Life Fitness SM60 User Manual

6 STACK MULTI-JUNGLE (SM60)
WITH HIGH & LOW PULLEYS
UNPACKING AND ASSEMBLY INSTRUCTIONS
M051-K50-A136 1
SM60 Unpacking & Assembly Instructions
The SM60 comes partially assembled. Follow the steps below to complete the assembly.
WARNING: COMPONENTS OF THE SM60 ARE LARGE AND HEAVY. USE CAUTION WHEN ASSEMBLING THIS MACHINE.

MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY

1/2”, 3/8”, 5/8” & 9/16” Socket wrench with extension
You will also need a piano dolly to lift and position the weight stacks and a ladder.
1/8” hex key wrench
5/8” & 9/16” Combination wrench
Pinch bar

ASSEMBLY TIME

Two people can accomplish this assembly in approximately 2 hours.
2

UNPACKING

Follow the steps below when unpacking the components of the SM60.
1. Cut off the shipping wrapper.
2. Remove the parts boxes and shipping boards.
3. Remove the items in the parts boxes. These items are shown in Figure 1. A. Remove the bolts bag. B. Remove the parts shown below. Parts that are used to build the SM60 are
described in the section HARDWARE at the end of these instructions.
SM60 Unpacking & Assembly Instructions
Figure 1. Parts box contents (box 1 on left, box 2 on right).
3
SM60 Unpacking & Assembly Instructions

ASSEMBLY

Figure 2 shows an assembled SM60.
Figure 2. SM60 main components.
1. Cubes (2)
2. Lat bench (2)
3. Connecting beam (1)
1. Place the two weight “cubes” in their “final resting spots.” The cubes will be approximately 11’4” apart as shown in Figure 3.
4. Lat tops (2)
5. Tricep top (1)
6. 300 lb. Weight stacks (3)
7. 190 lb. Weight stacks (3)
4
SM60 Unpacking & Assembly Instructions
Figure 3. Set the weight stack cubes.
2. Bolt on the teardrop pulleys above the benches (see Figure 4) on both cubes using two 3/8” x 2-3/4” hex head bolts (used to bolt the cross beam to the cross members and the adjustable pulley tops to the top beams). Include the 3/8” flat washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt configuration shown in Figure 5. You may wish to use a pinch bar to align the bolt holes.
5
SM60 Unpacking & Assembly Instructions
Figure 4. Bolt on the teardrop pulleys.
Figure 5. Configuration for 6” bolts.
6
SM60 Unpacking & Assembly Instructions
Figure 6. Configuration for 2-3/4” and 3” bolts.
3. Bolt on the connecting beam (part 3 from Figure 2) using a 5/8” socket with extension and combination wrench, to the cubes using two of the large 7/16” x 6” bolts, 7/16” washers, and 7/16” nuts, end cap washers and end caps. Figure 7 shows the connected cubes.
3/8” x 3” (4)­bolt top beams together
7/16” x 6” (8)­mount on tops
U
T
U
T
Remove pulleys from housings to give clearance to socket extension
Figure 7. Bolt on the connecting beam, lat tops, tricep tops.
4. Mount the 56” lat tops (part T) to the cells using a 5/8” socket and combination wrench by inserting two of the large 7/16” by 6” bolts using the hardware configuration shown. Mount the 29” tricep tops (part U) to the frame and connecting beam (See Figure 7). Use the hardware configuration shown. You will need to remove the pulleys from the teardrop pulley assemblies to gain clearance for the socket wrench extension. Leave the pulleys out of the housings until the cables have been installed.
7
Loading...
+ 14 hidden pages