This manual supplies information for the installation,
operation, and servicing of the appliance. It is strongly
recommended that this manual be reviewed completely
before proceeding with an installation. Perform steps in
the order given. Failure to comply could result in severe
personal injury, death, or substantial property damage.
The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or
to important information concerning the life of the product.
DANGER
WARNING
CAUTION
CAUTION
NOTICE
2
DANGER indicates an imminently hazardous situation which, if not avoided, will result in death or serious
injury.
WARNING indicates a potentially hazardous situation which, if not avoided, could result in death or serious
injury.
CAUTION indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate
injury.
CAUTION used without the safety alert symbol indicates a potentially hazardous situation which, if not
avoided, may result in property damage.
NOTICE indicates special instructions on installation, operation, or maintenance that are important but not
related to personal injury or property damage.
Please read before proceeding
Installation & Service Manual
NOTICE
WARNING
This is a gas appliance and should be installed
by a licensed electrician and/or certified gas
supplier. Service must be performed by a
qualified service installer, service agency or
the gas supplier.
If the information in these instructions is
not followed exactly, a fire or explosion may
result causing property damage, personal
injury, or death.
This appliance MUST NOT be installed in
any location where gasoline or flammable
vapors are likely to be present, unless the
installation is such to eliminate the probable
ignition of gasoline or flammable vapors.
What to do if you smell gas –
• Do not try to light any appliance.
• Do not touch any electric switch; do not
use any phone in your building.
• Immediately call your gas supplier from a
near by phone. Follow the gas supplier’s
instructions.
• If you cannot reach your gas supplier, call
the fire department.
WARNING
Improper installation, adjustment, alteration,
service or maintenance can result in severe
personal injury, death, or substantial
property damage. Refer to this manual
for assistance or additional information,
consult a qualified installer, service agency
or the gas supplier.
Checking equipment –
Upon receiving equipment, check for signs of shipping
damage. Pay particular attention to parts accompanying the
appliances which may show signs of being hit or otherwise
being mishandled. Verify total number of pieces shown on
the packing slip with those actually received. In case there is
damage or a shortage, immediately notify the carrier.
Do not use this appliance if any part has been under water.
The possible damage to a flooded appliance can be extensive
and present numerous safety hazards. Any appliance that has
been under water must be replaced.
Owner warning –
NOTE: Retain this manual for future reference.
The information contained in this manual is intended for use
by qualified professional installers, service technicians, or gas
suppliers. Consult your local expert for proper installation
or service procedures.
Installation and service must be performed
by a qualified installer, service agency, or the
gas supplier.
Warranty –
Installation and service must be performed by a qualified
service installer, service agency or the gas supplier.
Factory warranty (shipped with unit) does not apply to units
improperly installed or improperly operated.
Experience has shown that improper installation or system
design, rather than faulty equipment, is the cause of most
operating problems.
1. Excessive water hardness causing a lime/scale build-up in
the copper tube is not the fault of the equipment and
is not covered under the manufacturer’s warranty
(see Water Treatment and Water Chemistry).
2. Excessive pitting and erosion on the inside of the copper
tube may be caused by too much water velocity through
the tubes and is not covered by the manufacturer’s
warranty (see Boiler Flow Rates and Temperature Rise for flow requirements).
IMPORTANT
Your conventionally vented gas appliance must have a supply
of fresh air circulating around it during burner operation for
proper gas combustion and proper venting.
WARNING
Consult and follow all local Building and
Fire Regulations and other Safety Codes
that apply to this installation. Consult your
local gas utility company to authorize and
inspect all gas and flue connections.
Should overheating occur or the gas supply
fail to shut off, do not turn off or disconnect
the electrical supply to the pump. Instead,
shut off the gas supply at a location external
to the appliance.
33
Please read before proceeding
Installation & Service Manual
WARNING
To minimize the possibility of serious
personal injury, fire, or damage to your
appliance, never violate the following safety
rules:
1. Boilers are heat producing appliances. To
avoid damage or injury, do not store
materials against the appliance or the
vent-air intake system. Use proper care
to avoid unnecessary contact (especially
children) with the appliance and vent-air
intake components.
2. Never cover your appliance, lean
anything against it, store trash or debris
near it, stand on it or in any way block
the flow of fresh air to your appliance.
3. UNDER NO CIRCUMSTANCES must
flammable materials such as gasoline or
paint thinner be used or stored in the
vicinity of this appliance, vent-air intake
system or any location from which fumes
could reach the appliance or vent-air
intake system.
Codes –
The equipment shall be installed in accordance with those
installation regulations in force in the local area where the
installation is to be made. These regulations shall be carefully
followed in all cases. Authorities having jurisdiction shall be
consulted before installations are made. In the absence of
such requirements, the installation shall conform to the latest
edition of the National Fuel Gas Code, ANSI Z223.1. Where
required by the authority having jurisdiction, the installation
must conform to American Society of Mechanical Engineers
Safety Code for Controls and Safety Devices for Automatically
Fired Boilers, ASME CSD-1. All boilers conform to the latest
edition of the ASME Boiler and Pressure Vessel Code, Section
IV. Where required by the authority having jurisdiction,
the installation must comply with the Canadian Association
Code, CAN/CGA-B149.1 and/or B149.2 and/or local codes.
This appliance meets the safe lighting performance criteria
with the gas manifold and control assembly provided as
specified in the ANSI standards for gas-fired appliances, ANSI
Z21.13 and ANSI Z21.10.3.
Boiler water –
Thoroughly flush the system to remove debris. Use an approved
pre-commissioning cleaner (see Start-Up Section), without the
boiler connected, to clean the system and remove sediment.
The high-efficiency heat exchanger can be damaged by build-up
or corrosion due to sediment.
NOTE: Cleaners are designed for either new systems or
pre-existing systems. Choose accordingly.
Prevention of freezing –
Heat exchangers and headers damaged by freezing are not
covered by warranty.
See Section 6, Start-Up - Freeze Protection for more information.
4
Ratings
Installation & Service Manual
Solution Boiler
AHRI Rating
Model Number
Note: Change
“N” to “L”
for LP gas
models
CBN04523453732
CBN07538756254
CBN09045907565
CBN1356813511297
CBN18090180149130
CBN215108215178155
CBN260130260216188
NOTICE
Maximum allowed working pressure is located on the rating plate.
Input MBH
(Note 4)
MinMax
Gross
Output
MBH
(Note 1,5)
Net
AHRI
Ratings
Water,
MBH
(Note 1,5)
Other Specifications
Boiler Water
Content
Gallons
0.871 1/2"1/2"4"
0.911 1/2"1/2"5"
0.911 1/2"1/2"5"
0.951 1/2"1/2"6"
0.991 1/2"3/4"7"
1.021 1/2"3/4"7"
1.062"3/4"8"
Water
Connections
Gas
Connections
Vent
Size
(Note 3)
Notes:
1. The ratings are based on standard test procedures
prescribed by the United States Department of Energy.
2. Net AHRI ratings are based on net installed radiation of
sufficient quantity for the requirements of the building
and nothing need be added for normal piping and pickup.
Ratings are based on a piping and pickup allowance of 1.15.
3. Use only the vent materials and methods specified in the
Installation and Service Manual.
4. The Solution is orificed for operation up to 2000 feet
altitude. The ap pli ance will be derated 4% per 1000
feet above 2000 feet el e va tion. Consult the factory for
installations above 2000 feet elevation.
5. Ratings have been confirmed by the Hydronics Section of
AHRI.
UNIT EQUIPPED FOR
HIGH ALTITUDE
UP TO 2000 FT.
Figure A High Altitude Label Location
5
The Solution - How it works...
Installation & Service Manual
1. Control panel cover
The control panel cover provides access to the thermostat, ignition
module, and transformer.
2. Burner (not shown)
The burner is a cylindrical stainless steel tube used to regulate
burner flame.
3. Drain port
Location from which the heat exchanger can be drained.
4. Flue outlet
The flue outlet allows the connection of the vent pipe to the unit.
5. Gas connection
The gas pipe connection on this appliance is 1/2", or 3/4" NPT. To
deliver the correct amount of gas volume to the appliance it may
be necessary to have a larger gas line reduced at the appliance.
Please reference the National Fuel Gas Code charts for more
details.
6. Gas valve
The gas valve allows the proper amount of gas to pass into the
burner for combustion.
7. Heat exchanger
The heat exchanger allows system water to flow through specially
designed tubes for maximum heat transfer. The glass lined
headers and copper finned tubing are encased in a jacket that
contains the combustion process.
8. High limit sensor
Device that monitors the outlet water temperature to ensure
safe operation. If the temperature exceeds its setting, it will break
the control circuit, shutting the appliance down.
9. Ignition module
The ignition module responds to a call for heat signal to provide
burner operation.
16. Sight Glass
The sight glass provides a view of the burner surface, burner flame,
and the pilot flame.
17. Temperature and pressure gauge
The temperature and pressure gauge monitors the outlet
temperature of the appliance as well as the system water
pressure.
18. Temperature sensor
This sensor monitors inlet water temperature. If selected as the
controlling sensor, the appliance will maintain the set point at this
sensor.
19. Terminal strip
The boiler is equipped with a terminal strip on the left side of the
unit to allow easy connection to contact points.
20. Top panel
Removable panel to gain access to the internal components.
21. Thermostat
The thermostat monitors the water temperature via a temperature
sensor and will initiate a call for heat when the water temperature
drops below the set point plus the differential on the thermostat.
22. Transformer
The transformer reduces 120 VAC supply voltage to 24 VAC for the
control circuit.
23. Water inlet (system return)
The water inlet is a 1 1/2" pipe connection that receives water
from the system and delivers it to the heat exchanger.
24. Water outlet (system supply)
The water outlet is a 1 1/2" pipe connection that supplies
water to the system with connections for a flow switch, a relief
valve, and a temperature and pressure gauge.
10. Junction box
The junction box contains the connection points for the line
voltage power and all pumps.
11. Performance loop
A pumped bypass provides constant flow through the heat
exchanger when the building system flow is reduced.
12. Performance Loop Pump
The pump ensures adequate flow to operate the unit.
13. Pilot (not shown)
The pilot is a spark ignition device used to light a pilot flame which
in turn is used to light the main burners.
14. Pump relay
The pump relay energizes the pump on a call for heat.
15. Relief valve
The relief valve is a safety device that ensures the maximum
pressure of the appliance is not exceeded.
6
25. Gas manifold pipe
Delivers gas from the gas valve to the main burners through a
number of orifices.
The Solution - How it works... (continued)
Installation & Service Manual
10
17
15
8
3
5
Models 45,000 - 90,000 Btu/hr Front View
4
20
1
19
Models 45,000 - 90,000 Rear View
23
11
14
16
25
22
21
7
18
9
12
6
24
Models 45,000 - 90,000 Right Side (inside unit)
Models 45,000 - 90,000 Left Side (inside unit)
7
The Solution - How it works...
Installation & Service Manual
10
17
15
8
3
5
Models 135,000 - 260,000 Btu/hr Front View
4
1
19
20
Models 135,000 - 260,000 Btu/hr Rear View
11
23
14
21
25
22
Models 135,000 - 260,000 Btu/hr Right Side (inside unit)
7
9
3
3
Models 135,000 - 260,000 Btu/hr Left Side (inside unit)
18
12
6
24
8
1 Determine boiler location
Installation & Service Manual
Location of unit
1. Locate the appliance so that if water connections should
leak, water damage will not occur. When such locations
cannot be avoided, it is recommended that a suitable drain
pan, adequately drained, be installed under the appliance.
The pan must not restrict combustion air flow. Under no
circumstances is the manufacturer to be held responsible
for water damage in connection with this appliance, or
any of its components.
2. The appliance must be installed indoors where it is
protected from exposure to wind, rain and weather.
3. The appliance must be installed so that the ignition
system components are protected from water (dripping,
spraying, rain, etc.,) during appliance operation and
service (circulator replacement, control replacement,
etc.,).
4. Appliances located in a residential garage and in adjacent
spaces that open to the garage and are not part of the
living space of a dwelling unit must be installed so that
all burners and burner ignition devices have a minimum
clearance of not less than 18" (46cm) above the floor. The
appliance must be located or protected so that it is not
subject to physical damage by a moving vehicle.
Combustion and ventilation air
requirements for conventionally vented
appliances
Provisions for combustion and ventilation air must be in
accordance with, Air for Combustion and Ventilation, of the
latest edition of the National Fuel Gas Code, ANSI Z223.1, in
Canada, the latest edition of CGA Standard B149 Installation
Code for Gas Burning Appliances and Equipment, or
applicable provisions of the local building codes.
The room where the appliance is installed MUST be provided
with properly sized openings to assure adequate combustion
air and proper ventilation when the appliance is installed with
conventional venting.
Installation & Service Manual
Figure 1-4_Combustion Air Through Ducts
2. If combustion and ventilation air is taken from the
outdoors using a duct to deliver the air to the room where
the appliance is installed, each of the two openings should
be sized based on a minimum free area of one square inch
per 2000 Btu/hr (11cm2 per kW) (see FIG. 1-4).
Figure 1-3_Combustion Air Direct from Outside
1. If air is taken directly from outside the building with no
duct, provide two permanent openings (see FIG. 1-3):
(a) Combustion air opening, with a minimum free
area of one square inch per 4000 Btu/hr input
(5.5 cm2 per kW). This opening must be
located within 12" (30 cm) of the floor.
(b) Ventilation air opening, with a minimum free
area of one square inch per 4000 Btu/hr input
(5.5 cm
located within 12" (30 cm) of the ceiling.
2
per kW). This opening must be
Figure 1-5_Combustion Air from Interior Space
3. If air is taken from another interior space that is adequately
ventilated, each of the two openings specified above should
have a net free area of one square inch for each 1000 Btu/
hr (22cm2 per kW) of input, but not less than 100 square
inches (645cm2) (see FIG. 1-5).
10
Installation & Service Manual
1 Determine boiler location (continued)
Figure 1-6_Combustion Air from Outside Single Opening
4. If a single combustion air opening is provided to bring
combustion air in directly from the outdoors, the
opening must be sized based on a minimum free area of
one square inch per 3000 Btu/hr (7 cm2 per kW). This
opening must be located within 12" (30 cm) of the top of
the enclosure (see FIG. 1-6).
Combustion air require ments are based on the latest edition
of the National Fuel Gas Code, ANSI Z223.1, in Canada
refer to National Standard CAN B149.1. Check all local code
re quire ments for combustion air.
All dimensions are based on net free area in square inch es.
Metal louvers or screens reduce the free area of a combustion
air opening a minimum of approximately 25%. Check with
louver manufacturers for exact net free area of louvers.
Where two openings are pro vid ed, one must be within
12" (30 cm) of the ceiling and one must be within 12" (30 cm)
of the floor of the room where the appliance is installed. Each
opening must have a net free area as specified in Table 1B
(on page 12). Single openings shall be located with in
12" (30 cm) of the ceiling.
CAUTION
The combustion air supply must be completely free of any
flammable vapors that may ignite or chemical fumes which
may be corrosive to the appliance. Common corrosive
chemical fumes which must be avoided are fluorocarbons
and other halogenated compounds, most commonly present
as refrigerants or solvents, such as freon, tricholorethylene,
perchlorethylene, chlorine, etc. These chemicals, when burned,
form acids which quickly attack the heat exchanger finned
tubes, headers, flue collectors, and the vent system. The result
is improper combustion and a non-warrantable, premature
appliance failure.
The result is improper combustion and a non-warrantable,
premature appliance failure.
EXHAUST FANS: Any fan or equipment which exhausts air
from the equipment room may deplete the combustion air
supply and/or cause a downdraft in the venting system. Spillage
of flue products from the venting system into an occupied
living space can cause a very hazardous condition that must be
immediately corrected. If a fan is used to supply combustion
air to the equipment room, the installer must make sure that it
does not cause drafts which could lead to nuisance operational
problems with the appliance.
Under no circumstances should the room
where the appliance is installed ever be
under a negative pressure. Particular
care should be taken where exhaust fans,
attic fans, clothes dryers, compressors, air
handling units, etc., may take away air from
the appliance.
11
1 Determine boiler location
TABLE - 1B
MINIMUM RECOMMENDED COMBUSTION
AIR SUPPLY TO EQUIPMENT ROOM
Installation & Service Manual
Input
Btu/hr
45,000
75,000
90,000
135,000
180,000
215,000
260,000
*Outside Air from
2 Openings Directly from
Outdoors
Top
Opening, in
12
(78 cm2)
19
(123 cm2)
23
(148 cm2)
34
(220 cm2)
45
(291 cm2)
54
(349 cm2)
65
(420 cm2)
Bottom
2
Opening, in
(78 cm2)
(123 cm2)
(148 cm2)
(220 cm2)
(291 cm2)
(349 cm2)
(420 cm2)
12
19
23
34
45
54
65
*Outside Air from
1 Opening Directly
from Outdoors, in
2
15
(97 cm2)
25
(162 cm2)
30
(194 cm2)
45
(291 cm2)
60
(388 cm2)
72
(465 cm2)
87
(562 cm2)
2
*Outside Air from
2 Ducts Delivered from
Outdoors
Top
Opening, in
23
(149 cm2)
38
(246 cm2)
45
(291 cm2)
68
(439 cm2)
90
(581 cm2)
108
(697 cm2)
130
(839 cm2)
Bottom
2
Opening, in
(149 cm2)
(246 cm2)
(291 cm2)
(439 cm2)
(581 cm2)
(697 cm2)
(839 cm2)
23
38
45
68
90
108
130
**Inside Air from
2 Ducts Delivered from
Interior Space
Top
2
Opening, in
(646 cm2)
(646 cm2)
(646 cm2)
(871 cm2)
(1,162 cm2)
(1,388 cm2)
(1,678 cm2)
100
100
100
135
180
215
260
2
Bottom
Opening, in
100
(646 cm2)
100
(646 cm2)
100
(646 cm2)
135
(871 cm2)
180
(1,162 cm2)
215
(1,388 cm2)
260
(1,678 cm2)
2
*Outside air openings shall directly communicate with the outdoors. When combustion air is drawn from the outside through a
duct, the net free area of each of the two openings must have twice (2 times) the free area required for Outside Air/2 Openings.
The above requirements are for the boiler only; additional gas fired appliances in the equipment room will require an increase
in the net free area to supply adequate combustion air for all appliances.
**Combined interior space must be 50 cubic feet per 1,000 Btu/hr input. Buildings MUST NOT be of *“Tight Construction”.
For buildings of *“Tight Construction”, provide air openings into the building from outside.
*No combustion air openings are needed when the water heater is installed in a space with a volume NO LESS than 50 cubic feet
per 1,000 Btu/hr of all installed gas fired appliances. Buildings MUST NOT be of *“Tight Construction”.
*”Tight Construction” is defined as a building with less than 0.40 ACH (air changes per hour).
Vent installations for connection to gas vents or
chimneys must be in accordance with “Vent ing of Equipment,”
of the latest edition of the Na tion al Fuel Gas Code, ANSI
Z223.1, in Canada, the latest edi tion of CGA Standard B149
Installation Code for Gas Burning Appliances and Equipment
or applicable pro vi sions of the local building codes.
Adequate combustion and ventilation air must be
sup plied to the room where the appliance is installed in
accordance with the latest edition of the National Fuel Gas
Code, ANSI Z223.1, in Canada, the latest edition of CGA
Stan dard B149 Installation Code for Gas Burning Ap pli anc es
The distance of the vent terminal from adjacent
build ings, windows that open and building open ings MUST
comply with the latest edition of the National Fuel Gas Code,
ANSI Z223.1, in Canada, the latest edition of CGA Standard
B149 In stal la tion Code for Gas Burn ing Appliances and Equipment.
Vent connection is made directly to the top of the
ap pli ance. This appliance is designed with a built-in draft
diverter. No additional external draft hood is re quired. The
connection from the appliance vent to the common vent or
chimney must be made as direct as possible.
and Equipment, or applicable pro vi sions of the local building
codes.
12
2 Venting
Installation & Service Manual
A Conventional Negative Draft
Venting System
The negative draft in a conventional vent in stal la tion must
be within the range of a negative 0.02 to 0.05 inches
water column to ensure proper operation. All draft readings are made while the appliance is in stable op er a tion
(approximately 2 to 5 minutes).
Multiple appliance installations with combined vent ing or
common venting with other negative draft ap pli anc es require
that each appliance must have draft with in the proper range.
If the draft mea sured above the appliance’s built-in draft
diverter ex ceeds the specified range in a dedicated chimney
for a single appliance installation or in combined venting
with other negative draft appliances, a baro met ric damper
must be in stalled to control draft.
TABLE - 2A
VENT PIPE SIZES
Input Btu/hrFlue Size
45,0004"
75,0005"
90,0005"
135,0006"
180,0007"
215,0007"
260,0008"
On a conventionally vented, negative draft ap pli ance, the
connection from the vent to the chimney or vent termination
on the outside of the building MUST be made with listed Type
“B” double wall (or equivalent) vent connectors and must
be direct as possible with no reduction in diameter. Use the
National Fuel Gas Code venting tables for dou ble wall vent
to properly size all vent connectors and stacks. The Type “B”
vent and accessories, such as firestop spacers, thim bles, caps,
etc., MUST be installed in accordance with the manufacturer’s
list ing. The vent connector and firestop must provide correct
spacing to combustible surfaces and seal to the vent connector
on the upper and lower sides of each floor or ceiling through
which the vent connector passes.
Any vent materials used must be listed by a na tion al ly recognized
test agency for use as vent ma te ri al.
13
2 Venting
Locate appliance as close as possible to a chimney or gas vent.
Avoid long horizontal runs of the vent pipe, 90° el bows,
reductions and restrictions. Horizontal por tions of the
venting system shall be supported to prevent sagging.
Horizontal runs must slope up wards not less than 1/4 inch
per foot (21 mm/m) from the appliance to the vent terminal.
Follow manufacturer’s instructions.
Do not use an existing chimney as a raceway for a flue pipe if
another appliance or fireplace is vented through the chimney.
The weight of the venting system must not rest on the
appliance. Adequate support of the venting sys tem must be
provided in compliance with local codes and other applicable
codes. All connections should be secured with rustproof
sheet metal screws.
Vent connectors serving appliances vented by nat u ral draft
shall not be connected to any portion of a me chan i cal draft
system operating under positive pres sure. Connection to
a positive pressure chim ney may cause flue products to be
discharged into the living space causing serious health injury.
Common venting systems may be too large when an existing
appliance is removed. At the time of removal of an existing
appliance, the following steps shall be followed with each
appliance remaining connected to the common venting
system placed in operation, while other appliances remaining
con nect ed to the common venting system are not in operation.
Installation & Service Manual
(e) Test for spillage at the draft hood/relief opening after
5 minutes of main burner operation. Use the flame of
a match or candle, or smoke from a cigarette, cigar or
pipe.
(f) After it has been determined that each appliance
remaining connected to the common venting system
properly vents when tested as outlined above, return
doors, windows, exhaust fans, fireplace dampers
and other gas burning ap pli anc es to their previous
conditions of use.
(g) Any improper operation of the common venting
system should be corrected so that the installation
conforms to the latest edition of the Na tion al Fuel Gas
Code, ANSI Z223.1. In Canada, the latest edition of
CGA Standard B149 Installation Code for Gas Burning
Appliances and Equipment. When resizing any
por tion of the common venting system, the common
venting system should be resized to ap proach the
min i mum size as determined using the appropriate
tables in Part 11 in the latest edition of the National
Fuel Gas Code, ANSI Z223.1. In Canada, the latest
edition of CGA Stan dard B149 Installation Code for
Gas Burning Appliances and Equipment.
(a) Seal any unused opening in the common venting
system.
(b) Visually inspect the venting system for proper size
and horizontal pitch and determine there is no
blockage or restriction, leakage, corrosion and other
deficiencies which could cause an unsafe condition.
(c) Insofar as is practical, close all building doors and
windows and all doors between the space in which
the appliances remaining connected to the common
venting system are located and other spaces of the
building. Turn on clothes dryers and any other
appliances not connected to the common venting
system. Turn on any exhaust fans, such as range
hoods and bathroom exhausts, so they will operate
at maximum speed. Do not operate a summer
ex haust fan. Close fireplace dampers.
(d) Place in operation the appliance being inspected.
Follow the lighting instructions. Adjust thermostat
so appliance will operate continuously.
14
Y
2 Venting (continued)
Vertical Vent Termination Clearances
Installation & Service Manual
10' OR LESS
10' OR LESS
10' OR LESS
2' MIN
RIDGE
CHIMNEY
3' MIN
Figure 2-2_Vent Termination from Peaked Roof 10' or
Less from Ridge
MORE THAN 10'
10'
2' MIN
RIDGE
CHIMNE
3' MIN
2' MIN
CHIMMEY
WALL OR
PARAPET
2' MIN
3' MIN
CHIMMEY
Figure 2-4_Vent Termination from Flat Roof 10' or
Less from Parapet Wall
10' OR MORE
3'
NOTE:
NO HEIGHT ABOVE
PARAPET REQUIRED
WHEN DISTANCE
FROM WALLS OR
PARAPETS IS MORE
THAN 10'.
Figure 2-3_Vent Termination from Peaked Roof More
than 10' from Ridge
The vent terminal should be vertical and exhaust outside the
building at least 2 feet (0.61m) above the high est point of the
roof within a 10 foot (3.05m) radius of the termination. The
vertical termination must be a minimum of 3 feet (0.91m)
above the point of exit.
A vertical terminal less than 10 feet (3.05m) from a parapet
wall must be a minimum of 2 feet (0.61m) higher than the
parapet wall.
The vent cap should have a minimum clearance of 4 feet
(1.22m) horizontally from and in no case above or below,
unless a 4 foot (1.22m) horizontal distance is maintained from
electric meters, gas meters, reg u la tors and relief equipment.
The venting system shall terminate at least 3 feet (0.9m) above
any forced air inlet within 10 feet (3.05m).
The venting system shall terminate at least 4 feet (1.2m)
below, 4 feet (1.2m) horizontally from, or 1 foot (30cm) above
any door, window or gravity air inlet into any building.
WALL OR
PARAPET
CHIMNEY
Figure 2-5_Vent Termination from Flat Roof More Than
10' from Parapet Wall
Do not terminate the vent in a window well, stair well, alcove,
courtyard or other recessed area. The vent can not terminate below grade. The bot tom of the vent terminal shall be located
at least 12 inches (30cm) above grade.
To avoid a blocked vent condition, keep the vent cap clear of
snow, ice, leaves, debris, etc.
Flue gases will form a white plume in winter. Plume could
obstruct window view.
Flue gas condensate can freeze on exterior sur fac es or on
the vent cap. Frozen condensate on the vent cap can result
in a blocked vent condition. Flue gas condensate can cause
discoloration of exterior build ing surfaces. Adjacent brick or
masonry sur fac es should be protected with a rust resistant sheet
metal plate.
NOTICE
Examine the venting system at least once
a year. Check all joints and vent pipe
con nec tions for tightness. Also check for
corrosion or de te ri o ra tion. Immediately
correct any problems ob served in the
venting system.
15
2 Venting
Installation & Service Manual
Masonry Chimney Installation
A masonry chimney must be properly sized for the installation
of a gas fired appliance. Venting of an appliance into a cold
or oversized masonry chimney can result in op er a tion al and
safety problems. Exterior masonry chim neys, with one or
more sides exposed to cold out door tem per a tures, are more
likely to have venting problems. The temperature of the flue
gases from an appliance may not be able to suf fi cient ly heat
the ma son ry structure of the chim ney to generate proper
draft. This will result in condensing of flue gases, damage
the masonry flue/tile, insufficient draft and possible spill age
of flue gases into an occupied living space. Care ful ly in spect
all chimney systems before installation. If there is any doubt
about the sizing or condition of a masonry chimney, it must
be relined with a prop er ly sized and approved chimney liner
system.
Inspection of a Masonry Chimney
A masonry chimney must be carefully inspected to determine
its suitability for the venting of flue gas es. A clay tile lined
chimney must be structurally sound, straight and free of
misaligned tile, gaps between liner sections, missing sections
of liner or any signs of con den sate drainage at the breaching
or clean out. If there is any doubt about the condition of a
masonry chimney, it must be relined. An unlined masonry
chimney must not be used to vent flue gases from this appliance.
An unlined chimney must be relined with an approved
chimney liner system when a new appliance is be ing attached
to it. Metallic liner systems (Type “B” double wall or flexible
or rigid metallic liners) are recommended. Consult with
local code officials to determine code requirements or the
advisability of using or relining a masonry chimney.
Sidewall Venting - Negative Draft
This appliance is NOT approved for sidewall venting as
shipped from the factory. If installation requires that the
flue gases be vented out a sidewall, either an induced draft
fan or a power venter MUST be used. A power venter
that plugs directly into the vent damper plug is available
for models up to 135,000 Btu/hr and may be used for
both sidewall and vertical venting configurations, see Fan Assisted Venting. Larger models may use an induced draft
fan, which will connect to the terminal strip on the side
of the boiler, see Auxiliary Power Venting Connection to Terminal Strip, page 33 for more information. A properly
sized and in stalled induced draft fan may also be used
to vent the flue gases ver ti cal ly if required by jobsite
re stric tions. The induced draft fan must be listed by a
nationally recognized test agency, be properly sized and
installed per the rec om men da tions of the in duced draft fan
manufacturer and meet local code requirements. Use care to
ensure that the me chan i cal ly supplied draft operates within
the range of a negative 0.02 to 0.05 inches water column to
ensure proper operation.
If draft exceeds the spec i fied range, the fan must be adjusted
or the installation of a baro met ric damper in the flue may be
required to prop er ly control draft. An induced draft fan MUST
be interlocked into the appliance’s control circuit to start when
the appliance calls for heat. The in duced draft fan MUST also
be equipped with a prov ing switch, properly interlocked into
the ap pli ance’s con trol circuit to prove fan operation before
the main burn ers are allowed to fire. A vertical or sidewall vent
termination for an induced draft fan MUST be in stalled per the
recommendations of the fan manufacturer and provide proper
clearances from any combustion or ventilation openings,
win dows, doors or other open ings into the building. All
induced draft fan in stal la tions must comply with local code
requirements.
Fan Assisted Venting
A Power Venter Kit is available on Models 45,000 - 135,000 Btu/hr only
(see Table 2B).
TABLE 2B - VENT MATERIALS
Kit
Number
KIT3103
KIT3104
Minimum Vent Length = 12 Equivalent Feet*
Maximum Vent Length = 25 Equivalent Feet*
CAUTION
NOTE: In Canada, CPVC and PVC vent pipe, ttings and
DO NOT use Radel or cellular (foam) core
PVC or CPVC pipe.
DO NOT insulate PVC or CPVC venting
materials. Use of insulation will cuase
increased vent wall temperatures, which
could result in vent pipe failure.
Material
16
D
2 Venting (continued)
Automatic Vent Damper
Installation & Service Manual
This heating boiler is design certified for use with the
automatic vent damper (FIG. 15) part number printed on
the boiler’s rating plate. A vent damper must be installed
on all residential heating boilers with inputs of less than
300,000 Btu/hr to comply with minimum efficiency
requirements. A vent damper is factory supplied with
residential heating boilers with inputs of 45,000 - 260,000 Btu/hr.
The vent damper is a useful tool for saving energy when
installed inside the living space where air can cir cu late freely
around the appliance. The vent damper will not save as
much, if any, energy if it is installed in locations such as:
- Unheated garage
- Attic
- Crawlspace
- Mechanical room that is vented outdoors
For installation and maintenance on the vent damper, refer to
the instructions supplied with the vent damper.
Residential heating boilers with inputs of less than 300,000 Btu/hr
must have the vent damper prop er ly installed and the vent
damper wire harness plugged into the ter mi nal block on the
side of the control panel to allow the boiler to function.
CAUTION
Do not install the vent damper within 6"
(152 mm) of combustible materials.
Install the vent damper to service only the single ap pli ance
for which it is intended. If improperly installed, a hazardous
condition such as an ex plo sion or carbon monoxide poisoning
could result.
VENT DAMPER
SECURE EXCESS
SLACK WITH WIRE
CLIP (PICTURED)
OR ZIP TIES
DIR #2000556517 00
IR #2000556517 00
Figure 2-7_Vent Damper and Vent Damper Terminal Block
WARNING
The vent damper must be installed directly
on the flue outlet located on the top of the
draft hood (see FIG. 2-7). Do not alter
the wire har ness sup plied with the vent
damper. Follow the instructions supplied
with the vent damper.
CAUTION
An appliance which is shut down or will not
operate may experience freezing due to con vective air flow down the flue pipe connected to
the unit. Proper freeze protection must be
pro vid ed, see Freeze Pro tec tion.
The damper position indicator must be in a visible lo ca tion
with access for service following in stal la tion. The damper
must be in an open position when appliance main burners
are operating.
If there is excess slack in the vent damper wire after vent
damper installation, use the kit-provided wire clip or zip ties
to secure the wire. If using the kit-provided wire clip, fasten
the wire clip to the side of the boiler using the kit-provided
screw. Loop the excess wire and secure it in the wire clip.
If using the kit-provided zip ties, loop the excess slack and
secure it with the zip ties.
The part number for the automatic vent damper required on
this heating boiler is printed on the rating plate. Vent damper
regulations are design certified per the latest edition of ANSI
Z21.66.
17