Kohler Thermostatic Electric Shower User Manual

Mira Azora Thermostatic Electric Shower
Installation & User Guide
These instructions are to be left with the user
1
Contents
Introduction ................................................................................................3
Important Safety Information .....................................................................4
Pack Contents Checklist ...........................................................................6
Specications ............................................................................................8
Installation Requirements .......................................................................... 8
Installation ............................................................................................... 11
Commissioning ........................................................................................ 17
User Instructions .....................................................................................19
Fault Diagnosis ........................................................................................21
Maintenance ............................................................................................ 23
Mira Azora Spare Parts List .....................................................................26
Mira Energise Shower Fittings Spare Parts List ...................................... 28
Dimensions ..............................................................................................29
Wiring Diagram ........................................................................................30
Customer Services ..................................................................................31
2
Introduction
Thank you for purchasing a quality Mira product. To enjoy the full potential of your new product, please take time to read this guide thoroughly. Having done so, keep it handy for future reference.
The Mira Azora is a thermostatic electric shower with separate controls for power
selection and temperature/ow adjustment. A unique thermostatic valve stabilizes temperature changes caused by water pressure uctuations. These can result from taps being turned on or off, or a toilet being ushed. An individual light indi-
cates “ON/OFF”.
The Mira Azora comes complete with a set of Mira Energise Shower Fittings.
Mira Azora 9.8 kW
A 9.8 kW 240 V AC (9.0 kW 230 V AC) heater with Mira Azora adjustable spray handset with four different spray actions (start, soothe, force and eco*). Supplied
complete with exible hose, clamp bracket assembly, slide bar, supports, hose retaining ring and soap dish. Available in a satin chrome and glass nish.
* The eco setting reduces the water ow to give economical use of water, whilst
still giving an adequate shower performance. This setting performs best with most gravity, pumped, and mains pressure unvented systems. On electric showers and some combination boiler systems the economy setting will have no effect, and will give the same spray action as the start setting.
Patents and Design Registration
Design Registration: 000578463-001-002
Patents: GB2341667, Ireland 82835
Patent Applications: GB0612240.2, GB0415901.8, Ireland 2006/0462
If you experience any difculty with the installation or operation of your new
shower, then please refer to the Fault Diagnosis section, before contacting
Kohler Mira Ltd. Our telephone and fax numbers can be found on the back
cover of this guide.
3
Important Safety Information
Installation must be carried out in accordance with these instructions, and
must be conducted by designated, qualied and competent personnel.
Warning!
Follow all warnings, cautions and instructions contained in this guide, and on or inside the appliance.
1. Products manufactured by us are safe and risk-free, provided that they are installed, used and maintained in good working order, in accordance with our instructions and recommendations.
2. Isolate the electrical and water supplies before commencing installation. The electricity must be turned off at the mains and the appropriate circuit fuse removed, if applicable.
3. Mains connections are exposed when the cover is removed.
4. Refer to the wiring diagram before making any electrical connections (see internal wiring diagram at the back of the book).
5. Make sure that any pipework that could become frozen is properly insulated.
6. Having completed the installation, make sure that the user is familiar with the operation of the appliance.
7. Make sure that this guide is left with the user.
8. DO NOT commission this appliance if water leaks from the unit or the heater tank pressure relief valve.
9. DO NOT t any form of outlet control (e.g. Trigger handset) as the outlet acts as a vent for the tank body. Only Mira recommended outlet ttings should be
used.
10. Ensure all electrical connections are tight, to prevent overheating.
11. Warning! DO NOT operate this appliance if it is frozen. Allow the appliance to
thaw before using. The shower unit must not be tted where it may be exposed
to freezing conditions.
12. This product is not suitable for areas with high humidity (i.e. steam rooms). Please consult your installer.
13. THIS APPLIANCE MUST BE EARTHED. ENSURE SUPPLEMENTARY BONDING COMPLIES WITH THE “REQUIREMENTS FOR ELECTRICAL INSTALLATIONS”.
In accordance with the current edition of “The Plugs and Sockets etc. (Safety)
Regulations” in force at the time of installation, this Mira Escape is intended to
be permanently connected to the xed electrical wiring of the mains system.
4
Caution!
1. Read all of these instructions and retain this guide for later use.
2. The electrical installation must comply to “BS 7671 - Requirements for Electrical Installations”, commonly referred to as the IEE Wiring Regulations - Part 7, or
any particular regulations and practices, specied by the local electricity supply
company.
3. The plumbing installation must comply with the requirements of UK Water Regulations/Bye-laws (Scotland), Building Regulations or any particular regulations and practices, specified by the local water company or water undertakers.
4. Make sure that you fully understand how to operate this shower and make sure that it is properly maintained in accordance with the instructions given in this manual.
5. Anyone who may have difculty understanding or operating the controls of any
shower should be attended whilst showering. Particular consideration should be given to:
The young, the elderly, the inrm, the disabled, anyone who suffers from
a medical condition that can result in temporary incapacity (e.g. epilepsy
or blackouts), anyone inexperienced in the correct operation of the
controls.
6. Sunburn or skin conditions can increase your sensitivity to hot water. Make sure that you set the shower to a cooler temperature.
7. If any of the following conditions occur, isolate the electricity and water supplies
and refer to ”Customer Services”, in the back page of this guide.
• If the cover is not correctly tted and water has entered the
appliance case.
• If the case is damaged.
• If the appliance begins to make an odd noise, smell or smoke.
• If the appliance shows signs of a distinct change in performance, indicating a need for maintenance.
DO NOT operate if water leaks from the appliance.
8. When this appliance has reached the end of its serviceable life, it should be disposed of in a safe manner, in accordance with current local authority recycling, or waste disposal policy.
5
Pack Contents Checklist
Mira Azora
Tick the appropriate boxes to familiarise yourself with the part names and to conrm that the parts are included.
1 x Olive
1 x Compression Nut
3 x Fixing Screws
1 x Mira Azora
Documentation
1 x Installation and User Guide
1 x Installation Template
1 x Installer Checklist
1 x Guarantee Card
3 x Wall Plugs
6
Mira Energise Electric Shower Fittings
Tick the appropriate boxes to familiarise yourself with the part names and to con­rm that the parts are included.
2 x Slide Bar Ends
2 x Wall Plugs
2 x End Supports
1 x Handset
1 x Slide Bar
2 x Hose Seals
1 x Flexible Hose
1 x Clamp Bracket
Assembly
1 x Soap Dish
1 x Hose Retaining
Ring
2 x Fixing Screws
2 x End Plugs
Documentation
1 x Installation and User Guide
7
Specications
1. Plumbing
Minimum maintained inlet pressure 70 kPa (0.7 bar). 100 kPa (1.0 bar) recommended for satisfactory operation.
Maximum static inlet pressure 1000 kPa (10 bar).
Minimum static pressure 20 kPa (0.2 bar) to keep the inlet valve closed.
2. Electrical
The Mira Azora 9.8 kW requires a 45 Amp fuse.
The terminal block will accept cable up to 16 mm2 .
3. Standards and Approvals
The Mira Azora complies with all relevant directives for CE marking.
Installation Requirements
1. Plumbing
The appliance is designed to operate with a minimum maintained inlet
pressure of 0.7 bar up to a maximum static inlet pressure of 10 bar.
When installed in very hard water areas (above 200 ppm temporary hardness) your installer may advise the installation of a water treatment device, to reduce the effects of limescale formation. Your local water company will be able to advise the hardness of water in your area.
It is recommended that a non-restrictive (free owing) isolating valve
is tted in the cold water supply pipe to allow the complete maintenance
of the appliance. Do not use a valve with a loose washer plate (jumper) as this can lead to a build up of static pressures.
The appliance is suitable for installation within the shower area. It is tted
with a pressure relief device and must be positioned over a water catchment area with the controls at a convenient height for all users.
The appliance must be tted on to a nished at and even wall surface
(this wall surface should be tiled or waterproofed). Do not t the appliance to the wall and tile up to the case. For safety requirements, an air gap must be left behind the appliance.
8
Avoid layouts where the shower hose will be sharply kinked. This may reduce the life of the hose.
A Hose Retaining Ring is supplied to prevent the handset from dropping below the spill-over level of the bath or shower tray, which could lead to contamination from back-siphoning. The supplied Hose Retaining Ring should meet the majority of user requirements for
shower installations with exible outlet ttings. However, there will be
occasions when it will not provide a suitable solution. In these instances an outlet double checkvalve, e.g. a Mira DCV-H, must be tted. This will increase the required supply pressure typically by 0.1 bar (see section “Accessories”).
Supply pipework must be ushed to clear debris before connecting to the appliance.
To avoid damage to the case when soldered ttings are used, pre-solder the pipework and ttings before connecting them to the inlet connector assembly. Refrain from applying excessive force when making any
connections. Always provide mechanical support when making the plumbing connections.
The appliance is tted with a brass inlet compression assembly for
connecting to a 15mm supply pipe from the top, bottom or back. Double
checkvalves, if tted in the inlet supply to the appliance, can cause a pressure build-up, which could exceed the maximum static inlet pressure
and damage the appliance.
Minimum
200mm from
ceiling
Convenient height for all the family
Fixed to nished
wall surface
Isolating Valve
Avoid Sharp Kinks
Hose Retaining Ring
25 mm Min
Bath
Shower Tray
9
2. Electrical
In a domestic installation, the rating of the electricity supplier’s fuse and the consumer unit must be adequate for the additional demand. All Mira electric showers are high power units, it is essential to contact your electricity supplier to ensure that the supply is adequate for the product. Voltage drop due to local heavy demand will reduce the shower’s performance.
The appliance must be earthed by connecting the supply-cable earth conductor to the earth terminal. Supplementary bonding: Within the bathroom or shower room, all
accessible conductive parts of electrical equipment and extraneous
conductive parts (metal parts) that are likely to introduce earth potential, must be electrically bonded to earth using a minimum cable size of
4.0mm2 if the cable is not mechanically protected, (2.5 mm2 if
mechanically protected).
The minimum cable size (cross-sectional area) required should be in accordance with BS 7671.
As a guide only, and in accordance with BS 7671 we recommend close circuit protection: i.e. 9.8 kW = 45 Amp
It is strongly recommended that a 30 mA Residual Current Device (RCD) is included in the electrical circuit. This may be part of the consumer unit or a separate unit.
A separate, permanently connected supply must be taken from the consumer unit to the appliance through a double-pole switch, which has at least 3 mm of contact separation. The switch can be a ceiling mounted pullcord type within the shower room, or a wall mounted switch in an adjacent room.
DO NOT twist the individual cable cores of either the live or neutral conductors, as this will prevent them from entering the terminal block.
DO NOT exert strain on the terminal block. Ensure that the electrical connections are tightly screwed down.
DO NOT turn-on the electrical supply until the plumbing has been
completed.
10
Loading...
+ 22 hidden pages