ENGLISH
U-Series Installation Manual
N195WU
This manual describes how to install the LG U-Series network monitor
in WMS 2011 OS Environment.
Please read the safety information carefully before using the product.
www.lg.com
NETWORK MONITOR INSTALLATION
2
ENGLISH
ENG
CONTENTS
3 SOFTWARE INSTALLATION PREREQUISITES
4 SYSTEM REQUIREMENTS:
4 INSTALLING WMS 2011 SERVER
4 Installing MultiPoint Server 2011
5 INSTALLING PRIMARY STATION AND
STANDARD STATIONS
5 1. Connecting the Server PC to the Main Monitor
6 2. Connecting the Server PC to Standard Monitors
7 3. Linking U-Series Monitors by Daisy Chaining
8 MULTIPOINT MANAGER
8 Using MultiPoint Manager
9 OPERATING ENVIRONMENT
DEFINITIONS
Primary Station
y
A monitor that is connected through the video port of the server PC.
You can use a monitor other than an LG U-Series monitor.
Standard Station
y
LG U-Series monitor that is connected through the USB port of the server PC.
Station
y
A monitor.
NETWORK MONITOR INSTALLATION
3
SOFTWARE INSTALLATION PREREQUISITES
To install the LG U-Series network monitor, you will need the following.
x 4
Station 1 Station 2
U-Series Network Monitor Power Cord
USB Cables (A-B Type)
Station 3 Station 4
x 4
AC/DC adaptor
x 4
User Manual/
Software Installation CD/
Card
ENGLISH
ENG
1 Server PC/Regular Monitor
(sold separately)
USB Type (for U-Series Monitor)
Keyboard/Mouse
PS2 Type (for Regular Monitor)
(sold separately)
1 USB Hub
(sold separately)
CAUTION
If the system does not meet the above requirements, the software may not install correctly or may fail
y
to start.
The USB hub is only required in order to connect the USB-type keyboard and mouse to the primary
y
station.