Legrand RFB User Manual

Legrand/Wiremold electrical systems conform to and should be properly grounded in compliance with requirements of the current National Electrical Code or codes administered by local authorities.
All electrical products may present a possible shock or fire hazard if improperly installed or used. Legrand/Wiremold electrical products may bear the mark as UL Listed and/or Classified and should be installed in conformance with current local and/or the National Electrical Code.
RFB Series Floor Boxes
I N S T A L L A T I O N I N S T R U C T I O N S
nstallation Instruction No.: 1 007 256R2 – Updated January 2012
I
PRODUCTS: Floor Box Cat. Nos.: RFB4E, RFB4E-OG, RFB6, RFB6-OG, RFB6E, RFB6E-OG
Device Plate Cat. Nos.: RFB6B, RFB6DP, RFB6GFI, RFB6S1, RFB6S2, RFB6RT, RFB6EXT, RFB62A, RFB6-AAP
Furniture Feed Kit Cat. Nos.: RFB4KIT, RFB6KIT Bare Concrete & Terrazzo Ring Cat. Nos.: RFB4E-CTR, RFB6E-CTR
RFB Series Floor Boxes and Activations are UL Listed for use with tile, terrazzo and carpet covered concrete floors. RFB6 and RFB6-OG Floor Boxes and Activations are also UL Listed for use with floors of wood construction.
BEFORE CONCRETE POUR:
Step 1. Determine box location and conduit layout.
Step 2. Take off box top by removing two (2) #8-32 screws
Step 3. Remove necessary knockouts. Attach conduit and
attaching cover to base.
fittings (not supplied by Wiremold) to steel base.
IMPORTANT: Please read all instructions
before beginning.
(2) #8-32 Screws
Remove KOs & attach Fittings and Conduit
Step 4. Configure adjacent compartments.
RFB4E – Remove and discard Barrier for pass through
Replace #8 Screw after removing Barrier
RFB4E Series Boxes are configured with solid removable partitions that can be discarded for wire pass through. Replace #8 screw back into base after barrier removal.
Step 5. Re-attach box cover to base with two (2) #8-32 screws
removed during Step 2.
RFB6 & RFB6E – Remove Plug and replace with Bushing as required for pass through
RFB6 and RFB6E Series Boxes are configured with non-removable partitions containing pre-installed plugs. Depending on wiring configuration, plugs may be replaced with included bushings for wire pass through. This may be done pre- or post-pour.
CONCRETE POUR:
Step 6. Level box, adjust to required height, and secure in place.
/16"
1 2mm]
[
1/4"
3 83mm]
[
RFB6 Series – Insert the rectangular mudcap in plastic collar. Pour concrete 1/16” above top edge of plastic collar.
WARNING: Pours of 1/4” (6 mm) or more over box housing will
ake it difficult to break out the mud cap and cause
m excessive concrete spalling.
djust RFB6 1/16" [2mm]
A
elow screed line
b
(RFB4E & RFB6E Series) Pour concrete flush with top of steel cover plate.
Step 7. RFB4E & RFB6E Series with Finished Concrete Floor
Attach Terrazzo / Bare Concrete Kit Cat. No. RFB4E-CTR or RFB6E-CTR to floor box prior to concrete pour. Remove and discard steel cover plate. Attach round edge barrier to plastic collar on box using four (4) #8 flat head screws. Insert round plastic cover plate into edge barrier and attach with remaining two (2) #8 flat head screws. Screed concrete level with top of edge barrier. The edge barrier will remain in place and the round plastic cover plate will be discarded during cover installation.
NOTE: Cat. No. RFB4E-CTR, Terrazzo/Bare
Concrete Kit. is intended for use with cover Cat. No. 6CT. This kit will not work with Furniture Feed Cover, Cat. No. 6CFFTC.
Cat. No. RFB6E-CTR, Terrazzo/Bare Concrete Kit is intended for use with Cat. No. 8CT.
Plastic Cover Plate
traight Through Hole – align with
S isolated hole on plastic collar
ountersink hole – align with
C hole adjacent to collar ear
Edge Barrier
Plastic Collar
Screw hole adjacent to plastic collar ear
Align four (4) countersink holes in edge barrier with four (4) holes adjacent to plastic collar ears and mount with four (4) #8 screws.
AFTER CONCRETE POUR:
Step 8. RFB4E & RFB6E Series with Terrazzo over Concrete Floor (If needed)
Remove the flat steel plate and replace with the Terrazzo / Bare Concrete Kit Cat. No. RFB4E CTR or RFB6E-CTR as shown in Step 7. Pour terrazzo flush with top of the edge barrier.
2
Terrazzo over-pour
Edge Barrier
Concrete
Loading...
+ 4 hidden pages