Legrand RFB User Manual

Legrand/Wiremold electrical systems conform to and should be properly grounded in compliance with requirements of the current National Electrical Code or codes administered by local authorities.
All electrical products may present a possible shock or fire hazard if improperly installed or used. Legrand/Wiremold electrical products may bear the mark as UL Listed and/or Classified and should be installed in conformance with current local and/or the National Electrical Code.
RFB Series Floor Boxes
I N S T A L L A T I O N I N S T R U C T I O N S
nstallation Instruction No.: 1 007 256R2 – Updated January 2012
I
PRODUCTS: Floor Box Cat. Nos.: RFB4E, RFB4E-OG, RFB6, RFB6-OG, RFB6E, RFB6E-OG
Device Plate Cat. Nos.: RFB6B, RFB6DP, RFB6GFI, RFB6S1, RFB6S2, RFB6RT, RFB6EXT, RFB62A, RFB6-AAP
Furniture Feed Kit Cat. Nos.: RFB4KIT, RFB6KIT Bare Concrete & Terrazzo Ring Cat. Nos.: RFB4E-CTR, RFB6E-CTR
RFB Series Floor Boxes and Activations are UL Listed for use with tile, terrazzo and carpet covered concrete floors. RFB6 and RFB6-OG Floor Boxes and Activations are also UL Listed for use with floors of wood construction.
BEFORE CONCRETE POUR:
Step 1. Determine box location and conduit layout.
Step 2. Take off box top by removing two (2) #8-32 screws
Step 3. Remove necessary knockouts. Attach conduit and
attaching cover to base.
fittings (not supplied by Wiremold) to steel base.
IMPORTANT: Please read all instructions
before beginning.
(2) #8-32 Screws
Remove KOs & attach Fittings and Conduit
Step 4. Configure adjacent compartments.
RFB4E – Remove and discard Barrier for pass through
Replace #8 Screw after removing Barrier
RFB4E Series Boxes are configured with solid removable partitions that can be discarded for wire pass through. Replace #8 screw back into base after barrier removal.
Step 5. Re-attach box cover to base with two (2) #8-32 screws
removed during Step 2.
RFB6 & RFB6E – Remove Plug and replace with Bushing as required for pass through
RFB6 and RFB6E Series Boxes are configured with non-removable partitions containing pre-installed plugs. Depending on wiring configuration, plugs may be replaced with included bushings for wire pass through. This may be done pre- or post-pour.
CONCRETE POUR:
Step 6. Level box, adjust to required height, and secure in place.
/16"
1 2mm]
[
1/4"
3 83mm]
[
RFB6 Series – Insert the rectangular mudcap in plastic collar. Pour concrete 1/16” above top edge of plastic collar.
WARNING: Pours of 1/4” (6 mm) or more over box housing will
ake it difficult to break out the mud cap and cause
m excessive concrete spalling.
djust RFB6 1/16" [2mm]
A
elow screed line
b
(RFB4E & RFB6E Series) Pour concrete flush with top of steel cover plate.
Step 7. RFB4E & RFB6E Series with Finished Concrete Floor
Attach Terrazzo / Bare Concrete Kit Cat. No. RFB4E-CTR or RFB6E-CTR to floor box prior to concrete pour. Remove and discard steel cover plate. Attach round edge barrier to plastic collar on box using four (4) #8 flat head screws. Insert round plastic cover plate into edge barrier and attach with remaining two (2) #8 flat head screws. Screed concrete level with top of edge barrier. The edge barrier will remain in place and the round plastic cover plate will be discarded during cover installation.
NOTE: Cat. No. RFB4E-CTR, Terrazzo/Bare
Concrete Kit. is intended for use with cover Cat. No. 6CT. This kit will not work with Furniture Feed Cover, Cat. No. 6CFFTC.
Cat. No. RFB6E-CTR, Terrazzo/Bare Concrete Kit is intended for use with Cat. No. 8CT.
Plastic Cover Plate
traight Through Hole – align with
S isolated hole on plastic collar
ountersink hole – align with
C hole adjacent to collar ear
Edge Barrier
Plastic Collar
Screw hole adjacent to plastic collar ear
Align four (4) countersink holes in edge barrier with four (4) holes adjacent to plastic collar ears and mount with four (4) #8 screws.
AFTER CONCRETE POUR:
Step 8. RFB4E & RFB6E Series with Terrazzo over Concrete Floor (If needed)
Remove the flat steel plate and replace with the Terrazzo / Bare Concrete Kit Cat. No. RFB4E CTR or RFB6E-CTR as shown in Step 7. Pour terrazzo flush with top of the edge barrier.
2
Terrazzo over-pour
Edge Barrier
Concrete
Step 9. Remove mud cap from box and clean out any
debris from inside of box.
RFB6 Mud Cap Removal
hip out concrete and
C
ift out Mud Cap
l
RFB6 Series – Chip away concrete located in mud cap and remove. If concrete does not break cleanly around preset,
RFB4E & RFB6E Mud Cap Removal
RFB4E & RFB6E Series – Remove the two (2) #8 screws
securing the stell plate mud cap. the activation might not be properly supported. The concrete edges around the top opening of the installed box must be smooth and level for the proper fit of the FloorPort Activations.
Step 10. Wire devices (not supplied by Wiremold) in accordance to the NEC and any local codes. Mount
devices to device plates as shown. Lower device plate into floor box and slide back into position. Secure device plate to floor box base with two (2) #8-32 mounting screws pre-installed in base of box.
emove two (2) #8 Screws
R securing the steel plate
ud Cap
M
Secure the receptacle to the receptacle device plate with two (2) screws and nuts. Attach the receptacle device plate(s) to the base with the two (2) #8-32 mounting screws provided.
Step 11. (RFB6 only for use with FloorPortTMSeries
Activations) Attach cover mounting hardware provided in hardware bag supplied with floor box. Thread #10-24 x 2 in. hex standoff onto stud projecting upward from floor box base. Insert two (2) threaded adjusting screws into standoffs and place link strap over head of threaded adjusting screws. Secure link strap to threaded adjusting screws with two (2) #8-32 x 3/16 in. screws. Complete installation of cover following directions provided with FloorPort
TM
Series Activation
Instruction Sheet 1008150.
Insulator placed between GFI and Device Plate
NOTE: Use insulator as shown with Cat. No. RFB6GFI.
#10-24 Threaded Adjusting Screw
#10-24 x 2" hex standoff
#10-24 x 2" Stud
3
#8-32 x 3/16"
Link Strap
Step 12. RFB6KIT Furniture Feed Barrier Kit for use with FloorPort
FPFF Furniture Feed Series Activations on RFB6 floor box.
TM
Step 12A. Insert lower barrier into floor box and fasten with
two (2) #8-32 x 3/16 screws removed from base.
2) #8 Mounting Screws
(
from base)
(
RFB6KIT lower
artition
P
Step 12C. Complete installation following directions provided
with FloorPort
FPFF Furniture Feed Cover.
Step 12B. Attach upper barrier to FloorPort™ FPFF Furniture
Feed Cover Flange with two (2) #8-32 screws. Secure ground wire to underside of flange.
RFB6KIT upper
artition
P
Attach ground wire
ith ground Screw
w
2) #8-32 flat
( head Screws
4
Step 13. RFB4KIT Furniture Feed Barrier Kit for use with Evolution
6CFFTC Furniture Feed Activation on RFB4E floor box.
tep 13A. Insert lower barrier into floor box and fasten with
S
two (2) #8-32 x 3/16" screws removed from base.
NOTE: Power feed compartment is only supplied along
the side perpendicular to the top plate hold down screw.
FB4KIT Lower Partition
R
wo (2) #8-32 mounting
T Screws (from base)
ower Feed Compartment
P
op Plate Hold Down
T
Step 13C. Complete installation following directions provided
with Evolution 6CFFTC Furniture Feed Activation.
Step 13B. Attach upper barrier to 6CFFTC Furniture Feed
Cover Flange with two (2) #8-32 screws. Secure ground wire to underside of flange.
RFB4KIT Upper Partition
wo (2) #8-32 Screws
T
ttach ground wire with
A ground Screw
5
Step 14. RFB6 Floor Box used in wood floors.
Determine box location and orientation. Cut a 6" [152 mm] x 7 1/4" [184 mm] opening in wood floor centered over desired location.
4) sheet metal screws
( (not included)
Align plastic trim ring on top of box with opening in floor, and secure box to underside of floor with four (4) #8 or four (4) #10 pan head sheet metal screws, (not supplied by Wiremold), through the four (4) holes provided in cover.
ut a 6" [152mm] x 7 1/4"
C [184mm] opening in wood floor
4) tab on each
(
orner of upper plate
c
Continue installation following previous instructions. Complete procedure by installing a FloorPort Series Activation (sold separately), using the installation instructions provided with that unit.
© Copyright 2009 Legrand/Wiremold All Rights Reserved
WIREMOLD
U.S. and International:
60 Woodlawn Street • West Hartford, CT 06110 1-800-621-0049 • FAX 860-232-2062 • Outside U.S.: 860-233-6251
Canada:
570 Applewood Crescent • Vaughan, Ontario L4K 4B4 1-800-723-5175 • FAX 905-738-9721
1 007 256R2 0112
Loading...