IMPORTANT : THIS PRODUCT SHOULD NOT BE USED FOR ANY PURPOSE OTHER THAN THE
Getting Started
PURPOSE DESCRIBED IN THIS INSTALLATION MANUAL.
WARNING
yThere is high possibility of electric shock or serious burns due to the high voltages in power
conditioning circuits.
yHigh voltages on AC and DC cables. Risk of death or serious injury due to electric shock.
yA potentially hazardous circumstance such as excessive heat or electrolyte mist may occur due to
improper operating conditions, damage, misuse and/or abuse.
yThis product have potential danger such as death or serious injury by re, high voltages or
explosion if appropriate precautions are not read or fully understood.
yDo not place ammable or potentially explosive objects near the product.
yDo not place any kind of objects on top of the product during operation.
yAll works on the PV modules, power conditioning system, and battery system must be carried out
by qualied personnel only.
yElectrical installations must be done in accordance with the local and national electrical safety
standards.
yWear rubber gloves and protective clothing (protective glasses and boots) when working on high
voltage/high current systems such as PCS and battery systems.
yThere is a risk of electric shock. Do not remove cover. There is no user serviceable parts inside.
Refer servicing to qualied and accredited service technician.
yElectrical shock hazard. Do not touch uninsulated wires when the product cover is removed.
yIn the event of fault, the system must not be restarted. Product maintenance of repairs must be
performed by qualied personnel, or personnel from an authorized support center.
yIf the connected batteries are not LG battery, not only the batteries but also the PCS is not
guaranteed by LG Electronics.
Indicates a potentially dangerous situation. Death or serious
injury may result if appropriate precautions are not taken.
Getting Started
Indicates a situation where damage or injury could occur. If
CAUTION
yThis product is intended for residential use only and should not be used for commercial or
industrial.
yBefore testing electrical parts inside the system, it takes at least 10-minute standby period of
time to complete discharging the system.
yThe contents included in this box are power conditioning system and its accessories, and the
entire weight is very heavy. Serious injury may occur due to the heavy weight of the package with
PCS and accessories. Therefore, special care must be taken in handling. Make sure to have at least
two persons deliver and remove the package.
yDo not use the damaged, cracked or frayed electrical cables and connectors. Protect the electrical
cables from physical or mechanical abuse, such as being twisted, kinked, pinched, closed in a door
or walked upon. Periodically examine the electrical cables of your product, and if its appearance
indicates damage or deterioration, discontinue use of this product, and have the cables replaced
with an exact replacement part by a qualied personnel.’
yEnsure that you connect the earth ground wire to prevent possible electric shock. Do not try to
ground the product by connecting it to telephone wires, lightning rods or gas pipes.
yThe product should not be exposed to water (dripping or splashing) and no objects lled with
liquids, such as vases, should be placed on the product.
yTo prevent re or electric shock hazard, do not expose this production to rain or moisture.
yDo not block any ventilation openings. Ensure reliable operation of the product and protect it
from over heating. The openings shall never be blocked by placing any object on this product.
yThe temperature of metal enclosure may be high during operation.
yIn order to avoid radio-interference, all accessories (like a energy meter) intended for connection
to the product shall be suitable for use in residential, commercial and light-industry areas. Usually
this requirement is fullled if the equipment complies with the class B limits of EN55022.
yThe product must be disposed of according to local regulations.
yThe electrical installation of this unit must only be performed by LGE service person or trained
installer, qualied to install PCS.
yIf the AC circuit breaker is turned off and the PCS is not operated for a long time, the battery may
be overdischarged.
yConnect the DC+ and DC- cables to the correct DC+ and DC- terminals on the product.
yDanger of damaging the PCS by overload. Only connect the proper wire to DC terminal block.
Refer to the installation wiring diagram for details.
yDo not step on the product or the product package. The product may be damaged.
yDo not dispose of batteries in a re. The batteries may explode.
yDo not open or damage batteries. Released electrolyte is harmful to the skin and eyes. It may be
toxic.
it is not avoided, minor injury and/or damage to property
may result.
3
1
Getting Started
Getting Started
4
yA battery can present a risk of electrical shock and high short-circuit current. The following
precautions should be observed when working on batteries.
a) Remove watches, ring, or other metal objects.
b) Use tools with insulated handles.
1
Getting Started
c) Wear rubber gloves, boots and glasses
d) Do not lay tools or metal parts on top of battery.
yDo not leave the ESS in the Fault standby state for a long time because of the battery discharge
may occur during the long standby state.
yIf the battery fault occurs immediately after starting PCS it means Battery failure. Check the
battery SOC also voltage and fault information, and turn off the power of the ESS until service
action is taken.
yIf the battery SOC is low the battery may charge from the grid for self-protection. (Emergency
Charging) This function is to prevent shutdown of the ESS, deep discharge and failure of the
Battery. An Emergency Charge is not an ESS fault.
NOTE
yBefore making connections, please make sure the PV array open circuit voltage is within 1000 V.
Otherwise the product could be damaged.
yNever use any solvents, abrasives or corrosive materials to clean this product.
yDo not store on or place against any objects to the product. It may cause serious defects or
malfunction.
yBefore making a connection, make sure the PV switch on this product is switched off.
yThis unit is designed to feed power to the public grid only. Do not connect this unit to an AC
source or generator. Connecting the product to external devices could result in serious damage to
your equipment.
yServing of batteries should be performed or supervised by LG service person or trained installer.
yThe battery does not discharged when the load is under the certain level.
yThis product can cause current with a DC component. Where a Residual Current-operated
protective (RCD) or monitoring (RCM) device is used for protection in case of direct or indirect
contact, only an RCD or RCM of Type A (or type B) is allowed on the supply side of this product.
yThis product is designed to be installed indoor use only. Do not install this product outdoor.
yThis document is for your reference only. Read the installation manual on the website below.
This product is intended to store direct current (DC) electricity generated from photovoltaic (PV) to
Getting Started
the connected Lithium-Ion Battery, and convert direct current (DC) electricity from the connected
battery and PV to alternating current (AC) electricity and feed this into the power grid.
And, the battery supplies power to the household load in an emergency.
PV Module
LED Lighting
PCS
Energy Storage System
Battery
System boiler
Air Conditioning
OvenTVRefrigeratorHeater
Washing Machine
Smart Phone
Grid
Energy
Meter
Direct Current
Alternative Current
Data Line
Internet Cloud
ABB
Smart
Meter
The electricity generated from a PV array can be stored to the connected battery or sold to energy
supply companies.
yDC-Coupled ESS
LG ESS can achieve higher system efciency due to simpler power conversion process.
yThree-Phase Connection
3-phase connection secures phase balancing.
ySmart Management
With built-in Smart PMS, it analyses PV generation and load consumption and implements to
charge and discharge immediately. Also it monitors main system & battery conditions to maintain
its stable condition always.
yWeb-monitoring Service
Customers and installers can monitor their ESS with various devices such as PC, tablet or smart
phones.
yBackup Mode
In an emergency, the battery supplies power to the household load.
Abbreviations on this manual
AbbreviationDesignationExplanation
ESSEnergy Storage
System
Inverter system that stores energy into a battery and
uses it.
Getting Started
7
1
Getting Started
PCSPower Conditioning
System
PVPhotovoltaicSolar panel system that converts solar energy into
SOCState of chargeCurrent state of a battery
BMSBattery Management
System
DCDirect Current-
ACAlternating Current-
DHCPDynamic Host
Conguration
Protocol
LANLocal Area NetworkNetwork that interconnects computers within a
IPInternet ProtocolA set of rules for sending data across a network
A device intended to convert DC electricity generated
from PV system to AC electricity and feed it to
household appliances.
direct current electricity
Electronic system that manages a rechargeable
battery.
Standardized network protocol used on Internet
Protocol (IP) networks for automatic distributing
network conguration parameters, such as IP
addresses for interfaces and services.
limited area.
1
Getting Started
Getting Started
8
Glossary
TermsExplanation
AzimuthIn the Northern hemisphere, the azimuth angle indicates by how much
degrees the module surface deviates from a full south aspect. In the
southern hemisphere, it indicates the deviation from a full north aspect.
The azimuth angle is counted with positive values within the range from
south (0°) to west (90°) and it counted with negative values within the
range from south (0°) to east (-90°).
Tilt angleThe tilt angle indicates by how much degrees the tilt of the module surface
deviates from the horizontal.
PV module The PV module refers to a panel designed to absorb the sun’s rays as a
source of energy for generating electricity.
PV arrayTechnical device for the conversion of solar energy into electrical energy. All
serial and parallel installed and connected to PV modules of a PV system
are referred to as a PV array.
Name of Each Part
Front and Rear
A
B
Getting Started
9
1
Getting Started
D
C
PCS body
A
LED Indications
B
Lower Cover
C
Bracket connected part
D
Screw holes for wall mounting
E
E
Getting Started
10
LED Indications
1
Getting Started
LEDColorDescription
Power
OffGrid is not connected.
WhiteGrid is connected.
White (Blink)PCS Fault
OffEnergy is not being generated.
Solar
Battery
WLAN
GreenEnergy is being generated.
White (Blink)PCS Fault
OffStand by
GreenBattery is in charging
BlueBattery is in discharging
Red (Blink)Battery error
White (Blink)PCS Fault
OffUnplugged WLAN dongle
GreenNetwork connected
BlueWLAN network connected
Red (Blink)Network disconnected
Bottom
Getting Started
11
1
Getting Started
Battery DC cable connectors 1
A
Battery DC cable connectors 2
B
Communication terminals
C
Black start button
D
PV switch (DC Disconnect)
E
PV1(+ and -) connectors
F
PV2 (+ and -) connectors
G
PV3 (+ and -) connectors
H
OFF
I
J
K
L
M
N
ON
Ethernet port
WLAN dongle port (USB type)
Meter connector
Heat pump connector
Wireless connection button
AC grid cable connector
Operating
12
Connecting to a Mobile Device
To connect the system to a mobile device, the LG EnerVu Plus mobile application must be installed
on your mobile device. Search and download ‘LG EnerVu Plus’ application from Apple App store or
Google Play store.
To connect to the system directly, the WLAN dongle must be connected to the system. Make sure
that the supplied WLAN dongle is connected to the system.
2
Operating
Installing 'LG EnerVu Plus' App
Download ‘LG EnerVu Plus’ on the Apple App Store or Google Play Store.
OR
LG EnerVu Plus
NOTE
yDepending on the device, ‘LG EnerVu Plus’ app may not work.
yLG EnerVu Plus app will be available in version of the software as follow;
- Android O/S : Lollipop (5.0) or later
- iOS O/S : iPhone 6 (9.0) or later
Operating
Connect via Home WLAN
Preparation
yTo connect the mobile device with the system via home network, the system must be connected
to your home network. Check the [Network] setting menu on the system.
yNote the SSID of your home network.
13
A
B
C
Run ‘LG EnerVu Plus’ app on your mobile device.
2
Operating
Tap [Connect via Home WLAN] in the
connection method selection screen.
The connection will automatically be proceeded
and main screen appears when the connection
is successful.
14
Operating
D
2
Operating
Connect directly to ESS
A
B
If the connection fails, a pop-up message
appears on the screen.
Tap [OK] to move to the WLAN selection menu
of the mobile device.
Select the SSID of your home network.
Run ‘LG EnerVu Plus’ app on your mobile device.
If it is the rst time to connect to the system,
connection method selection screen appears.
Tap [Connect directly to ESS] option.
Operating
NOTE
15
C
D
Press and hold the wireless connection button
on the system until [WLAN] LED is lights in
blue.
On your mobile device, tap [OK] to go to the
next step.
If the connection has not been made for 5
minutes, the [WLAN] LED lights green and
the WLAN signal is disabled.
Read the guidance and tap [OK] to display
WLAN selection screen.
Select the SSID which starts with ‘LGE_ESS’.
The password input screen appears.
NOTE
The last 2 characters of the SSID are the
same as the last 2 characters of the system
registration number.
Example :
SSID (LGE_ESS-5E)
Registration No. (LGE-ESS-
DE1710BKRH00685E)
2
Operating
16
NOTE
Operating
2
Operating
E
Input WLAN password in the password eld to
connect to the system.
The WLAN password is 8 digit numbers. Find
the ‘WLAN password’ printed in the label
outside of the PCS.
If the connection failed, try after turning off
the mobile data option on your mobile device.
Android : If the connection is successful, main
screen appears as shown in the gure.
iOS : If the connection is successful, run [LG
EnerVu Plus] app to display the main screen as
shown in the gure.
Operating
About Main Screen
The main screen displays and indicates current ESS status in the ESS status menu area. And you
can check the several settings and information in the ESS setting menu and ESS Information menu
areas.
The main screen displays and indicates current ESS status briey. When you select an area indicated
above, it displays detailed information.
2
Operating
yThe displayed values are not exact values. The values may differ from actual values.
yPlease turn on the AP again, if there is a problem at connection with AP.
A
Displays a notice list of system status.
When there is an error occurred, error code,
time and date are displayed on the list.
Refer to installation manual for more
information of messages.
Operating
19
B
C
Displays the [Energy Overview] information
on the screen.
Today’s self-consumption rate : Displays
rate of the consumed energy amount from
ESS today.
This month’s CO2 reduction : Displays
monthly amonut of CO2 reduction.
Generation: Displays generated energy
information.
Feed-in : Displays consumed energy
information.
PCS : Displays PCS information.
Displays generating status of the
connected PV briey.
The status values are the sum of PV1, PV2
and PV3.
Brand : PV Manufacturer (Default : LGE)
System Capacity : PV capability
DC Voltage : Current PV voltage
DC Power : Current PV power
DC Current : Current PV electric current
Today’s generation: Generated PV energy
today.
2
Operating
2
NOTE
Operating
Operating
20
After the heat pump setup is completed, you can check the heat pump status on the Home
D
screen.
Description of each state is as follows.
yNone : AWHP setting is disabled or not connected.
yH/P DHW On : ESS make increase the desired temperature of AWHP.
yH/P DHW Off : AWHP retains a original desired temperature
If PV system generate surplus power, Heat up the water in the heat pump and raise the
Self consumption.
E
Displays detailed status of energy
consumed in household.
Load Power : Current power consumed in
household
Today
Total consumption : Amount of
consumed energy today
From PV : Amount of energy from PV to
household today
From Battery : Amount of energy from
the battery to household today
From Grid : Amount of energy from the
power grid to household today
This month
Total consumption : Amount of
consumed energy this month
From PV : Amount of energy from PV to
household this month
From Battery : Amount of energy from
the battery to household this month
From Grid : Amount of energy from the
power grid to household this month
Operating
21
F
G
Displays charging and discharging status of
the battery briey.
Battery Status : Charging/Discharging/
Standby
Battery SOC: Current SOC (state of
charge) level
Winter Mode : Shows winter mode status.
DC Power : Current output power from
battery
Today
Charging : Amount of charged energy
to the battery today.
Discharging : Amount of discharged
energy from the battery today
This month
Charging : Amount of charged energy
to the battery in this month
Discharging : Amount of discharged
energy from the battery in this month
Displays current status of power grid.
Power: Current grid power
Voltage: Current grid voltage
Frequency : Current grid frequency
Today
Into Grid : Amount of sold energy today
From Grid : Amount of purchased
energy today
This month
Into Grid : Amount of sold energy today
and this month
From Grid : Amount of purchased
energy this month
2
Operating
H
[System Operating]
Tap switch to start or stop system
operation.
Operating
22
ESS Setting Menu
You can adjust general settings of the system. Select [main screen] > [] to display the [Setting]
screen.
Language
2
Select [] > [Language] to display the language selection screen.
Operating
Select the desired language.
Battery
Select [] > [Battery] to display the battery setting screen.
[Winter mode]
Tap this switch to select [Enable] or [Disable].
The minimum SOC level of winter mode can be
changed by the installer only.
[Backup mode]
Tap this switch to select [Enable] or [Disable].
The minimum SOC level of Backup mode can be
changed by the installer only.
[Operation Mode]
Tap this switch to select [Economic Mode] or
[Fast Charge Mode]. You can change mode on
your own.
Economic Mode : Make Feed- in more and make more efciency to System.
Fast Charge Mode : Make fast charge to battery First.
Operating
[Winter Mode Period]
Tap current value to display the setting menu. You can change the period
1. Select the currently selected value. Period setting menu is displayed.
2. Adjust [Month] and [Day] using S or W.
3. Select [APPLY] to complete the setting.
Energy Device
Select [] > [Energy Device] to display the Energy Device screen.
[EV]
Tap this switch to select [On] or [Off].
When ‘EV Meter Enable’ not setting, Error Popup
occurred.
Set the option [On] to enable EV monitoring.
[AWHP]
Tap this switch to select [On] or [Off].
If its status is “Connection Available“, wait until it becomes “Connected.” If it is not connected to
the end, check heat pump connection is connected properly.
The status description of the energy device is as follows.
yConnection Not Allowed : AWHP setting is disabled
yConnection Available : AWHP setting is enabled and is not connected
yConnected : AWHP setting is enabled and is connected
23
2
Operating
Quick Install Guide
Select [] > [Quick install guide] to display the install guidance screen.
You can check the brief installation instruction on the [Quick install Guide] screen.
Operating
24
Open source
You can check the open source information of the application and the system.
Select [
2
Operating
] > [Open source] to display the open source notice screen.
To obtain the source code under GPL, LGPL, MPL,
and other open source licenses, that is contained
in this product, please visit http://opensource.lge.
com.
In addition to the source code, all referred license
terms,
warranty disclaimers and copyright notices are
available for download. LG Electronics will also
provide open source code to you on CD-ROM
for a charge covering the cost of performing
such distribution (such as the cost of media,
shipping, and handling) upon email request to
opensource@lge.com. This offer is valid for
three(3) years from the date on which you
purchased the product.
Application information
Select [] > [Application information] to display the application information screen.
You can check the information of this application
such as application name, application package
name and application version.
Installer Settings
The system needs various system settingsby installer when installing. Users are not allowed to enter
[Installer Settings] menu. Try not to enter the menu. It may cause serious malfuction on the system,
if user changes settings on the[Installer Settings] menu.
Operating
ESS Information Menu
Energy Analysis
On [Energy Analysis], you can check the statistical information of this system.
You can review the amount of energy generated, consumed, sold and purchased on this system.
The statistical data of the day, week, month and year are supported.
PV Graph
Analyzes the energy generated and sold from PV within selected period and displays as a graph.
Select [PV Graph] on [Energy Analysis].
Generated energy is marked with green and sold
energy is marked with purple on the line graph.
You can change the period by tapping [Day],
[Week], [Month] and [Year].
: Goes to previous [Day], [Week], [Month] or
A
[Year].
: Goes to next [Day], [Week], [Month] or
D
[Year].
25
2
Operating
Battery Graph
Analyzes the energy charged and discharged on the battery within selected period and displays as a
graph.
Select [Batt Graph] on [Energy Analysis].
Charged energy is marked with green, discharged
energy is marked with purple, and current status
of the battery is marked with yellow on the line
graph.
You can change the period by tapping [Day],
[Week], [Month] and [Year].
: Goes to previous [Day], [Week], [Month] or
A
[Year].
: Goes to next [Day], [Week], [Month] or
D
[Year].
Operating
26
Load Graph
Analyzes the energy consumed and purchased from grid within selected period and displays as a
graph.
Select [Load Graph] on [Energy Analysis].
Consumed energy is marked with green, and
purchased energy is marked with purple.
2
Operating
You can change the period by tapping [Day],
[Week], [Month] and [Year].
: Goes to previous [Day], [Week], [Month] or
A
[Year].
: Goes to next [Day], [Week], [Month] or
D
[Year].
System Information
Displays system information of this ESS. You can
check information on PCS, battery and network
status. Scroll up or down to display next or
previous information.
Using EnerVu
Using EnerVu system
When this product is connected to the internet, you can check variety of information such as
system status, information, report using LG EnerVu web monitoring system.
NOTE
End users do not have to register in the EnerVu service. However, if the end user does not use
this service, it is not possible to enable maintenance via remote service (such as rmware update)
over the Internet.
27
Preparation
yAn internet browser installed computer, tablet or mobile with internet access are needed to
access LG ESS web monitoring system.
yThis product must be connected to internet. Check [Network] setting menu on the system.
Creating a New Account
A
B
On your browser, visit LG EnerVu page at
http://enervu.lg-ess.com.
Select [Sign Up] and then select your
nationality in the pop-up window. The
service agreement page appears.
Read the terms, conditions and privacy
policy carefully.
If you agree with every term and
condition, click the [I Agree] check box
and select [AGREE].
The account creation page appears.
3
Using EnerVu
Using EnerVu
28
C
3
Using EnerVu
D
Fill your mail address in [User ID] eld and
select [CHECK AVAILABILITY].
Fill in [Password], [Password conrm] and
[Birthday] elds and select [CONFIRM].
The e-mail conrmation page appears.
A conrmation e-mail will be sent to
your e-mail address. On your e-mail,
select [CONFIRM] to complete the e-mail
conrmation.
Using EnerVu
29
E
F
On the account creation page, select
[CONFIRM] to complete creating your
account.
Select [SIGN IN] to go to the [SIGN IN
WITH LG ACCOUNT] page.
Input your [User ID] and [Password] and
select [SIGN IN].
3
Using EnerVu
G
Available LG account services are
displayed on the screen.
Using EnerVu
30
Checking EnerVu Activation
A
3
Using EnerVu
B
C
On your browser, visit LG EnerVu page at
http://enervu.lg-ess.com.
OR
On your mobile app, select [
open the LG EnerVu page with a mobile
browser.
Input your [User ID] and [Password] and
select [SIGN IN].
You can see the screen on the left
when the registration and activation are
completed.
] to
You can see the screen on the left when
the registration is in incomplete status.
Input the registration number printed in
the label attached outside of the PCS
and select [Check] to complete the
registration and activation.
If a pop-up message on the left appears
on the screen, contact the installer to
activate your system.
Loading...
+ 146 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.