Lennox CBA27UHE-018, CBA27UHE-024, CBA27UHE-030, CBA27UHE-036, CBA27UHE-048 Installation Instructions Manual

...
INSTALLATION
©2017 Lennox Industries Inc. Dallas, Texas, USA
THIS MANUAL MUST BE LEFT WITH THE
HOMEOWNER FOR FUTURE REFERENCE
WARNING
This product contains a chemical known to the State of California to cause cancer, birth defects, or other reproductive harm.
WARNING
Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury or loss of life. Installation and service must be performed by a licensed professional HVAC installer or equivalent, service agency, or the gas supplier.
IMPORTANT
The Clean Air Act of 1990 bans the intentional venting of refrigerant (CFCs, HCFCs and HFCs) as of July 1, 1992. Approved methods of recovery, recycling or reclaiming must be followed. Fines and/or incarceration may be levied for noncompliance.
INSTRUCTIONS
Elite® Series CBA27UHE Air Handler Units
MULTI-POSITION AIR HANDLERS 507674-01 3/2017
Table of Contents
CBA27UHE Upow and Downow Unit Dimensions ..... 2
CBA27UHE Horizontal Left- and Right-Hand Discharge
Unit Dimensions .............................................................3
General Information ....................................................... 4
Shipping and Packing List .............................................4
Requirements ................................................................4
Installing the Unit ........................................................... 4
Brazing Connections .....................................................6
Installing the Condensate Drain ....................................7
Inspecting and Replacing Filters ...................................8
Sealing the Unit .............................................................8
Measuring Static Pressure ............................................9
Adjusting the Blower Speed ..........................................9
Making Electrical Connections ....................................12
Repairing or Replacing Cabinet Insulation .................. 15
Homeowner Maintenance ............................................15
Check-Out Procedures ................................................ 16
IMPORTANT: Special procedures are required for cleaning the all-aluminum coil in this unit. See page 15 in this instruction for information.
IMPORTANT INFORMATION FOR INSTALLER
CHECK FOR AND REMOVE THESE ITEMS BEFORE OPERATING UNIT.
TOP CAP SHIPPING
BRACKET (REPLACE
SCREWS IN TOP CAP
BLOWER HOUSING
SUPPORT PAD
HORIZONTAL DRAIN PAN (SEE PAGES 4 AND 6)
REFRIGERANT LINE PLUGS
D
(SEE PAGE 6)
AFTER REMOVAL)
DRIP SHIELD. (USED FOR -060 UNITS HORIZONTAL APPLICATIONS ONLY.) (SEE PAGE 5.) SHOWN INSTALLED ON DRAIN PAN IN -060 UNIT.
D
Page 1
CBA27UHE Upow and Downow Unit Dimensions – Inches (mm)
3/4 (19)
11‐1/16 (281)
LINE VOLTAGE
INLETS (TOP
AND LEFT SIDE)
TOP VIEW
FLOW
RETURN AIR
FRONT VIEW
SUPPLY AIR
D
AIR
F
OPENING
LOW VOLTAGE
INLETS (TOP AND
RIGHT SIDE)
5/8 (16)
3/4 (19)
5/8 (16)
G
ELECTRIC HEAT
(FIELD-INSTALLED)
A
H
FILTER ACCESS
UP-FLOW POSITION
OPTIONAL
SUCTION
LINE
LIQUID
LINE
FILTER
2
23/4 (70)
PIPING PLAT E DETAIL
13/4 (44)
43/8 (111)
31/2 (89)
(FOR UP-FLOW AND DOWN-FLOW POSITIONS)
11/8 (29)
(51)
53/8
(137)
CB
FILTER
SUCTION
BLOWER
COIL
RETURN AIR
)52( 1)61( 8/5
SIDE VIEW
E
5/8 (16)
LINE
LIQUID
LINE
OPTIONAL
ELECTRIC HEAT
(FIELD-INSTALLED)
LOW VOLTAGE
(RIGHT SIDE)
LINE VOLTAGE
(LEFT SIDE)
SUCTION LINE
CONDENSATE DRAINS (2) (HORIZONTAL)
LIQUID LINE
CONDENSATE DRAINS (2) (UP-FLOW AND DOWN-FLOW)
C
COIL
BLOWER
SUPPLY
11‐1/16 (281)
AIR
SIDE VIEW
5/8 (16)
5/8 (16)
5/8 (16)
DOWN-FLOW POSITION
5/8 (16)
F
Air Opening
E
1 (25)
TOP VIEW
B
AIR FLOW
SUPPLY AIR
D
FRONT VIEW
5/8 (16)
Return
FILTER ACCESS
H
A
G
5/8 (16)
CBA27UHE Common Dimensions - Inches (mm)
Dim. -018/-024 -030/-036 -042/-048 -060
A
B
C
D
E
F
G
H
49-1/4 (1251) 51 (1295) 58-1/2 (1486) 621/2 (1588)
21-1/4 (540) 21-1/4 (540) 211/4 (540) 211/4 (540)
20-5/8 (524) 225/8 (575) 24-5/8 (625) 24-5/8 (625)
19-3/4 (502) 19-3/4 (502) 193/4 (502) 193/4 (502)
19 (483) 21 (533) 23 (584) 23 (584)
20 (508) 20 (508) 20 (508) 20 (508)
24-5/8 (625) 263/8 (670) 277/8 (708) 277/8 (708)
24-5/8 (625) 24-5/8 (625) 30-5/8 (778) 345/8 (879)
Page 2
CBA27UHE Horizontal Left- and Right-Hand Discharge Unit Dimensions – Inches (mm)
53/8 (137)
CONDENSATE
DRAINS (2)
(UP-FLOW
AND
DOWN-FLOW)
CONDENSATE
DRAINS (2)
(HORIZONTAL)
PIPING PLAT E
DETAIL
5/8 (16)
5/8 (16)
5/8 (16)
53/4
(46)
E
RETURN AIR
OPENING
F
END VIEW
Horizontal Position
(LeftHand Air
Discharge)
13/4
(44)
(51)
2
11/2
(38)
1 (25)
FILTER ACCESS
LIQUID
LINE
SUCTION
LINE
11/8
(29)
43/8 (111)
FILTER
Horizontal Position
(RightHand Air
Discharge)
Coil
LIQUID
SUCTION
LINE
LINE
TOP VIEW
A
H
AIR
FLOW
FRONT VIEW
C
BLOWER
BLOWER
OPTIONAL ELECTRIC
HEAT (FIELD-INSTA LLED)
G
Coil
5/8 (16)
B
INLETS (BOTTOM
C
LINE VOLTAGE
INLETS (TOP
AND RIGHT
SIDE)
LOW VOLTAGE
AND RIGHT
SIDE)
FOR DIMENSIONS “A” THROUGH
“H”, SEE CHART ON PAGE 2.
11‐1/16
3/4 (19)
(281)
Supply
43/8 (111)
11/8
(29)
Air
Opening
END VIEW
D
3/4 (19)
3/4 (19)
3/4 (19)
3/4 (19)
LOW VOLTAGE
3/4 (19)
11‐1/16
(281)
Supply
D
Air Opening
LINE VOLTAGE INLETS
(BOTTOM AND LEFT SIDE)
END VIEW
INLETS (TOP AND
LEFT SIDE)
OPTIONAL ELECTRIC
HEAT (FIELD INSTALLED)
5/8 (16)
B
CONDENSATE DRAINS (2)
(HORIZONTA L)
G
Air Flow
FILTER
TOP VIEW
A
FRONT VIEW
SUCTION
LINE
H
13/4
(44)
LIQUID
LINE
53/4 (146)
SUCTION LINE
PIPING PLAT E
DETAIL
FILTER ACCESS
11/2 (38)
LIQUID
LINE
1 (25)
E
Return
Air Opening
END VIEW
(51)
2
53/8 (137)
5/8 (16)
5/8 (16)
F
5/8 (16)
Page 3
CAUTION
As with any mechanical equipment, contact with sharp sheet metal edges can result in personal injury. Take care while handling this equipment and wear gloves and protective clothing.
General Information
The Elite® CBA27UHE series air handler with all-alumi­num coil is designed for installation with optional eld-in-
stalled electric heat and a matching HFC-410A outdoor unit.
This instruction is intended as a general guide and does not supersede local or national codes in any way. Consult authorities having jurisdiction before installation.
Shipping and Packing List
Package 1 of 1 contains: 1 – Assembled air handler unit
1 – Horizontal drip shield (CBA27UHE-060 only) 1 – Pipe nipple (Sch80, 3/4" I.D. x 5"
1 – Warranty card
NOTE – For downow applications, order kit number
83M57.
Check the air handler for shipping damage; if found, im­mediately contact the last carrier.
Requirements
IMPORTANT
This unit must be matched with an indoor coil as specied
in the Lennox Engineering Handbook. Coils previously
charged with HCFC-22 must be ushed.
In addition to conforming to manufacturer’s installation in­structions and local municipal building codes, installation of Lennox air handler units (with or without optional elec­tric heat), shall conform with the following National Fire Protection Association (NFPA) standards:
• NFPA No. 90A - Standard for Installation of Air Condi­tioning and Ventilation Systems
• NFPA No. 90B - Standard for Installation of Residence Type Warm Air Heating and Air Conditioning Systems
This unit is approved for installation clearance to combus­tible material as stated on the unit rating plate. Accessi­bility and service clearances must take precedence over combustible material clearances.
To disassemble:
1 - Remove access panels.
2 - Remove both blower and coil assemblies. This will
lighten the cabinet for lifting.
3 - Remove one screw from the left and right posts
inside the unit. Remove one screw from each side on the back of the unit. Unit sections will now separate.
To reassemble:
1 - Align cabinet sections together.
2 - Reinstall screws.
3 - Replace blower and coil assemblies.
4 - Replace access panel.
UPFLOW APPLICATION
Use the following procedures to congure the unit for up­ow operations:
1 - Remove access panels.
2 - Remove and discard the horizontal drip shield (-060
model, used only on horizontal applications) and the corrugated padding between the blower and coil assembly.
3 - The horizontal drain pan must be removed when
the coil blower is installed in the upow position.
Removing the horizontal drain pain will allow proper
air ow and increased efciency.
4 - After removing the horizontal drain pan, place the
unit in the desired location. Set unit so that it is level. Connect return and supply air plenums as required
using sheet metal screws as illustrated in gure 1.
5 - Install units that have no return air plenum on a
stand that is at least 14" from the oor to allow for proper air return. Lennox offers an optional upow
unit stand as listed in table 1.
HORIZONTAL DRAIN PAN (MUST BE REMOVED)
UP-FLOW / DOWN-FLOW DRAIN PAN
Installing the Unit
These units are factory-congured for upow and hori­zontal right-hand discharge installation. For downow or horizontal left-hand discharge, certain eld modications
are required.
DISASSEMBLE/REASSEMBLE AIR HANDLER UNITS
The air handler units consists of two factory-assembled sections. It may be necessary to disassemble the sections when positioning the unit for installation.
FIGURE 1. Upow Conguration
TABLE 1. Optional Side-Return Unit Stand
(Upow Only)
Model Kit Number
All unit sizes 45K32
Page 4
HORIZONTAL RIGHT-HAND DISCHARGE
UP-FLOW / DOWN-FLOW DRAIN
HORIZONT PA
FRONT VIEW END VIEW
TOP CAP ROTATED TO
APPLICATION
Use the following procedures to congure the unit for hor­izontal right-hand discharge operations:
NOTE – For horizontal applications, a secondary drain pan is recommended. Refer to local codes.
1 - Before operating the unit, remove access panels
and the horizontal drip shield (-060 model) and the corrugated padding between the blower and coil assembly. Discard the corrugated padding.
2 - Install the horizontal shield on the front edge of the
horizontal drain pan as illustrated in gure 2.
3 - No further adjustment is necessary. Set unit so that
it is sloped 1/4" towards the drain pan end of the unit.
4 - If the unit is suspended, the entire length of the
cabinet must be supported. If you use a chain or strap, use a piece of angle iron or sheet metal attached to the unit (either above or below) to support the length of the cabinet. Use securing screws no longer than 1/2" to avoid damaging the
coil or lter as illustrated in gure 3. Use sheet
metal screws to connect the return and supply air plenums as required.
HORIZONTAL DRIP SHIELD (-060 MODELS)
PAN
1/2" SCREWS MAXIMUM
ANGLE IRON OR
SHEET METAL
ELECTRICAL INLET CLEARANCE 4" (102 mm)
FIGURE 3. Suspending Horizontal Unit
IMPORTANT
When removing the coil, there is possible danger of equipment damage and personal injury. Be careful when removing the coil assembly from a unit installed in right­or left-hand applications. The coil may tip into the drain pan once it is clear of the cabinet. Support the coil when removing it.
HORIZONTAL LEFT-HAND DISCHARGE APPLICATION
NOTE – For horizontal applications, a secondary drain pan is recommended. Refer to local codes.
CABINET
SUPPORT
DRIP
SHIELD
CORRECT POSITION
TOP CAP SCREWS
N
FIGURE 2. Right-Hand Discharge Conguration
HORIZONTAL RIGHT-HAND DISCHARGE APPLICATION IN HIGH-HUMIDITY AREAS
For horizontal applications in high humidity areas, remove
the downow rail closest to the drain pan.
To remove rail:
1 - Remove the screws from the rail at the back of unit
and at the cabinet support rail.
2 - Remove the downow rail then replace screws.
3 - Seal around the exiting drain pipe, liquid line, and
suction line to prevent humid air from inltrating into
the unit.
AL DRAIN
NO ADJUSTMENT IS NECESSARY
DOWN-FLOW RAIL
90º
BEND
DRAIN PAN
REINSTALLED
HERE
REINSTALLED HERE REMOVED FROM HERE
COIL SHOWN IN UPLOAD POSITION FOR EASY CONVERSION
TOP CAP
90º
BEND
———— DRAIN PLUGS ————
ALIGN HOLES WITH HOLES IN COIL END PLATE. STARTING WITH THE ROUND HOLES ON THIS END.
BACK COIL END SEAL
FIGURE 4. Field Modication for
Left-Hand Discharge
DRAIN PAN
SHIPPING
LOCATION
Page 5
Use the following procedures to congure the unit for hor-
HORIZONTAL DRIP SHIELD (-060 MODEL)
DRAIN PAN
izontal left-hand discharge operations:
1 - Before operating the unit, remove access panels
and the horizontal drip shield (-060 model) and the corrugated padding between the blower and coil assembly. Discard the corrugated padding.
2 - Pull the coil assembly from unit. Pull off the
horizontal drain pan.
3 - Remove the drain plugs from back drain holes on
horizontal drain pan and reinstall them on front holes.
IMPORTANT
After removal of drain pan plug(s), check drain hole(s) to verify that drain opening is fully open and free of any debris. Also check to make sure that no debris has fallen into the drain pan during installation that may plug up the drain opening.
4 - Rotate drain pan 180º front-to-back and install it on
the opposite side of the coil.
5 - Remove screws from top cap. Remove horizontal
drip shield screw located in the center of the back
coil end seal as illustrated in gure 4 on page 5.
6 - Rotate horizontal drip shield 180º front-to-back.
7 - Remove plastic plug from left hole on coil front
end seal and reinstall plug in back hole. Reinstall horizontal drip shield screw in front coil end seal. Drip shield should drain downward into horizontal drain pan inside coil.
10 - Install the horizontal shield (-060 model) on the
front edge of the horizontal drain pan as illustrated
in gure 5 on page 6.
NOTE – For horizontal applications in high humidity ar- eas, remove the downow rail closest to the drain pan. To remove rail, remove screw from rail at back of unit and at cabinet support rail. Remove downow rail then replace screws. Also, seal around the exiting drain pipe, liquid and suction lines to prevent inltration of humid air.
11 - Knock out drain seal plate from access door. Secure
plate to cabinet front ange with screw provided.
12 - Flip access door and replace it on the unit.
13 - Set unit so that it is sloped 1/4ʺ toward the drain
pan end of the unit. Connect return and supply air plenums as required using sheet metal screws.
14 - If suspending the unit, it must be supported along the
entire length of the cabinet. If using chain or strap, use a piece of angle iron or sheet metal attached to the unit (either above or below) so that the full length of the cabinet is supported. Use securing
screws no longer than 1/2ʺ to avoid damage to coil or lter, as illustrated in gure 3 on page 5. Connect
return and supply air plenums as required using sheet metal screws.
DOWNFLOW APPLICATION
NOTE – If downow application is required, separately order kit number 83M57 and install per kit’s instructions. Also use metal or class I supply and return air plenums.
Use the installation instruction provided with the downow kit.
DOWN-FLOW RAIL FRONT EDGE OF HORIZONTAL
FIGURE 5. Left-Hand Discharge Conguration
8 - Rotate top cap 180º front-to-back and align with
unused screw holes. Holes must align with front and back coil end plates. The top cap has a 45º bend on one side and a 90º bend on the other. The 90º bend
must be on the same side as the horizontal drain
pan as illustrated in gure 4 on page 5.
NOTE – Be very careful when reinstalling the screws into the coil end plate engaging holes. Misaligned screws may damage the coil.
9 - From the upow position, ip cabinet 90º to the
left and set into place. Replace blower assembly. Secure coil in place by bending down the tab on the
cabinet support rail as illustrated in gures 4 and 5.
IMPORTANT
If electric heat section with circuit breakers (ECB29) is
installed in a CBA27UHE unit in a downow application,
the circuit breakers must be rotated 180° to the UP position. See ECB29 installation instructions for more details.
Brazing Connections
IMPORTANT
To prevent the build-up of high levels of nitrogen when purging, it must be done in a well-ventilated area. Purge low-pressure nitrogen (1 to 2 psig) through the refrigerant piping during brazing. This will help to prevent oxidation and the introduction of moisture into the system.
All coils are equipped with a factory-installed, internally mounted check/expansion valve.
The air handler’s coil line sizes are listed in table 2. Use Lennox L15 (sweat) series line sets (refer to the outdoor
unit Product Specications (EHB) for proper size, type and application). For eld-fabricated refrigerant lines, see
the piping section of the Lennox Unit Information Service Manual.
Page 6
Loading...
+ 12 hidden pages