6 STACK MULTI-JUNGLE (SM60)
WITH HIGH & LOW PULLEYS
UNPACKING AND ASSEMBLY INSTRUCTIONS
M051-K50-A136 1
SM60 Unpacking & Assembly Instructions
The SM60 comes partially assembled. Follow the steps below to complete the assembly.
WARNING: COMPONENTS OF THE SM60 ARE LARGE AND HEAVY. USE CAUTION
WHEN ASSEMBLING THIS MACHINE.
MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY
1/2”, 3/8”, 5/8” & 9/16”
Socket wrench with
extension
You will also need a piano dolly to lift and position the weight stacks and a ladder.
1/8”
hex key wrench
5/8” & 9/16”
Combination wrench
Pinch bar
ASSEMBLY TIME
Two people can accomplish this assembly in approximately 2 hours.
2
UNPACKING
Follow the steps below when unpacking the components of the SM60.
1. Cut off the shipping wrapper.
2. Remove the parts boxes and shipping boards.
3. Remove the items in the parts boxes. These items are shown in Figure 1.
A. Remove the bolts bag.
B. Remove the parts shown below. Parts that are used to build the SM60 are
described in the section HARDWARE at the end of these instructions.
SM60 Unpacking & Assembly Instructions
Figure 1. Parts box contents (box 1 on left, box 2 on right).
3
SM60 Unpacking & Assembly Instructions
ASSEMBLY
Figure 2 shows an assembled SM60.
Figure 2. SM60 main components.
1. Cubes (2)
2. Lat bench (2)
3. Connecting beam (1)
1. Place the two weight “cubes” in their “final resting spots.” The cubes will be
approximately 11’4” apart as shown in Figure 3.
4. Lat tops (2)
5. Tricep top (1)
6. 300 lb. Weight stacks (3)
7. 190 lb. Weight stacks (3)
4
SM60 Unpacking & Assembly Instructions
Figure 3. Set the weight stack cubes.
2. Bolt on the teardrop pulleys above the benches (see Figure 4) on both cubes
using two 3/8” x 2-3/4” hex head bolts (used to bolt the cross beam to the cross
members and the adjustable pulley tops to the top beams). Include the 3/8” flat
washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt
configuration shown in Figure 5. You may wish to use a pinch bar to align the bolt
holes.
5
SM60 Unpacking & Assembly Instructions
Figure 4. Bolt on the teardrop pulleys.
Figure 5. Configuration for 6” bolts.
6
SM60 Unpacking & Assembly Instructions
Figure 6. Configuration for 2-3/4” and 3” bolts.
3. Bolt on the connecting beam (part 3 from Figure 2) using a 5/8” socket with
extension and combination wrench, to the cubes using two of the large 7/16” x 6”
bolts, 7/16” washers, and 7/16” nuts, end cap washers and end caps. Figure 7 shows
the connected cubes.
3/8” x 3” (4)bolt top
beams together
7/16” x 6” (8)mount on tops
U
T
U
T
Remove pulleys from
housings to give clearance
to socket extension
Figure 7. Bolt on the connecting beam, lat tops, tricep tops.
4. Mount the 56” lat tops (part T) to the cells using a 5/8” socket and combination
wrench by inserting two of the large 7/16” by 6” bolts using the hardware configuration
shown. Mount the 29” tricep tops (part U) to the frame and connecting beam (See
Figure 7). Use the hardware configuration shown. You will need to remove the pulleys
from the teardrop pulley assemblies to gain clearance for the socket wrench
extension. Leave the pulleys out of the housings until the cables have been installed.
7