiler to directly heat swimming pool or
spa water.
57
Page 58
10 Start-up
1. Use glycol only if needed for freeze protection.
2. Propylene glycol is the recommended freeze protection.
3. Make sure to flush the boiler system before adding
glycol.
4. Determine the freeze protection fluid quantity using
system water content, following the fluid manufacturer's
instructions. Boiler water content is listed on page 6.
Remember to include expansion tank water content.
5. Local codes may require a backflow preventer or actual
disconnect from city water supply.
6. When using freeze protection fluid with automatic fill,
it is suggested to install a water meter to monitor water
makeup. Freeze protection fluid may leak before the
water begins to leak, causing the concentration to drop,
which reduces the freeze protection level.
7. The freeze protection set points may be lowered when
freeze protection fluid is used (see the Knight Fire Tube
Service Manual).
Installation & Operation Manual
Precautions include installing a water meter to evaluate the
fresh water volume entering the system (should be no more
than 5% system volume). Additional volumes of fresh water
could indicate that a leak is present.
Fill and test water system
1. Fill system only after ensuring the water meets the
requirements of this manual.
2. Close automatic and manual air vents and boiler drain
valve.
3. Fill to correct system pressure. Correct pressure will vary
with each application.
a. The minimum cold water fill pressure for a system is
12 psi.
b. Pressure will rise when the boiler is turned ON and
system water temperature increases.
4. At initial fill and during boiler startup and testing, check
the system thoroughly for any leaks. Repair all leaks before
proceeding further.
8. Consult the glycol manufacturer for details on the
suggested mix of glycol and water for the desired freeze
protection level and the de-rate effect it will have on the
boiler output.
Test / replace freeze protection fluid
1. For systems using freeze protection fluids, follow the
fluid manufacturer's instructions.
2. Freeze protection fluid must be replaced periodically due
to degradation of inhibitors over time.
3. It is recommended to test the glycol concentration
annually and adjust within the desired set points.
Oxygen prevention
CAUTION
Dissolved oxygen can have a negative effect on the boiler
system. Oxygen can cause iron oxide to generate iron
deposits. Oxygen may also increase the rate of corrosion
on non-stainless steel parts of the system. A low pH level
combined with oxygen further enhances its corrosive effects.
After boiler installation, check for air leaks in the following
areas:
• Suction gasket
• Pump
• Air valve
• O-ring gaskets
58
Eliminate all system leaks. Continual
fresh makeup water will reduce boiler
life. Minerals can build up in the
heat exchanger, reducing heat transfer,
overheating the heat exchanger, and
causing heat exchanger failure.
Purge air from water system
1. Purge air from system:
a. Connect a hose to the purge valve (see purge/drain
valve in the piping diagrams). Route the hose to an
area where water can drain and be seen.
b. Close the boiler or system isolation valve between the
purge valve and fill connection to the system.
c. Close zone isolation valves.
d. Open the quick-fill valve on the cold water makeup
line.
e. Open purge valve.
f. Open the isolation valves one zone at a time. Allow
water to run through the zone, pushing out the air.
Run until no noticeable air flow is present. Close
the zone isolation valves and proceed with the next
zone. Follow this procedure until all zones are purged.
g. Close the quick-fill water valve and purge valve and
remove the hose. Open all isolation valves. Watch that
system pressure rises to correct cold-fill pressure.
h. After the system has operated for a while, eliminate
any residual air by using the manual air vents located
throughout the system.
i. If purge valves are not installed in the system, open the
manual air vents in the system one at a time, beginning
with the lowest floor. Close the vent when water
squirts out. Repeat with remaining vents.
2. Open the automatic air vent (diaphragm-type or bladder
type expansion tank systems only) one turn.
3. Open other vents:
a. Starting on the lowest floor, open air vents one at a
time until water squirts out.
b. Repeat with remaining vents.
4. Refill to correct pressure.
Page 59
10 Start-up (continued)
Installation & Operation Manual
Final checks before starting the boiler
• Read the Knight Fire Tube Boiler Service Manual to
familiarize yourself with SMART SYSTEM control module
operation. Read the preceding Startup sections in this
manual, for proper steps to start the boiler.
Verify the preparation procedures have been completed.
• Verify the boiler and system are full of water and all system
components are correctly set for operation.
• Verify electrical connections are correct and securely
attached.
• Inspect vent piping and air piping for signs of deterioration
from corrosion, physical damage or sagging. Verify air
piping and vent piping are intact and correctly installed per
this manual.
Check for gas leaks
WARNING
WARNING
WARNING
Before starting the boiler, and during
initial operation, smell near the floor and
around the boiler for gas odorant or any
unusual odor. Remove the top access
panel and smell the interior of the boiler
enclosure. Do not proceed with startup
if there is any indication of a gas leak.
Use an approved leak detection solution.
Repair any leaks at once.
DO NOT adjust gas valve outlet pressure.
The gas valve is factory set for the correct
outlet pressure. This setting is suitable
for natural gas and propane, requiring
no field adjustment. Attempting to
alter the gas valve outlet pressure could
result in damage to the valve, causing
potential severe personal injury, death, or
substantial property damage.
Propane boilers only – Your propane
supplier mixes an odorant with the propane
to make its presence detectable. In some
instances, the odorant can fade, and the
gas may no longer have an odor. Before
startup (and periodically thereafter), have
the propane supplier verify the correct
odorant level in the gas.
Inspect condensate system
Check thermostat circuit(s)
1. Disconnect the two external wires connected to each of the
heat/loop demand terminals on the connection board.
2. Connect a voltmeter across these two incoming wires.
Close each thermostat, zone valve, and relay in the external
circuit one at a time and check the voltmeter reading across
the incoming wires.
3. There should NEVER be a voltage reading.
4. If a voltage does occur under any condition, check and
correct the external wiring. (This is a common problem
when using 3-wire zone valves.)
5. Once the external thermostat circuit wiring is checked and
corrected if necessary, reconnect the external thermostat
circuit wires to the connection board.
Setup wizard
The Knight Fire Tube boiler control has a Setup Wizard feature
that can be used to help with the initial start-up of the unit.
This Setup Wizard will walk an installer through the most
commonly required parameters.
The Setup Wizard is automatically accessed the first time the
unit is powered up from the factory and will allow setting
of certain parameters without the need to enter the installer
password. Once the Setup Wizard is completed or canceled, it
can only be accessed again by going through the Installer Menu.
Figure 10-1 Setup Wizard Navigation
USB Memory Drive
PC Connection
Button selection in the setup wizard
NAVIGATION DIAL -- Adjust Setting
RIGHT SELECT KEY -- Next Parameter
LEFT SELECT KEY -- Save and Exit
Reset
Inspect/check condensate lines and fittings
1. Inspect the condensate drain line, condensate fittings and
condensate trap to ensure the trap is properly installed
and connected to the condensate pipe under the boiler.
Reference Section 9 - Condensate Disposal for installation
instructions.
59
Page 60
10 Start-up
Parameters in the setup wizard
DATE / TIME
The control uses an internal clock for the night setback feature
and for logging of events. For these features to work correctly,
the clock must be set when the boiler is first installed or
anytime the boiler has been powered off for more than four
(4) hours.
TEMPERATURE UNITS
The control can display temperature in either °C or °F (default
°F).
SPACE HEAT 1 SETPT
This parameter sets the water temperature set point for the
SH1 space heating zone. It also serves as the upper limit for
the SH1 set point that can be generated by the outdoor air
reset curve for that zone. The default value is 125°F (52°C).
SH1 LOW OUTDOOR TEMP
This parameters sets the outdoor air temperature
corresponding to the SH1 Set Point 1 at Low Outdoor
Temperature parameter used on the outdoor air reset curve.
This parameter should be set to the outdoor temperature
used in the heat load calculation for the cold design day. The
default value is 25°F (-4°C).
SH1 SETPT@ LOW OUTDOOR TEMP
This will be the calculated space heating set point when the
outdoor air temperature drops to the SH1 Low Outdoor
Temperature parameter set for the coldest day. If the outdoor
air temperature drops further, the set point will increase
above this setting until the Space Heat 1 Set Point is met. The
default value is 180°F (82°C).
SH1 HIGH OUTDOOR TEMP
When the outdoor air temperature rises to or above this
point, the water temperature will be at the SH1 Set Point at
High Outdoor Temperature parameter. The default value is
70°F (21°C).
SH1 SETPT@ HIGH OUTDOOR TEMP
This will be the calculated space heating set point when the
outdoor air temperature rises to or above the SH1 High
Outdoor Temperature set point. The default is 70°F (21°C).
Installation & Operation Manual
DHW TANK SETPT
When a tank sensor is installed the control will use this value for
the tank thermostat set point. The default value is 180°F (82°C).
DHW BOILER SETPT
When a DHW call for heat becomes active, the control will use
the DHW boiler set point to determine the firing rate of the
boiler based on the boiler outlet water temperature, or system
temperature when DHW is programmed as a zone. The default
value is 180°F (82°C).
DHW TYPE
This parameter determines whether the Fire Tube boiler treats
the indirect DHW tank as a separate load, or as a zone on the
primary loop. When a DHW demand begins in NORMAL
mode the boiler will turn on the DHW pump, turn off the
boiler pump, and modulate to bring the outlet temperature to
the DHW boiler set point. The maximum firing rate may be
limited in this mode if desired. When programmed as a zone,
the boiler will turn on the DHW pump, leave the boiler pump
on and change the system set point to the DHW Boiler Set point
parameter. The system pump may be forced on or off, or not
changed, depending on the System Pump mode selected (see
Service Manual for details). In this mode, any low temperature
zones may require additional controls to limit the water
temperature sent to those zones. The choices are NORMAL and
ZONE. The default setting is NORMAL.
RAMP DELAY
Enabling ramp delay will limit the firing rate for a fixed period
of time at the start of a space heating or BMS set point demand.
There are six limits, each with their own time delay. The default
setting is DISABLE. The factory settings for ENABLE are listed
in Table 10B.
Table 10B Ramp Delay Default Time Delay
StepRate LimitTime Delay
115%2 min
230%1 min
345%1 min
460%1 min
580%1 min
6100%1 min
60
BOILER PUMP TYPE
This parameter determines how the control turns the boiler
circulating pump on and off. The choices are CONSTANT and
VARIABLE. When set to CONSTANT, the control will use an
external relay to cycle power supply to the boiler pump. The
CONSTANT setting can be used with either a fixed or variable
speed circulating pump. When set to VARIABLE and wired to
the 0-10V boiler pump connections on the low voltage board,
the control will use a 0-10 VDC signal to turn off the pump.
The VARIABLE setting should be used when controlling the
ECM variable speed boiler pump provided by the factory. The
default setting is CONSTANT.
Page 61
10 Start-up (continued)
Start the boiler
Read and follow the Operating instructions in FIG. 10-2.
If boiler does not start correctly
1. Check for loose connections, blown fuse or power switch
off.
2. Check that boiler water temperature is below 200°F.
3. Check that thermostat set above room temperature.
4. Check that gas turned on at meter and boiler.
5. Check that incoming gas pressure is within the limits
specified in Section 7.
If none of the above corrects the problem, refer to the
Troubleshooting Section of the Knight Fire Tube Boiler
Service Manual.
Check system and boiler
Check water piping
1. Check system piping for leaks. If found, shut down the
boiler and repair immediately. (See Section 10 - Boiler
Water for information regarding failure to repair leaks.)
2. Vent any remaining air from the system using manual
vents. Air in the system will interfere with circulation
and cause heat distribution problems and noise.
Check vent piping and air piping
Check for gastight seal at every connection and seam of vent
and air piping.
WARNING
Check gas piping
Check around the boiler for gas odor following the procedure
in Section 7 - Connecting Gas Supply Piping.
Propane boilers – verify conversion
Verify propane conversion has been completed per the
instructions given in Section 2 - Gas Conversions.
WARNING
WARNING
Venting system must be sealed gastight
to prevent flue gas spillage and carbon
monoxide emissions, which will result in
severe personal injury or death.
Knight Fire Tube boilers are typically
shipped ready to fire on natural gas.
Check boiler rating plate to determine
which fuel the boiler is set for. If set to
natural gas, it may be converted to LP by
installing components provided in the
LP conversion kit. In order to operate
on LP gas, these components MUST
BE installed. Failure to comply could
result in severe personal injury, death, or
substantial property damage.
If you discover evidence of any gas leak,
shut down the boiler at once. Find the
leak source with a bubble test and repair
immediately. Do not start the boiler again
until corrected. Failure to comply could
result in severe personal injury, death, or
substantial property damage.
Installation & Operation Manual
Check flame and combustion
1. Turn the main power off to the boiler by placing the “On/
Off” switch in the OFF position.
2. Remove the combustion plug from the vent connector
provided on the unit. Insert the probe from a combustion
analyzer into the opening on the vent connector. Note:
Combustion measurements will be made at this point.
3. Turn the main power on to the boiler by placing the “On/
Off” switch in the ON position. Place the boiler into the
active position by pressing the RIGHT SELECT [ON] key
(FIG. 10-1). Note: The brackets ([]) denote screen status.
4. Locate the pinhole button above the RESET button on the
display board. Insert a thin wire (such as a paper clip) into
the hole and press the button once and hold for 5 seconds
to place the boiler into Service Mode.
In Service Mode the boiler will fire at ignition speed and
will then modulate up to full fire.
5. Once the boiler has modulated up to full fire, measure the
combustion. The values should be in the range listed in
Table 10C. The CO levels should be less than 200 ppm for
a properly installed unit.
If the combustion is not within the specified range, reference
the Troubleshooting Section of the Knight Fire Tube Boiler
Service Manual for possible causes and corrective actions.
6. Once the combustion analysis is complete, re-install the
plug in the vent connector.
Test the safety shutoff device by turning the manual shutoff
switch to the OFF position and ensuring that the boiler
shuts down and registers an alarm. Turn the manual
shutoff switch to the ON position and reset the control.
Place the boiler back into normal operation.
Table 10C Flue Products Chart
Natural Gas
Input
Rate
High Fire
Low Fire
Input
Rate
High Fire
Low Fire
WARNING
TargetRange
CO
2
9.2%4.5%9.0% - 10.5% 2.1% - 4.8%
9.0%4.8%8.8% - 9.5%3.9% - 5.2%
O
2
CO
2
O
2
Propane
TargetRange
CO
2
10.8%4.5%10.5% - 11.5% 3.5% - 5.0%
10.5%5.0%10.0% - 11.0% 4.2% - 5.8%
O
2
CO
2
O
2
You must replace the combustion plug
in the vent connector to prevent flue gas
spillage into the room. Failure to comply
could result in severe personal injury, death,
or substantial property damage.
61
Page 62
10 Start-up
Installation & Operation Manual
Set space heating operation
Determine controlling sensor
For space heating systems, the temperature control can be
based on one of three sensors; the inlet, outlet, or system
supply sensor. The SMART SYSTEM control is programmed
at the factory to control the temperature of the outlet
sensor. The control will automatically switch to the system
supply sensor once it is connected. If it is desired to base
the temperature control on the inlet sensor, the appropriate
parameter must be changed in the control. See the Knight
Fire Tube Boiler Service Manual for a detailed explanation of
this procedure.
Verify space heat circulator mode
The Space Heating Mode controls both the system pump
(if connected), and the boiler pump. When the SMART
SYSTEM control receives a space heating call for heat, it
turns on the system pump. If the boiler is not heating an
indirect DHW (Domestic Hot Water) tank, and the set
point is not met, it also turns on the boiler pump. After the
space heating call for heat ends, the system pump continues
to run for a short period of time. The system pump can be
programmed to run continuously, except during outdoor
shutdown. If the boiler pump was running, it continues to
run for a short period of time as well. These pump delays
are factory set to 30 seconds. If different delays are desired,
the appropriate parameters in the control must be changed.
See the Knight Fire Tube Boiler Service Manual for a detailed
explanation of this procedure.
Adjust set point temperature(s)
NOTICE
The NAVIGATION dial may be used during normal
operation to adjust the space heating and tank set point
temperatures.
1. From the Status Screen press the NAVIGATION dial.
2. Turn the NAVIGATION dial counterclockwise to select
the appropriate set point.
3. Press the NAVIGATION dial to adjust the temperature.
4. Once the desired temperature is displayed, press the
RIGHT SELECT [SAVE] key.
5. If necessary repeat Steps 3 and 4 to make adjustments to
additional set points.
6. Press the RIGHT SELECT [HOME[ key to upload the
changes.
7. If the RIGHT SELECT [SAVE] key is not pressed, the
new settings will be discarded.
The brackets ([]) denote screen status.
Set domestic hot water (DHW) operation
Verify DHW mode
There are two (2) modes of operation for DHW, NORMAL
or ZONE. In Normal Mode the boiler treats the indirect
DHW tank as a separate load. When set to ZONE, the boiler
will treat the indirect tank as a zone on the primary loop.
Refer to the Service Manual or Section 10 - Smart System
Setup Wizard for more information.
Set DHW boiler target temperature
When in the DHW Mode, the control will modulate to
maintain the boiler outlet temperature or system supply
temperature to a set point. This set point parameter may be
set in the Smart System Setup Wizard. Reference the Service
Manual for more information.
Set maximum DHW fan speed
If the rated input of the indirect tank is less than the maximum
output of the boiler, change the maximum DHW fan speed
setting to limit the boiler output accordingly, see the Service
Manual for a detailed explanation of this procedure.
Configuration of the cascade
NOTICE
When installed in a Cascade system, the individual controls
must be programmed for cascade operation. This is
accomplished by accessing the control parameters.
Press the [MENU] key for at least five (5) seconds. Input the
Installer code as described in the Service Manual.
Once the control parameters have been accessed, use the
NAVIGATION dial to select the Control Mode parameters.
Rotate then press the NAVIGATION dial to select the
parameter "Cascade Address".
Each appliance in the Cascade system must be programmed
with its own address. The boiler designated as the Leader will
have an address of 0. The remaining boilers in the Cascade
will be Members and have addresses from 1 - 7.
Rotate the NAVIGATION dial to select the appropriate
address. Press the RIGHT SELECT SAVE key.
Press the RIGHT SELECT HOME key to upload the address
into the control. Repeat this procedure for all boilers in the
Cascade, designating the Leader and Member boilers.
The brackets ([]) denote screen status.
62
Page 63
10 Start-up (continued)
Figure 10-2 Operating Instructions
Installation & Operation Manual
63
Page 64
11 Operating information
Installation & Operation Manual
General
How the boiler operates
The Knight Fire Tube boiler uses an advanced stainless
steel heat exchanger and electronic control module that
allows fully condensing operation. The blower pulls in air
and pushes flue products out of the boiler through the heat
exchanger and flue piping. The control module regulates
blower speed to control the boiler firing rate. The gas valve
senses the amount of air flowing into the boiler and allows
only the right amount of gas to flow.
How the control module operates
The SMART SYSTEM control module receives inputs from
boiler sensors and external devices. The control module
activates and controls the blower and gas valve to regulate
heat input and switches the boiler, Domestic Hot Water
(DHW), and system pumps on and off as needed. The user
programs the module to meet system needs by adjusting
control parameters. These parameters set operating
temperatures and boiler operating modes. Boiler operation
can be based on boiler outlet water temperature, boiler inlet
water temperature, system temperature, a 0-10V signal or
ModBus or BACnet, depending on the parameter settings.
Dual Memory
After initial startup the boiler display will store a backup
copy of installer and user parameter settings. If either the
display or control module is replaced, the SMART SYSTEM
will recognize the parameter settings do not match and
show a PARAM MISMATCH prompt on the display. To
maintain the control module parameter settings, choose the
BACKUP TO DISPLAY option. This will keep the settings
currently stored in the boiler control and save them to the
display. This option will generally be used after installing a
new display. When a new control is installed, the RESTORE
FROM DISPLAY option will use the backup settings stored
on the existing display.
Control inputs and outputs
Room thermostat
There are three (3) heat/loop demand connections available
on this control. These inputs tell the boiler to provide water
for space heating. Each demand connection has its own set
point and outdoor air reset curve. When multiple demands
have a call for heat the control will give priority to the
demand with the highest set point.
Example: Assume that both heat/loop demand
1 and heat/loop demand 2 have a call for heat.
Demand 1 has a set point of 110°F. Demand 2 has a set point
of 140°F. The boiler will regulate the system temperature to
140°F until Demand 2 has been satisfied. Once Demand 2
has been satisfied the boiler will provide 110°F water to the
system.
CAUTION
64
When multiple temperature loops are
used, mixing valves are required for the
protection of any low temperature loops.
SMART SYSTEM Multi-temp loop control
The Knight Fire Tube boiler is capable of producing up to
three (3) set point temperatures to meet different space heating
demands. This device controls the temperatures of up to three
(3) separate loops, based on the settings for the three (3) heat/
loop demands.
0 - 10V input (set point or power)
The Knight Fire Tube boiler can be controlled by a Building
Management System (BMS) provided that either an external
energy management system is installed that reduces the boiler
water temperature as the heating load decreases, the boiler
is not used for any space heating, or the boiler is part of a
modular or multiple boiler system having a total input of
300,000 Btu/hr or greater.
The control can be configured by the installer to use a 0 - 10
Vdc signal to either control set point or firing rate.
The Knight Fire Tube boiler can also be programmed to accept
a call for heat from a 0 - 10V signal, reference the Knight Fire
Tube Boiler Service Manual for a detailed explanation of this
procedure.
DHW priority
The SMART SYSTEM control allows the connection of a DHW
thermostat or tank sensor to the low voltage connection board.
When a tank sensor is connected, the DHW thermostat input
is ignored. When a boiler is programmed for DHW Normal
Mode, the maximum firing rate can be limited to match the
input rating of the indirect tank coil.
DHW / space heating (SH) cycling
If a DHW call for heat is received while a space heating call is
in progress, and the DHW is in Normal Mode, the control will
start the DHW pump and shut the boiler pump off. The system
pump will remain on. For stand-alone boilers, if the space
heating call is still active while the DHW call is in operation,
the control will wait for 30 minutes (time adjustable by
installer) then it will switch back to the space heating demand.
There is a timer to switch from space heating to DHW and a
timer to switch from DHW to space heating. The control will
switch back and forth until one of the heat demands end.
Programmable controlling sensor
The control module is programmed to use the outlet sensor
as the control sensor by default. If a system supply sensor
is connected, the control automatically uses it as the control
sensor. For stand-alone boilers, the control sensor can be
changed by the installer to the inlet sensor. If the inlet sensor
is chosen as the controlling sensor, it is recommended that the
system supply sensor be installed in the system supply in order
to provide the best control of the inlet temperature.
Page 65
11 Operating information (continued)
Installation & Operation Manual
Anti-cycling
After the burner turns off, the control will delay the next
burner cycle for a set time period (time is adjustable by the
installer). The time delay will be bypassed if the inlet water
temperature drops too far during the delay.
Boiler and system pump control
The boiler pump will run whenever the burner is firing,
unless the DHW is programmed for Normal Mode and the
boiler is heating the DHW tank. The boiler pump will run
during Freeze Protection Mode as well. It will continue to
run for a short time after the burner turns off or the Freeze
Protection Mode ends.
The system pump will run whenever there is a space heating
call for heat, or the boiler goes into Freeze Protection Mode.
It may be programmed to run during a DHW call for heat
when the DHW is programmed for Zone Mode. It will
continue to run for a short time after the end of the heat
demand or the Freeze Protection Mode. The system pump
can be programmed to run continuously if desired, except
during outdoor shutdown and/or a DHW call for heat.
DHW recirculation pump control
When a DHW recirculation loop is used, the Knight Fire
Tube boiler can control the recirculation pump. To activate
this function, simply install the DHW recirculation sensor
into the return water from the DHW circulation loop. The
control will turn on the DHW recirculation pump when the
return water drops 10°F (5.5°C) below the DHW tank set
point, and will turn back off when the return water rises to
within 5°F (2.5°C) of the DHW tank set point. The control
will turn the DHW recirculation pump off whenever DHW
night setback is active.
Temperature control
Modulation
The Knight Fire Tube boiler is capable of modulating its
firing rate on 055 models from a minimum of 15% to a
maximum of 100% and on all other models from a minimum
of 10% to a maximum of 100%. The firing rate is dictated by
the call for heat (i.e., space heating or domestic hot water),
the heating load, ramp delay (if enabled), and various other
temperature limitations.
Ramp delay
For systems with lower flow, the SMART SYSTEM can
limit the firing rate (when enabled) when a space heating
call for heat starts, or when switching from a DHW call for
heat to a space heating call for heat. There are six (6) limits
that can be programmed, as well as six (6) time intervals
corresponding to each limit. The sixth limit will also limit
the firing rate for the rest of the call for heat.
Gradient limiting
If during operation of the boiler the outlet water temperature
is rising too quickly, the control will reduce the firing rate to
its lowest setting.
Outdoor air reset
With the outdoor air sensor connected, the control module
will calculate the set points of the three (3) space heating
demands based on the programmed reset curves. The
installer can change the slope of the reset curves by several
adjustable parameters. The user can limit the maximum
set point for the system using the space heating set points.
Boost function
If outdoor air reset is active, and any space heating demand
has been active continuously for a set period of time
(time adjustable by installer) and there has been no DHW
demands, the control will increase the set point of that
demand by a fixed number of degrees (adjustable by
installer). This process will continue until the space heating
demand ends, the set point reaches the programmed set
point or a maximum of 20 increases has occurred. Once the
system heat demand is satisfied, the set point will revert to
the value determined by the reset curve.
Night setback
The controller may be programmed to reduce the space
heating and DHW set points during certain times each week.
Seven different start and stop times may be programmed for
the space heating setback and seven start and stop times
for the DHW setback. Any night setback event scheduled
within the next seven (7) days can be temporarily bypassed
if desired.
Vacation mode
Vacation Mode is used to lower the Space Heat (SH) and /
or DHW set points much like Night Setback. The set points
will remain lowered until Vacation Mode is disabled. Night
Setback will not function when Vacation Mode is enabled.
Flame current support
To prevent nuisance shutdowns when the boiler is firing
at minimum rates, the control will increase the firing rate
when the flame signal drops too low.
65
Page 66
11 Operating information
Installation & Operation Manual
Protection features
Outlet temperature, flue temperature, and
temperature rise limiting
The outlet temperature is monitored by the boiler outlet
temperature sensor. When the outlet temperature exceeds
185°F, the unit will reduce the fan speed. If the outlet water
temperature exceeds 195°F the control will shut the unit
down until it cools off.
The control module monitors the flue temperature by a
sensor located in the flue exhaust. If the flue temperature
exceeds 215°F the control will reduce the maximum fan
speed. If the flue temperature exceeds 225°F (107°C) the
control will shut the unit down. The unit will restart
automatically once the flue temperature drops 25°F (14°C)
and the minimum off time has expired.
The control monitors the temperature difference between
the inlet and the outlet sensor. If this difference exceeds
55°F the control will reduce the maximum fan speed. If
the temperature difference exceeds 60°F the control will
shut the unit down. The unit will restart automatically once
the temperature difference has dropped below 55°F and the
minimum off time has expired.
Freeze protection
DO NOT install the boiler in a room likely to freeze.
The following integral feature of the SMART SYSTEM
control module provides some protection for the boiler only
-- not for the system.
• The SMART SYSTEM control module provides
freeze-up protection as follows when the boiler
water temperature drops below 45°F:
• Below 45°F, the boiler and system pumps operate
constantly.
• Below 37°F, the boiler turns on.
• Boiler and pumps turn off if boiler water
temperature rises above 45°F.
• Lower temperatures may be programmed for
systems with anti-freeze solutions.
NOTICE
When system return temperatures
are maintained below the dew point,
condensation will form on the inside of
the boiler jacket causing some internal
sheet metal components to rust.
Low voltage blocking
The blower and gas valve require a minimum amount of
voltage in order to operate properly. If an ignition attempt is
made when the line voltage is temporarily low (such as during a
brownout), the control could enter a manual reset lockout. To
prevent this, the control monitors the voltage and blocks any
heat demands until the voltage returns to an acceptable level.
Monitor external limits
Connections are provided on the connection board for external
limits such as flow switch, low water cutoff, gas pressure
switches, and a louver proving switch. The SMART SYSTEM
will shut off the burner and inhibit relighting whenever any of
these external limits open.
Run-time and alarm outputs
The boiler provides dry contacts for indicating when the boiler
is running, and when it is unable to operate.
Run-time and cycle counting
The control uses two timers to monitor the total hours of
burner operation. One timer monitors the time the boiler is
firing in the Space Heating Mode. The other timer monitors
the time the boiler is firing in the DHW Mode.
The control uses two (2) ignition counters to monitor the
amount of boiler cycles. The first counter counts all ignitions
of the control. The second counter counts only ignition
attempts that have failed.
Service reminder
The control can be programmed for service reminder
notification. This notification will become active when either a
set time frame has expired, or a set amount of running hours or
cycles has expired (all adjustable by the installer). The display
will show a Maintenance Required screen. The installer's name
and phone number can be programmed into the control. This
information will appear on the Maintenance Required screen.
The service reminder notification can be reset or disabled by
the installer.
Error logging
The control will hold in memory the last 10 lockouts as well as
the last 10 blockings. The date and time of the occurrence will
be recorded as well. Only the 10 most current occurrences of
each will be held in memory.
CAUTION
66
This feature of the SMART SYSTEM
control module does not eliminate the
possibility of freezing. The installation
must still use recognized design,
installation and maintenance practice to
prevent freeze potential for the boiler and
system.
Page 67
11 Operating information (continued)
Installation & Operation Manual
Boiler temperature regulation
Operating temperature (target)
The SMART SYSTEM control module senses water
temperature and regulates boiler firing and firing rate to
achieve a target temperature. The target temperature can be
set between 32°F and 190°F.
• Target temperature is calculated as described in the
“Outdoor Reset Operation” section, when the outdoor sensor is connected.
• If the outdoor sensor is not connected, the target
temperature is fixed at SH (1 - 3) set points. An
outdoor sensor fault will remain on the display
screen until the outdoor sensor is reconnected.
High limit operations
The Knight Fire Tube boiler is equipped with adjustable
automatic reset and manual reset high limits. The automatic
reset high limit has a maximum set point of 200°F and the
manual reset high limit has a maximum set point of 210°F.
When the outlet temperature exceeds 200°F, the automatic
high limit action occurs. The boiler shuts down until the
outlet water temperature cools below 190°F, and a 60 second
timer has expired. If the outlet temperature continues to
increase, the manual reset high limit action will occur at
210°F.
9. If the current outlet temperature is below the new MRHL
set point, locate the pinhole (SERVICE button) above the
RESET button on the display board. Insert a thin probe
(such as a paper clip) into the hole and press the button
continuously for five (5) seconds to place the boiler into
Service Mode. In Service Mode, the boiler will fire at
ignition speed and will then modulate up to full fire.
10. Once the outlet temperature rises up to the MRHL set
point, the MRHL will function, causing the boiler to shut
down and lock out.
11. Repeat Steps 2 - 7 to adjust the MRHL to its normal
settings.
Low water cutoff protection
1. The SMART SYSTEM control module uses temperature
sensing of both supply and return areas of the heat
exchanger. If the flow rate is too low or the outlet
temperature too high, the control module modulates and
shuts the boiler down. This ensures boiler shutdown in the
event of low water or low flow conditions.
2. Some codes and jurisdiction may accept these integral
features of the control in lieu of requiring an additional
limit control or low water cutoff. Consult local jurisdiction
to determine. A low water cutoff is available from the
factory.
High limit test procedure
NOTICE
1. Turn ON the main power to the boiler by placing the
ON/OFF switch in the ON position.
2. From the Status Screen, press the NAVIGATION dial to
access the Set Points Screen.
3. Press the LEFT SELECT (LIMITS) key.
4. Select the manual reset high limit (MRHL) by rotating
the NAVIGATION dial counterclockwise, then press
the NAVIGATION dial.
5. Decrease the set point of the MRHL to below the current
outlet temperature (or to its minimum setting, whichever
is higher) by turning the NAVIGATION dial
counterclockwise.
6. Press the RIGHT SELECT [SAVE] key.
7. Press the RIGHT SELECT [HOME] key. The new
parameter will upload to the control.
8. If the current outlet temperature is above the new MRHL
set point, the MRHL will function causing boiler lockout.
If this occurs, skip to Step 11.
Please note that the brackets ([]) denote
screen status.
Outdoor reset operation
Target temperature with outdoor reset
This feature improves the system's efficiency by decreasing set
point as the outdoor temperature increases. Energy Efficiency
Standards require the use of a control that automatically
adjusts set point in relation to heat demand. In the absence
of an external energy management system, this feature MUST
BE used.
See the Knight Fire Tube Boiler Service Manual to change the
settings.
Reset curve
The reset curve looks at outdoor air temperature and adjusts
the set point in relation to heat demand.
67
Page 68
11 Operating information
Installation & Operation Manual
Cascade
When multiple boilers are installed, they can be wired
together in a cascade sequence. A maximum of eight boilers
can be controlled from a single control. In this application
one boiler would be designated as the Leader control and all
others would be designated as Member controls. Member
1 can be configured to take over control of the Cascade
should the Leader stop communicating with the members.
The Leader control can be programmed to use Lead/Lag or
Efficiency Optimization control methods.
Once the Leader boiler receives a call for heat from a room
thermostat, BMS, or ModBus or BACnet, the control will
determine what the set point will be. If outdoor air reset is
desired, connect the outdoor air sensor to the terminals on
the Low Voltage Connection Board on the Leader boiler. The
set point will be calculated based on the programmed reset
curve parameters. See the Knight Fire Tube Boiler Service
Manual to program the reset curve. If outdoor air reset is
not desired, do not connect the outdoor air sensor. A fixed
temperature set point can be programmed into the control.
If the water temperature at the system supply sensor is less
than the set point + the turn-off offset - the off-on differential,
then the control will initiate a call for heat on the Cascade
(see the Knight Fire Tube Boiler Service Manual for an
explanation of the offset and differential). The Leader will
energize the lead boiler on the Cascade. For a new startup this
will be the Leader boiler.
Sequence of the cascade
To equalize the run time of all boilers on the Cascade, the
firing sequence will automatically be changed at set intervals.
During the first 24 hours of operation, the sequence will
change every hour. After that, the sequence will change
every 24 hours. The switching on/off sequence will be as
follows:
TIMESWITCHING ON SEQUENCE
StartL-M1-M2-M3-M4-M5-M6-M7
1 hourM1-M2-M3-M4-M5-M6-M7-L
2 hoursM2-M3-M4-M5-M6-M7-L-M1
After the first 24 hours, the sequence will change every night
at 2:00 a.m. If a boiler locks out or is used to heat an indirect
DHW tank, it will automatically be given the lowest priority
until 2:00 a.m.
DHW, Night Setback, and Ramp Delay operation
with cascade
For Normal Mode DHW operation any boiler(s) in the
Cascade can be selected to provide heat for a DHW call.
Select a boiler to be designated as the DHW boiler. Connect
the DHW thermostat or sensor to the terminals on the Low
Voltage Connection Board marked for the corresponding
device. When the boiler receives a DHW call, the Leader
control will take that boiler out of the Cascade sequence. If
another boiler is available, the Leader will start it up to take
its place.
68
The DHW boiler will adjust its set point to the programmed
DHW boiler set point and will adjust its firing rate to
maintain this. Once the DHW call has been satisfied, the
Leader control will place that boiler back into the Cascade
sequence.
Switching of the boiler between DHW operation and SH
operation when there is a call for both does not occur in
Cascade Mode.
When DHW is programmed for Zone Mode, connect the
DHW thermostat or tank sensor to the Leader boiler. When
a DHW call is received, the Leader will modulate the entire
Cascade to bring the system supply temperature up to the
DHW boiler set point (if higher).
Night Setback operation of the boilers within the Cascade is
available. Programming of the Night Setback will be done
through the Leader boiler. Refer to the Knight Fire Tube
Boiler Service Manual for information regarding Night
Setback.
Ramp Delay operation of the boilers as described in the
Knight Fire Tube Boiler Service Manual is available when the
boilers are part of a Cascade system.
Page 69
11 Operating information (continued)
Sequence of operation
OPERATIONDISPLAY
1. Upon a call for heat, the gas pressure switch(es) must be closed.
2. Once the gas pressure switch(es) are closed, the control turns
on the appropriate pumps (system and boiler pumps for space
heating, DHW pump for DHW). The flow switch and/or LWCO
must close.
Installation & Operation Manual
3. The control turns on power to the louver relay. The Aux (louver
proving) switch, and pressure switch must close.
4. The control starts the prepurge cycle by initiating the blower.
5. The control starts the trial for ignition by firing the spark
electrode and opening the gas valve.
6. If flame is not detected after the sparking ends, the control will
perform a postpurge, then start another prepurge cycle and try
to light the burner again. The control will perform a total of 4
attempts before locking out.
69
Page 70
11 Operating information
Sequence of operation (continued)
OPERATIONDISPLAY
7. If flame is detected, it holds the firing rate steady for a few
seconds to let the flame stabilize, then it begins to modulate the
firing rate based on a set point or some other command (such as
a 0-10V BMS signal).
8. If the space heating call for heat is active, and the tank thermostat
or sensor starts a DHW call for heat, the boiler will switch to the
DHW mode. If programmed for normal DHW operation (not as a
zone), the DHW pump will turn on first, then the boiler pump will
turn off (boiler and DHW pump operation briefly overlap to ensure
flow is maintained through the unit). This will divert the boiler’s
outlet water from the heating system and send it to the tank coil
instead. The control will then modulate to maintain the outlet
temperature to the DHW boiler set point.
Installation & Operation Manual
9. If the boiler is not part of a Cascade, and both the space heating
and DHW calls for heat remain active long enough, the boiler will
switch back and forth between the two heating modes until one of
them is satisfied.
10. Once both calls for heat are satisfied, the control will turn off
the burner. The blower will continue to run during the postpurge
period.
11. Any pumps that are running will continue to run for their respective
pump delay times before turning off, unless programmed to
remain on continuously. A 60 second anti-cycle period will start,
which will delay any new call for heat until it times out.
12. In Standby, ready to start a new cycle.
70
Page 71
Installation & Operation Manual
11 Operating information (continued)
Knight Fire Tube boiler control module
Use the control panel (FIG. 11-1) to set temperatures, operating conditions, and monitor boiler operation.
Figure 11-1 Control Panel
USB Memory Drive
PC Connection
The information on the bottom of the display shows the functions of the two SELECT keys (on either corner), and the
NAVIGATION dial (in the center):
MENU = Left SELECT Key
SETPOINTS = NAVIGATION Dial - Pressing Down
SHDN = Right SELECT Key
Access modes
User
The user can adjust space heating and tank target temperatures
by pressing the NAVIGATION dial when “SETPOINTS” is
flashing at the bottom of the display. The date and time, and
the temperature units can also be changed.
NOTICE
To save parameters and exit programming:
Press the RIGHT SELECT [SAVE] key and then press the
RIGHT SELECT [HOME] key.
To enter a parameter and continue programming:
Please note that the brackets ([]) denote
screen status.
Reset
Installer
Most parameters are available only to the installer, accessible
by entering the installer password, see the Knight Fire Tube
Boiler Service Manual.
Saving parameters (reference the Parameter Table in
the Knight Fire Tube Boiler Service Manual)
Press the RIGHT SELECT [SAVE] key 1 time to return to the
parameter listings; press again to return to the menu listings.
Remember to press the RIGHT SELECT [HOME] key when
finished programming in order to save the changes made.
See the Knight Fire Tube Boiler Service Manual for a detailed
description of parameters and access modes.
71
Page 72
11 Operating information
Figure 11-2 Status Display Screen
Installation & Operation Manual
A
(BOILER
STATUS)
B
(CALL FOR
HEAT)
C
(OPERATIONAL
INFORMATION)
D
(LEFT SELECT
KEY)
(RIGHT SELECT KEY)
E
(NAVIGATION DIAL)
Status Display Screens
NOTE: All screens show burner status, heat demands, lockout/blocking, pump status, and soft keys.
SectionDisplayDescription
STANDBY
STARTThe unit has begun a burn cycle and is checking all safety circuits.
The unit has not received a call for heat from a remote thermostat
nor has it received a call for heat from a DHW thermostat.
F
A
(Boiler Status
Bar)
B
(Call for Heat
Indicators)
PREPURGEThe unit has initiated a prepurge period on a call for heat.
IGNITIONThe unit has begun a spark period to ignite the main burner.
The unit has fired and is running at the displayed percentage.
%
The call for heat has been satisfied and the unit runs the fan for an
POSTPURGE
SHUTDOWNThe unit has been placed in the OFF position.
SETPOINT METThe controlled temperature has exceeded its set point and its offset.
BLOCKED
additional postpurge period to clear the combustion chamber and
vent system of residual flue products.
The unit has detected a condition that has temporarily interrupted
the current call for heat.
Room Thermostat 1 has a call for heat.
Room Thermostat 2 has a call for heat.
Room Thermostat 3 has a call for heat.
The tank thermostat or sensor has a call for heat.
Indicates which room thermostat demand has priority.
The unit is being controlled by a 0 - 10V BMS signal.
The member unit is supplying heat while in Cascade Mode.
72
Page 73
11 Operating information (continued)
Status Display Screens (cont’d)
NOTE: All screens show burner status, heat demands, lockout/blocking, pump status, and soft keys.
SectionDisplayDescription
a. SYSTEM TEMP
b. TANK TEMP
c. OUTDOOR TEMP
DETAILS SCREEN 1
DETAILS SCREEN 2
d. INLET TEMP
e. OUTLET TEMP
f. DHW RECIRC TEMP - The temperature read by the DHW
recirculation sensor (if connected).
a. DELTA T
b. FLUE TEMP
c. FLAME CURRENT
d. FAN SPEED
e. LOOP 1 TEMP - The temperature of Loop 1 reported by the
MTLC control.
f. LOOP 2 TEMP - The temperature of Loop 2 reported by the
MTLC control.
g. LOOP 3 TEMP - The temperature of Loop 3 reported by the
MTLC control.
Installation & Operation Manual
C
(Operational
Information)
I/O SCREEN
BMS SCREEN
HISTORY SCREEN
LAST 10 FAULTS
a. GAS PRESS SW - The state of the gas pressure switch.
b. FLOW SW - The state of the flow switch.
c. LOUVER RELAY - The state of the louver relay output.
d. AUX CONTACT - The state of the auxiliary equipment or louver
proving switch.
e. BLOCKED DRAIN - The state of the blocked drain switch.
f. GAS VALVE - The state of the gas valve output.
a. 0 - 10V BMS IN
b. 0 - 10V RATE OUT
c. BMS ADDRESS
d. BMS CONTROL?
e. SYS PUMP SPEED
f. BLR PUMP OUT
a. SH RUN TIME - Total time running for Space Heat (SH).
b. SH CYCLES - Total Space Heat (SH) demand cycles.
c. DHW RUN TIME - Total time running for DHW.
d. DHW CYCLES - Total DHW demand cycles.
e. POWER TIME - Total time powered ON.
f. IGNITIONS - Total number of successful ignitions.
g. IGN ATTEMPTS - Total number of ignition attempts.
a. FAULT NO.
b. FAULT
c. DATE
d. TIME
73
Page 74
11 Operating information
Status Display Screens (cont’d)
NOTE: All screens show burner status, heat demands, lockout/blocking, pump status, and soft keys.
SectionDisplayDescription
Installation & Operation Manual
C
(Operational
Information
cont.)
D
(LEFT SELECT
key function)
E
(NAVIGATION
dial function)
F
(RIGHT SELECT
key function)
a. CASCADE STATUS
CASCADE STATUS
NIGHT SETBACK
USBPress the LEFT SELECT key to access the USB and Installer menu.
MODIFY
SHDNPress the RIGHT SELECT key to turn the boiler OFF.
ONPress the RIGHT SELECT key to turn the boiler ON.
NOPress the RIGHT SELECT key to cancel the shutdown operation.
SAVEPress the RIGHT SELECT key to save the current change.
b. CASCADE POWER
c. PRESENT
a. TRIGGER 1 - Next Space Heat (SH) night setback trigger.
b. TRIGGER 2 - Next DHW night setback trigger.
Pressing the NAVIGATION dial will allow the installer to change
the text.
74
HOME
Press the RIGHT SELECT key to return to the Status Screen and
upload parameter changes.
Page 75
12 Maintenance
Maintenance and annual startup
Table 12A Service and Maintenance Schedules
Installation & Operation Manual
Service technician
(see the following pages for instructions)
General:
• Address reported problems
• Inspect interior; clean and vacuum if
necessary;
• Clean condensate trap and fill with fresh
water
• Check for leaks (water, gas, flue,
condensate)
• Verify flue and air lines in good condition
and sealed tight
• Check system water pressure/system
piping/expansion tank
• Check fill water meter
• Test boiler water. When test indicates,
clean system water with approved
system restorer following manufacturer’s
information.
• Check control settings
ANNUAL START-UP
• Check ignition and flame sense
electrodes (sand off any deposits; clean
and reposition)
• Check wiring and connections
• Perform start-up checkout and
performance verification per Section 10
of this manual.
• Flame inspection (stable, uniform)
• Flame signal (at least 10 microamps at
high fire)
• Clean the heat exchanger if flue
temperature is more than 54°F above
return water temperature.
Owner maintenance
(see the Knight Fire Tube User’s Information Manual
for instructions)
• Check boiler area
Daily
Monthly
Periodically
Every
6 months
• Check pressure / temperature
gauge
• Check vent piping
• Check air piping
• Check air and vent termination
screens
• Check relief valve
• Check condensate drain system
• Check air vents
• Test low water cutoff (if used)
• Reset button (low water cutoff)
• Check boiler piping (gas and
water) for leaks
• Operate relief valve
If combustion or performance
indicate need:
• Clean heat exchanger
• Remove and clean burner using
compressed air only
• Clean the blower wheel
End
of season
months
• Shut boiler down (unless boiler
used for domestic hot water)
75
Page 76
12 Maintenance
R
Installation & Operation Manual
WARNING
Follow the service and maintenance procedures given throughout this manual and in component literature
shipped with the boiler. Failure to perform the service and maintenance could result in damage to the boiler
or system. Failure to follow the directions in this manual and component literature could result in severe
personal injury, death, or substantial property damage.
WARNING
The boiler should be inspected annually only by a qualified service technician. In addition, the maintenance
and care of the boiler designated in Table 12A and explained on the following pages must be performed to
assure maximum boiler efficiency and reliability. Failure to service and maintain the boiler and system could
result in equipment failure.
WARNING
Electrical shock hazard – Turn off power to the boiler before any service operation on the boiler except as
noted otherwise in this instruction manual. Failure to turn off electrical power could result in electrical shock,
causing severe personal injury or death.
Address reported problems
1. Inspect any problems reported by the owner and correct
before proceeding.
Inspect boiler area
1. Verify that boiler area is free of any combustible materials,
gasoline and other flammable vapors and liquids.
2. Verify that air intake area is free of any of the contaminants
listed in Section 1 of this manual. If any of these are
present in the boiler intake air vicinity, they must be
removed. If they cannot be removed, reinstall the air
and vent lines per this manual and the Knight Fire Tube
Boiler Service Manual.
Annual cleaning:
1. The condensate trap should be cleaned at least once
annually, or at the end of each heating season, by removing
the bottom cap and cleaning out any sediment that exists.
2. The provided condensate trap is equipped with a ball
that acts as a seal against harmful flue gases escaping in
case there is no condensate in the trap. If this ball is not
present, flue gases may be able to pass through the trap
when there is no condensate present, resulting in an unsafe
environment. It is important to check and make sure the
ball is still located in the trap, acting as a seal against flue
gases at least once annually and after every cleaning.
3. After the condensate trap is cleaned or serviced, it must be
checked to ensure that it is installed and draining properly.
Reference Section 9 - Condensate Disposal for installation
instructions.
Inspect boiler interior
1. Remove the front access cover and inspect the interior of
the boiler.
2. Vacuum any sediment from inside the boiler and
components. Remove any obstructions.
Clean condensate trap
1. Inspect the condensate drain line, condensate PVC
fittings, and condensate trap.
Monthly inspection:
1. The condensate trap should be inspected monthly to
ensure the trap is properly installed and connected to the
condensate pipe under the boiler, see FIG. 12-1.
2. The condensate line should be inspected monthly
for obstructions, making sure it allows free flow for
condensate to drain.
3. Inspect the neutralizing kit (if installed) monthly to
ensure the condensate is draining properly, and there is
still an adequate amount of neutralizing agent available.
76
Figure 12-1 Condensate Trap
COMPRESSION
FITTING
GASKET
RETAINING
RING
FLOAT BALL
REMOVABLE
CAP TO CLEAN
OUT TRAP
DIR #2000556918 00
DI
CONDENSATE
DRAIN
Check all piping for leaks
WARNING
1. Inspect all water and gas piping and verify to be leak free.
2. Look for signs of leaking lines and correct any problems
found.
3. Check gas line using the procedure found in Section 7
- Gas Connections.
Eliminate all system or boiler leaks.
Continual fresh makeup water will
reduce boiler life. Minerals can build
up in sections, reducing heat transfer,
overheating heat exchanger, and causing
heat exchanger failure. Leaking water may
also cause severe property damage.
Page 77
12 Maintenance (continued)
Installation & Operation Manual
Flue vent system and air piping
1. Visually inspect the entire flue gas venting system and air
piping for blockage, deterioration or leakage. Repair any
joints that show signs of leakage. Verify that air inlet pipe
is connected and properly sealed.
2. Verify that boiler vent discharge and air intake are clean
and free of obstructions.
WARNING
Failure to inspect for the above conditions
and have them repaired can result in
severe personal injury or death.
Check water system
1. Verify all system components are correctly installed and
operational.
2. Check the cold fill pressure for the system. Verify it is
correct (must be a minimum of 12 psi).
3. Watch the system pressure as the boiler heats up (during
testing) to ensure pressure does not rise too high.
Excessive pressure rise indicates expansion tank sizing or
performance problem.
4. Inspect automatic air vents and air separators. Remove
air vent caps and briefly press push valve to flush vent.
Replace caps. Make sure vents do not leak. Replace any
leaking vents.
Check expansion tank
1. Expansion tanks provide space for water to move in
and out as the heating system water expands due to
temperature increase or contracts as the water cools.
Tanks may be open, closed or diaphragm or bladder
type. See Section 6 - Hydronic Piping for suggested best
location of expansion tanks and air eliminators.
Check fill water meter
1. Check fill water meter for water usage. If the amount
exceeds 5% of your system volume, you could have a
leak. Have the system checked for leaks and fixed by a
qualified service technician.
Check boiler relief valve
1. Inspect the relief valve and lift the lever to verify flow.
Before operating any relief valve, ensure that it is piped
with its discharge in a safe area to avoid severe scald
potential. Read Section 6 - Hydronic Piping before
proceeding further.
WARNING
WARNING
Safety relief valves should be re-inspected
AT LEAST ONCE EVERY THREE
YEARS, by a licensed plumbing contractor
or authorized inspection agency, to ensure
that the product has not been affected
by corrosive water conditions and to
ensure that the valve and discharge line
have not been altered or tampered with
illegally. Certain naturally occurring
conditions may corrode the valve or its
components over time, rendering the
valve inoperative. Such conditions are
not detectable unless the valve and its
components are physically removed and
inspected. This inspection must only
be conducted by a plumbing contractor
or authorized inspection agency – not
by the owner. Failure to re-inspect the
boiler relief valve as directed could result
in unsafe pressure buildup, which can
result in severe personal injury, death, or
substantial property damage.
Following installation, the valve lever
must be operated AT LEAST ONCE
A YEAR to ensure that waterways
are clear. Certain naturally occurring
mineral deposits may adhere to the valve,
rendering it inoperative. When manually
operating the lever, water will discharge
and precautions must be taken to avoid
contact with hot water and to avoid water
damage. Before operating lever, check
to see that a discharge line is connected
to this valve directing the flow of hot
water from the valve to a proper place
of disposal. Otherwise severe personal
injury may result. If no water flows, valve
is inoperative. Shut down the boiler until
a new relief valve has been installed.
Test boiler water
1. Test boiler water. Reference the Knight Fire Tube
Installation and Operation Manual for guidelines. When
test indicates, clean system water with approved system
restorer following the manufacturer’s information.
2. After following the above warning directions, if the relief
valve weeps or will not seat properly, replace the relief
valve. Ensure that the reason for relief valve weeping is
the valve and not over-pressurization of the system due
to expansion tank waterlogging or undersizing.
77
Page 78
12 Maintenance
Installation & Operation Manual
Inspect ignition and flame sense
electrodes
1. Remove the ignition and flame sense electrodes from the
boiler heat exchanger access cover.
2. Remove any deposits accumulated on the ignition/flame
sense electrode using sandpaper. If the electrodes cannot
be cleaned satisfactorily, replace with new ones.
3. Replace ignition/flame sense electrode, making sure
gasket is in good condition and correctly positioned.
Check ignition ground wiring
1. Inspect boiler ground wire from the heat exchanger
access cover to ground terminal strip.
2. Verify all wiring is in good condition and securely
attached.
3. Check ground continuity of wiring using continuity
meter.
Check burner flame
1. Inspect flame through observation window.
2. If the flame is unsatisfactory at either high fire or low fire,
turn off boiler and allow boiler to cool down. Remove the
burner and clean it thoroughly using a vacuum cleaner or
compressed air. Do not use compressed air to clean burner
if performed inside a building.
3. Remove the burner, reference FIG. 12-2 below.
4. When replacing the burner, ensure gasket is in good
condition and positioned correctly (FIG. 12-2).
Figure 12-2 Burner Assembly
FAN TOP PLATE
GASKET
FIBER BOARD
4. Replace ground wires if ground continuity is not
satisfactory.
Check all boiler wiring
1. Inspect all boiler wiring, making sure wires are in good
condition and securely attached.
Check control settings
1. Set the SMART SYSTEM control module display to
Parameter Mode and check all settings. See Section 1 of
Knight Fire Tube Boiler Service Manual. Adjust settings
if necessary. See Section 1 of the Knight Fire Tube Boiler
Service Manual for adjustment procedures.
2. Check settings of external limit controls (if any) and
adjust if necessary.
Perform start-up and checks
1. Start boiler and perform checks and tests specified in
Section 10 - Start-up.
2. Verify cold fill pressure is correct and that operating
pressure does not go too high.
GASKET
BURNER
HEAT
EXCHANGER
DIR #2000507916 00
Check flame signal
1. At high fire the flame signal shown on the display should
be at least 10 microamps.
2. A lower flame signal may indicate a fouled or damaged
flame sense electrode. If cleaning the flame sense electrode
does not improve, ground wiring is in good condition, and
ground continuity is satisfactory, replace the flame sense
electrode.
3. See Section 3 - Troubleshooting of the Knight Fire Tube
Boiler Service Manual for other procedures to deal with
low flame signal.
78
Page 79
12 Maintenance (continued)
Installation & Operation Manual
Review with owner
1. Review the Knight Fire Tube Boiler User’s Information
Manual with the owner.
2. Emphasize the need to perform the maintenance
schedule specified in the Knight Fire Tube Boiler User’s
Information Manual (and in this manual as well).
3. Remind the owner of the need to call a licensed contractor
should the boiler or system exhibit any unusual behavior.
4. Remind the owner to follow the proper shutdown
procedure and to schedule an annual start-up at the
beginning of the next heating season.
Cleaning boiler heat exchanger
1. Shut down boiler:
• Follow the “To Turn Off Gas to Appliance” instructions
for the boiler in Section 10 - Startup.
• Do not drain the boiler unless it will be exposed to
freezing temperatures. If using freeze prevention fluid
in system, do not drain.
2. Allow time for the boiler to cool to room temperature if
it has been firing.
WARNING
10. Disconnect the condensate hose from the condensate trap
and route to drain.
11. Use a vacuum cleaner to remove any accumulation on the
boiler heating surfaces. Do not use any solvent.
12. Using a clean cloth dampened with warm water, wipe out
the combustion chamber. Rinse out debris with a low
pressure water supply.
13. Allow the heat exchanger to thoroughly dry.
14. Reassemble the unit in reverse order of component
removal, and re-install the condensate hose.
CAUTION
The boiler contains ceramic fiber
materials. Use care when handling these
materials per instructions in the Service
Manual. Failure to comply could result in
severe personal injury.
Damaged gaskets and seals in the
system can result in substantial property
damage. Ensure that damaged or torn
gaskets are replaced.
3. Remove the top and front access panels (no tools
required for removal) along with the bezel.
4. Remove the wiring from the ignitor, flame rod, and the
fan. Remove the reference tubing from the air intake.
5. Loosen the band clamp on the air intake coupling using
a field provided 5/16" driver.
6. Remove the 4mm screws holding the fan to the heat
exchanger top plate.
7. Loosen the union on the venturi
8. The fan and the venturi may now be removed from the
unit together by sliding the fan away from the air intake.
9. Remove the 10mm nuts securing the heat exchanger top
plate to gain access to the heat exchanger and set aside.
15. Perform a combustion analysis by following the
instructions in Section 10 - Startup - Check Flame of this
manual.
16. Resume operation.
79
Page 80
13 Diagrams
Figure 13-1 Ladder Diagram
120VAC
TERMINAL STRIP
120V SUPPLY "L"
ON / OFF
SWITCH
PC INTERFACE
21
ALARM
BELL
22
16
SWITCH
SILENCING
7
ALARM
CONTACTS
RUN-TIME
CONTACTS
SYSTEM
SENSOR
OUTDOOR
SENSOR
TANK
SENSOR
SHIELD
A
CASCADE
B
SHIELD
BMS
+
IN
+
SYS PUMP
IN
+
BLR PUMP
OUT
+
RATE
OUT
-
SHIELD
A
MODBUS
B
SHIELD
DHW RECIRC
SENSOR
X4-3
CN5-5
S6
S5
S4
0-10V
0-10V
0-10V
0-10V
X1-6
X5-9
120 VAC
OUTLET
INTEGRATED CONTROL
F2
3.15A
F1
6.3A
F3
.8A
120 VAC
24 VAC
9
19
1
3
17
5
15
7
13
11
10
13
INLET
SENSOR
OPERATING
SENSOR
HIGH LIMIT
SENSOR
FLUE
SENSOR
FLUE
SENSOR
CONNECTION
BOARD
21
22
19
20
23
24
26
27
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
29
30
JUNCTION BOX
SYSTEM PUMP
RELAY
BOILER PUMP
DHW PUMP
24V DC
SUPPLY
LOW GAS
PRESSURE
SWITCH
AUX (LOUVER)
PROVING SWITCH
S2
S1a
S1b
S3a
S3b
CN6
CN8-1
CN8-2 X6-2
CN8-3
CN6
RELAY
RELAY
FLOW
SWITCH
HEAT/LOOP
DEMAND
HEAT/LOOP
DEMAND
HEAT/LOOP
DEMAND
TANK
THERMOSTAT
HIGH GAS
PRESSURE
SWITCH
RIBBON CABLE
CN5-1
CN5-9
CN5-2
CN5-10
CN6
CN6
CN6
CN6
CN6
CN6
CN6
CN6
CN6
CN6
CN6
CN6
CN6
M
O
X4-1
X6-1
D
X4-2
B
U
X6-3
X4-3
S
X1-1
X5-1
1
2
3
X5-6
X5-4
X5-12
X5-5
X5-13
X5-14
X4-7
X4-14
X4-6
X4-13
X6
X6
X6
X6
X6
X6
X6
X6
X6
X6
X6
X6
X6
X6
X6
SYSTEM
PUMP "L"
X1-2
BOILER
PUMP "L"
X1-4
DHW
PUMP "L"
X1-3
TERMINAL
STRIP
CONNECTION BOARD
10
2
4
6
8
12
9
14
INTEGRATED
CONTROL
X7
X9-2
X9-1
X9-3
Installation & Operation Manual
NEUTRAL
TERMINAL STRIP
120V SUPPLY "N"
12
CN5-15 X4-8
CN5-11
CN5-7 X4-1
CN5-14
CN5-6
CN5-13
CN5-4 X4-4
CN5-12
CN5-3
CN5-16
X5-2
X5-10
X5-11
X5-11
X2-2
X2-1
1
2
4
5
TR2
X1-7
FLAME ROD
X4-12
X4-9
X4-2
X4-10
X4-11
X4-5
X5-3
X5-7
X5-16
X5-8
X5-15
BLOWER
3
INTEGRATED
CONTROL
GAS VALVE
RELAY
BOX DEPICTS
OPTIONAL ITEMS
LOW VOLTAGE
120 VAC
HIGH VOLTAGE
GND
SYSTEM
PUMP "N"
GND
SYSTEM
PUMP
BOILER
PUMP "N"
GND
BOILER
PUMP
DHW
PUMP "N"
TERMINAL
STRIP
DHW
PUMP
LWCO
CN7-3
CN7-1
RELAY COIL
DHW RECIRC
RELAY COIL
PRESSURE
SWITCH
GAS VALVE
24 VAC
LOUVER
24VAC
AIR
BLOWER
SPARK
CN7-4
CN7-2
15
16
17
8
18
ROD
CAUTION HIGH VOLTAGE SPARK LEAD
NOTES:
1. Where possible, swi tches are shown without utilities (gas, water or
electricity) connected to the unit. As such, actual switch states may
vary from those show n on diagrams depending upon whether utilities
are connected or a fault condition is present.
2. See wiring diagram for additional notes.
GROUND
LADDER DIAGRAM
100303856 REV A
80
Page 81
13 Diagrams (continued)
Figure 13-2 Wiring Diagram
Installation & Operation Manual
LOW VOLTAGE
120 VAC
HIGH VOLTAGE
CONNECTION
BOARD
24 VAC DHW RECIRC
PUMP RE LAY COIL
BELL JUMPER
ALARM BELL
PROVING SWITCH
SILENCING SWITCH
OUTDOOR
GROUNDING
Notes:
1. All w iring must b e installed i n accordan ce with: loc al, state, provincial and national code requi rements p er either N.E. C. in USA or C.S.A. in Canada.
2. If any original eq uipment w ire as suppli ed with
minim um of 105°C. Exception s: Replacement high v o
or ribbo n cables can l ead to oper ational pro blems w
3. Actu al connector block locati ons may var y from those shown on di agrams. R efer to actu al component s for prop er connector block locations when using
diagram s to troubl eshoot unit .
ALARM
CONTACTS
RUN-TIME
CONTACTS
24 VAC LOUVER
RELAY COIL
AUX (LOUVER)
GAS PRESSURE
SWITCH
LOW
WATER
CUT-OFF
FLOW
SWITCH
TANK
THERMOSTAT
HEAT/LOOP
DEMAND
HEAT/LOOP
DEMAND
HEAT/LOO P
DEMAND
SYSTEM
SENSOR
SENSOR
TANK
SENSOR
SHIELD
SHIELD
DHW
RECIRC
BMS
SYS PUMP
BLR PUMP
OUT
RATE
OUT
MODBUS
OPTION
A
B
IN
IN
SHIELD
SHIELD
CASCADE
SENSOR
SHIELD
JUMPER
+
-
+
-
+
-
+
-
A
B
24 VAC
COM
3
2
1
0-10V
0-10V
0-10V
0-10V
17
18
21
22
19
20
15
16
13
14
11
12
CN7-1
CN7-2
CN7-3
CN7-4
9
10
7
8
5
6
3
4
1
2
23
24
26
27
31
32
33
34
35
36
30
29
37
38
39
40
41
42
43
44
45
46
47
48
MODBUS BOARD
X5-1
X5-2
the appliance must be replaced, it must be replaced with wire having same wire gauge (AWG) and rated for a
ltage spark lead and ribb on cables must be purchased from the fa ctory. Use of a non-approved spark lead
hich could result i n non-repair able damag e to the int egrated controller or ot her compo nents.