3. 33/64" diameter hole saw for cutting into side wall
4. Reciprocating saw with saw blades for cutting sheet metal
5. Pilot drill sized to fit the saw blade
6. Phillips head screwdriver with #1 point
7. Slotted screwdriver with 3/32 blade width
WARNING: If the monitor is to be installed on a hood with
Hardiboard“ fiber-cement panels or similar material, use a
special hole saw designed for glass and other hard, abrasive
materials. Failure to do so may shatter or crack the panel.
DANGER: Always wear eye protection when using power
tools. Observe all necessary precautions when installing or
re
Procedure
Step 1:Determine the mounting location of the monitor. Use the cardboard template
Step 2:Using the template, mark off the 3" high by 2" wide hole necessary to clear
airing monitors near electrical equipment.
supplied as a guide for the size of the installed product and the hole needed to
be cut out of the hood. The cutout required is 3" high by 2" wide, which is
the typical size required for a single switch electrical box. If the cardboard
template is not available, a dimensioned pictorial is at the back of the manual
included with the monitor.
the rear enclosure portion of the monitor. Mark off the two mounting screw
hole locations.
Step 3:Drill a pilot hole in each of the four corners. Use the saw to cut out the hole.
A suitable nibbling tool may also be used.
Step 4:Drill the two #37 mounting screw holes.
Step 5:Drill one hole 33/64" diameter in the side wall of the fume hood
approximately 6" behind the sash and even with the sash bottom when it is
fully open. Insert the side wall adapter from the inside of the hood and
securely lock it in place from the back with the lock ring.
Step 6:Connect the input/output signal wiring, if required, to the terminal block on
the back of the monitor. See the Electrical Wiring section for wiring
information.
Step 7:Connect one end of the supplied air hose to the side wall adapter. Route the
hose as necessary to prevent kinks and bends which can affect the calibration.
Trim slightly if required. Firmly connect the other end to the flow tube on
the rear of the monitor.
Step 8:Connect the power cord to the power jack.
Step 9:Screw the monitor to the fume hood.
Step 10:Mount the junction box supplied to the top of the fume hood as indicated in
the illustration. The location should be placed so that the power cable from
the blower and light switches reaches the junction box. (Proper planning is
essential).
Step 11:Provide power to the supplied receptacle outlet with the supplied cable. The
9742900 cable is wired from the switches to the receptacle. See the optional
airflow monitor switch wiring detail to wire.
Step 12:Attach the electrical receptacle cover plate and plug the power supply into the
wired receptacle outlet. Power is now supplied to the monitor.
Step 13:The installation of the monitor is now complete.
Warranty-
We are committed to providing our customers with quality equipment and service after the sale.
Part of this objective involves keeping you informed of changes and new product additions.
Labconco Corporation warrants products of its manufacture for one year, from receipt of
the equipment by the purchaser, against defects in materials and workmanship. This
limited warranty covers parts and labor but not transportation and insurance charges. In
the event of a warranty claim, contact the dealer who sold you the product. If the cause is
determined to be a manufacturing fault, the dealer or Labconco Corporation will repair or replace
all defective parts to restore the unit to operation. Under no circumstances shall LabconcoCorporation be liable for indirect, consequential or special damages of any kind. This
statement of warranty may be altered by specific published amendments. No individual has
authorization to alter the provisions of this warranty policy or its amendments. Lamps and
expendable items such as filters are not covered by this warranty. Damage due to corrosion or
accidental breakage is also not covered.
WARNING: various federal, state or local regulations may govern the disposal and/or emission
of substances used in connection with this equipment. All users of this equipment are urged to
become familiar with any regulations that apply in the user s area concerning the dumping of
waste materials in or upon water, land or air and to comply with such regulations.
Shipping Claims-
If a shipment is received in visibly damaged condition, be certain to make a notation on the
delivering carrier s receipt and have his agent confirm the damage on your receipt. Otherwise,
the damage claim may be refused.
If concealed damage or pilferage is discovered, notify the carrier immediately and retain the
entire shipment intact for inspection. Interstate Commerce Commission rules requires that the
claim be filed with the carrier within 15 days after delivery.
NOTE: Do not return goods. Goods returned without prior authorization will not be accepted.
Labconco Corporation and its dealers are not responsible for shipping damage. The recipient
must file claims directly with the freight carrier. If authorization has been received to return this
product, by accepting this approval, the user assumes all responsibility and liability for biological
and chemical decontamination and cleansing. Labconco reserves the right to refuse delivery of
any products that do not appear to have been properly cleaned and/or decontaminated prior to
return.
Contacting Labconco-
If you have any questions that are not addressed in these instructions, or if you need technical
assistance, please contact Labconco s Sales Information Department at either l-(800) 821-5525,
and Service Information at (800)-522-7658 or (816) 333-8811, between the hours of 7:00 a.m.
and 6:00 p.m. Central Standard Time. Visit the Internet at
http://www.labconco.com or email
:labconco@labconco.com
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.