Kohler K162323BN Installation Manual

Installation Guide
Widespread Lavatory Faucet
M product numbers are for Mexico (i.e. K-12345M) Los números de productos seguidos de M corresponden a México (Ej. K-12345M) Français, page “Français-1” Español, página “Español-1”
1054191-2-A
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before you start installation. If you encounter any installation or performance problems, please don’t hesitate to contact us. Our phone numbers and website are listed on the back cover. Thanks again for choosing Kohler Company.
Tools and Materials
Adjustable Wrench
Plumbers Putty
Sealant Tape
Pipe Sealant
Before You Begin
Observe all local plumbing and building codes.
Shut off the main water supply.
Carefully inspect the waste and supply tubing for any sign of damage.
Replace waste or supply tubing if necessary.
For new installations, install the faucet before installing the lavatory.
Kohler Co. reserves the right to make revisions in the design of faucets without notice, as specified in the Price Book.
1054191-2-A 2 Kohler Co.
Apply
Lift Rod
plumbers putty.
Spout
Metal Washer
Supply Tee
Guide Tube Nut
Nut
Washer
Rubber Gasket
O-Ring
1. Install the Spout
Apply a bead of plumbers putty or other sealant to the underside of the spout base according to the putty manufacturer’s instructions.
Locate the center hole and insert the spout.
Install the metal washer and nut.
Securely tighten the nut with a wrench. Do not overtighten.
Remove any excess putty or sealant.
Remove and retain the guide tube nut and O-ring from the supply tee.
Insert the washer and rubber gasket into the supply tee.
Thread the supply tee onto the spout until hand-tight.
Hold the spout in place and tighten the supply tee with a wrench until it is aligned side to side. Do not overtighten.
Slip the O-ring over the lift rod and thread the guide tube nut onto the supply tee.
Tighten the guide tube nut on the supply tee with a wrench. Do not overtighten.
Kohler Co. 3 1054191-2-A
Washer
Handle Body Outlet
O-Ring
Nut
Copper Tube
Flexible Hose
Flexible
Flexible
Flexible
Flexible
Flexible Hose
Hose
Hose
Hose
Hose
Supply
Supply
Supply
Supply
Supply Tee
Tee
Tee
Tee
Tee
2. Install the Valve Bodies
NOTE: The valve body marked COLD(with blue lettered tape attached to the tube) should be installed to the right of the faucet.
Apply a bead of plumbers putty or other sealant to the underside of the base of the handle body according to the manufacturer’s instructions.
From the top of the lavatory, insert the cold and hot valve bodies into the mounting holes. Make sure that the body marked COLDis installed in the right-hand hole as viewed from the front of the lavatory.
Install a washer and a nut onto the underside of each valve body.
Rotate each valve body until the copper tubing faces toward the outside of the lavatory.
While holding the valve bodies in place, securely tighten the nuts with a wrench. Do not overtighten.
Remove any excess putty or sealant.
Install the O-ring on the hose and thread each hose into the handle body outlet.
Tighten the hose connections on the handle body with a wrench. Do not overtighten.
Loop the hoses as shown and connect them to the supply tee inlets. Do not use thread sealant. Do not overtighten.
1054191-2-A 4 Kohler Co.
Fixture
Flange
Apply plumbers putty.
Tapered Gasket Flat Washer
Nut Drain Body
3. Install the Drain
Remove the protective cover from the flange.
Apply a ring of plumbers putty or other sealant to the underside of the flange according to the putty manufacturer’s instructions.
Assemble the nut, flat washer, and tapered gasket (tapered side up) fully onto the body.
From the underside of the fixture, insert the drain body up into the drain hole.
From the top of the fixture, securely hand tighten the flange onto the drain body.
Make sure the drain body seal hole is facing the back of the fixture, and securely tighten the nut.
Remove any excess putty or sealant.
Kohler Co. 5 1054191-2-A
Stopper
Stopper Rod
Stopper Nut
Lift Rod
Thumb Screw
Clip
Link
Body
Apply thread sealant.
Tailpiece
Flange
Seal
Rod
Rod Nut
4. Complete the Drain Installation
Press the seal into the seal hole on the body.
Insert the stopper into the flange.
For regular installations, insert the short end of the rod into the body seal hole and under the stopper rod. For vandal-resistant installations, fit the rod through the hole in the stopper rod. Hand tighten the rod nut.
Remove and adjust the stopper as needed so it lifts about 3/8(1 cm) when opened. To adjust, rotate the threaded stopper rod in or out as needed. Retighten the stopper nut.
Apply thread sealant tape to the tailpiece threads, then thread the tailpiece to the body. Tighten the tailpiece securely.
Slide one end of the clip onto the rod. Slide the link onto the lift rod with the thumbscrew facing the back of the fixture.
Squeeze the other end of the clip, aligning the hole with the rod. Move the link to the proper position by squeezing the clip and sliding it along the rod.
Insert the lift rod into the hole in the body and then into the hole in the link.
Tighten the thumbscrew onto the link so the lift rod knob extends 1/2(1.3 cm) above the lift rod hole.
1054191-2-A 6 Kohler Co.
Valve Inlet
Supply Tube
Shut-off Valve
5. Connect the Supplies
Install the lavatory using the lavatory manufacturer’s instructions.
Connect the supply tubes to the handle valve inlets, and to the supply stops. Left is hot and right is cold.
Tighten all connections.
Kohler Co. 7 1054191-2-A
Spout
Aerator
6. Installation Checkout
Connect the tailpiece and P-trap (as needed).
Ensure that all connections are tight.
Remove the aerator by turning it counterclockwise.
Open the drain.
Turn on the main water supply and check for leaks. Adjust as needed.
Open both hot and cold valves and run water through the spout for about a minute to remove debris. Check for leaks. Turn the faucet off.
Remove any debris from the aerator and reinstall.
1054191-2-A 8 Kohler Co.
Guide d’installation
Robinet de lavabo à large entraxe
Outils et matériels
Clé à molette Mastic de
plomberie
Ruban d'étanchéité
Joint d'étanchéité
Merci d’avoir choisi la compagnie Kohler
Nous apprécions votre engagement envers la qualité Kohler. Veuillez prendre s’il vous plaît quelques minutes pour lire ce manuel avant de commencer l’installation. Ne pas hésiter à nous contacter en cas de problème d’installation ou de fonctionnement. Nos numéros de téléphone et notre adresse du site internet sont au verso. Merci encore d’avoir choisi la compagnie Kohler.
Avant de commencer
Respecter tous les codes de plomberie et de bâtiment locaux.
Couper l’alimentation d’eau principale.
Vérifier avec soin si les tubes d’évacuation ou d’alimentation d’eau sont endommagés.
Replacer les tubes d’alimentation ou d’évacuation si nécessaire.
Pour les nouvelles installations, installer le robinet avant d’installer le lavabo.
Kohler Co. se réserve le droit d’apporter toutes modifications au design des robinets et ceci sans préavis, comme spécifié dans le catalogue des prix.
Kohler Co. Français-1 1054191-2-A
Loading...
+ 19 hidden pages