Life Fitness SM83 User Manual

8 STACK MULTI-JUNGLE (SM83)
WITH 3 ADJUSTABLE PULLEYS
UNPACKING AND ASSEMBLY INSTRUCTIONS
M051-K50-B105 1
SM83 Unpacking & Assembly Instructions
The SM83 comes partially assembled. Follow the steps below to complete the assembly.
WARNING: COMPONENTS OF THE SM83 ARE LARGE AND HEAVY. USE CAUTION WHEN ASSEMBLING THIS MACHINE.

MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY

1/2”, 3/8”, 5/8” & 9/16” Socket wrench with 10” long extension
You will also need a piano dolly to lift and position the weight stacks and a ladder.
1/8” hex key wrench
5/8” & 9/16”, 7/8” Combination wrench
Pinch bar

ASSEMBLY TIME

Two people can accomplish this assembly in approximately 2-1/2 hours.
2

UNPACKING

Follow the steps below when unpacking the components of the SM83.
1. Cut off the shipping wrapper.
2. Remove the parts boxes and shipping boards.
3. Remove the items in the parts boxes. These items are shown in Figure 1. A. Remove the bolts bag. B. Remove the parts shown below. Parts that are used to build the SM83 are
described in the section HARDWARE at the end of these instructions.
SM83 Unpacking & Assembly Instructions
Figure 1. Parts box contents (box 1 on left, box 2 on right).
3
SM83 Unpacking & Assembly Instructions
g
)

ASSEMBLY

Figure 2 shows an assembled SM83.
Figure 2. SM83 main components (seats and cables removed for clarity).
1. Cubes (2)
2. Low row bench (2)
3. Lat bench (2)
4. Connecting beam (1)
1. Place the two weight “cubes” in their “final resting spots.” The cubes will be approximately 11’4” apart as shown in Figure 3.
5. Lat tops (2)
6. Tricep top (1)
7. Adj. X-over top (1)
8. 300 lb. Weight stacks (4)
9. 190 lb. Wei
ht stacks (4
4
SM83 Unpacking & Assembly Instructions
Figure 3. Set the weight stack cubes.
2. Bolt on the teardrop pulley assemblies above the benches (see Figure 4) on both cubes using two 3/8” x 2-3/4” hex head bolts. Include the 3/8” flat washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt configuration shown in Figure 5. You may wish to use a pinch bar to align the bolt holes.
5
SM83 Unpacking & Assembly Instructions
Figure 4. Bolt on the teardrop pulleys.
Figure 5. Configuration for 2-3/4” and 3” bolts.
3. Using a 5/8” socket with long extension and combination wrench, bolt on the connecting beam to the cubes using two of the large 7/16” x 6” bolts, 7/16” washers, and 7/16” nuts, end cap washers and end caps. Figure 6 shows the connected cubes. You will need to remove the pulleys from the teardrop pulley assemblies to gain clearance for the socket wrench extension. Leave the pulleys out of the housings until the cables have been installed.
6
Remove pulleys from housings to give clearance to socket extension
SM83 Unpacking & Assembly Instructions
7/16” x 6” (2)­mount on tops
Figure 6. Bolt on the connecting beam.
7
SM83 Unpacking & Assembly Instructions
4. Using a 5/8” socket and combination wrench, mount the 56” lat tops (part T from HARDWARE section) to the cells by inserting two of the large 7/16” by 6” bolts using the hardware configuration shown in Figure 8. Mount the 29” tricep top (part U in HARDWARE section) and adjustable crossover top (part V in HARDWARE section) to the frame and connecting beam (See Figure 7). You will need to remove the teardrop pulleys from their housings to gain clearance for the socket extension used to tighten the bolts on the tops. Use a 9/16” socket and combination wrench to do this.
3/8” x 3” (2)­bolt top beams together
7/16” x 6” (6)­mount on tops
Remove pulleys from housings to give clearance to socket extension
3/8” x 3” (2)­bolt top beams together
Figure 7. Mount lat tops (T), tricep top (U), adjustable crossover top (V).
Figure 8. Configuration for 6” bolts.
8
Loading...
+ 16 hidden pages