The SM62 comes partially assembled. Follow the steps below to complete the assembly.
WARNING: COMPONENTS OF THE SM62 ARE LARGE AND HEAVY. USE CAUTION
WHEN ASSEMBLING THIS MACHINE.
MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY
1/2”, 3/8”, 5/8” & 9/16”
Socket wrench with
extension
You will also need a piano dolly to lift and position the weight stacks and a ladder.
1/8”
hex key wrench
5/8” & 9/16”
Combination wrench
Pinch bar
ASSEMBLY TIME
Two people can accomplish this assembly in approximately 2 hours.
2
UNPACKING
Follow the steps below when unpacking the components of the SM62.
1. Cut off the shipping wrapper.
2. Remove the parts boxes and shipping boards.
3. Remove the items in the parts boxes. These items are shown in Figure 1.
A. Remove the bolts bag.
B. Remove the parts shown below. Parts that are used to build the SM62 are
described in the section HARDWARE at the end of these instructions.
SM62 Unpacking & Assembly Instructions
Figure 1. Parts box contents (box 1 on left, box 2 on right).
3
SM62 Unpacking & Assembly Instructions
ASSEMBLY
Figure 2 shows an assembled SM62.
Figure 2. SM62 main components.
1. Cubes (2)
2. Lat bench (2)
3. Connecting beam (1)
4. Lat tops (2)
1. Place the two weight “cubes” in their “final resting spots.” The cubes will be
approximately 11’4” apart as shown in Figure 3.
5. Tricep top (1)
6. Adj. X-over top (1)
7. 300 lb. Weight stacks (2)
8. 190 lb. Weight stacks (4)
4
SM62 Unpacking & Assembly Instructions
Figure 3. Set the weight stack cubes.
Figure 4. Configuration for 2-3/4” and 3” bolts.
5
SM62 Unpacking & Assembly Instructions
Figure 5. Configuration for 6” bolts.
2. Bolt on the teardrop pulleys above the benches (see Figure 6) on both cubes using
two 3/8” x 2-3/4” hex head bolts. Include the 3/8” flat washer, end cap washers, end caps
and 3/8” Nyloc (locknut). Use the bolt configuration shown. You may wish to use a pinch
bar to align the bolt holes.
Figure 6. Bolt on the teardrop pulleys.
3. Bolt connecting beam to cubes (part 4 from Figure 2) using a 5/8” socket with
extension and combination wrench. Use two of the large 7/16” x 6” bolts, 7/16” washers,
and 7/16” end cap washers and end caps. Figure 7 shows the connected cubes.
6
T
n
U
3/8” x 3” (4)
bolt top
beams together
SM62 Unpacking & Assembly Instructions
7/16” x 6” (8)
mount on tops
T
V
Remove pulleys from
housings to give clearance
to socket extensio
Figure 7. Bolt on the connecting beam, lat tops, tricep tops.
4. Mount the 56” lat tops (part T) to the cubes using a 5/8” socket and combination wrench
by inserting two of the large 7/16” by 6” bolts using the hardware configuration shown in
Figure 7. Mount the 29” tricep tops (part U) to the cubes using the 7/16” x 6” bolts.
Secure to the lat tops using the 3/8” x 3” bolts. Use the hardware configuration shown in
Figure 7. You will need to remove the pulleys from the teardrop pulley assemblies to gain
clearance for the socket wrench extension. Leave the pulleys out of the housings until the
cables have been installed.
150 lb.
weight stack
300 lb.
weight stack
150 lb.
weight stack
Figure 8. Mount rubber bumpers and the weight stacks.
7
Loading...
+ 16 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.