Keysight Add Source and
Receiver Attenuators Upgrade
Kit
To Upgrade PNA N5224A or N5225A Option 201 to
Option 217
Upgrade Kit Order Numbers: N5224AU-217 or
N5225AU-217
Keysight Kit Number: N5225-60103
Installation Note
Page 2
Page 3
WARRANTY STATEMENT
THE MATERIAL CONTAINED IN THIS DOCUMENT IS PROVIDED “AS IS,” AND IS SUBJECT TO BEING
CHANGED, WITHOUT NOTICE, IN FUTURE EDITIONS. FURTHER, TO THE MAXIMUM EXTENT PERMITTED BY
APPLICABLE LAW, KEYSIGHT DISCLAIMS ALL WARRANTIES, EITHER EXPRESS OR IMPLIED WITH REGARD
TO THIS MANUAL AND ANY INFORMATION CONTAINED HEREIN, INCLUDING BUT NOT LIMITED TO THE
IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. KEYSIGHT
SHALL NOT BE LIABLE FOR ERRORS OR FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES IN CONNECTION
WITH THE FURNISHING, USE, OR PERFORMANCE OF THIS DOCUMENT OR ANY INFORMATION CONTAINED
HEREIN. SHOULD KEYSIGHT AND THE USER HAVE A SEPARATE WRITTEN AGREEMENT WITH WARRANTY
TERMS COVERING THE MATERIAL IN THIS DOCUMENT THAT CONFLICT WITH THESE TERMS, THE
WARRANTY TERMS IN THE SEPARATE AGREEMENT WILL CONTROL.
DFARS/Restricted Rights Notice
If software is for use in the performance of a U.S. Government prime contract or subcontract, Software is
delivered and licensed as “Commercial computer software” as defined in DFAR 252.227-7014 (June 1995), or
as a “commercial item” as defined in FAR 2.101(a) or as “Restricted computer software” as defined in FAR
52.227-19 (June 1987) or any equivalent agency regulation or contract clause. Use, duplication or disclosure of
Software is subject to Keysight Technologies’ standard commercial license terms, and non-DOD Departments
and Agencies of the U.S. Government will receive no greater than Restricted Rights as defined in FAR 52.22719(c)(1-2) (June 1987). U.S. Government users will receive no greater than Limited Rights as defined in FAR
52.227-14 (June 1987) or DFAR 252.227-7015 (b)(2) (November 1995), as applicable in any technical data.
Safety Notes
The following safety notes are used throughout this document. Familiarize yourself with each of these notes
and its meaning before performing any of the procedures in this document.
WARNINGWarning denotes a hazard. It calls attention to a procedure which, if not correctly performed
or adhered to, could result in injury or loss of life. Do not proceed beyond a warning note
until the indicated conditions are fully understood and met.
CAUTIONCaution denotes a hazard. It calls attention to a procedure that, if not correctly performed or
adhered to, could result in damage to or destruction of the instrument. Do not proceed beyond
a caution note until the indicated conditions are fully understood and met.
2 Installation Note N5225-90103
Page 4
Description of the Upgrade
This upgrade adds the following items to your N5224A Option 201 or N5225A Option 201 network analyzer:
•a 60-dB source attenuator in each source port channel
•a 35-dB receiver attenuator in each receiver channel
•front panel overlay replacement
•new cables
After installation of this upgrade, your analyzer will be an N5224A Option 217 or N5225A Option 217.
Getting Assistance from Keysight
By internet, phone, or fax, get assistance with all your test and measurement needs.
Contacting Keysight
Assistance with test and measurements needs and information on finding a local Keysight office are available
on the Web at:
http://www.keysight.com/find/assist
If you do not have access to the Internet, please contact your Keysight field engineer.
NOTE In any correspondence or telephone conversation, refer to the Keysight product by its model
number and full serial number. With this information, the Keysight representative can
determine whether your product is still within its warranty period.
Installation Note N5225-90103 3
Page 5
Getting Prepared
CAUTIONThe PNA contains extremely sensitive components that can be ruined if mishandled. Follow
instructions carefully when making cable connections, especially wire harness connections.
The person performing the work accepts responsibility for the full cost of the repair or
replacement of damaged components.
To successfully install this upgrade kit, you will need the following:
•A license key - refer to “License Key Redemption” below.
•A PDF copy or a paper copy of the PNA Service Guide - refer to “Downloading the Online PNA Service
Guide” below.
•An ESD-safe work area - refer to “Protecting Your Workspace from Electrostatic Discharge” below.
•Correct tools - refer to “Tools Required for the Installation” on page 6.
•Enough time - refer to “About Installing the Upgrade” on page 6.
•Test equipment for the post-upgrade adjustments and full instrument calibration. To view the equipment
list, click the Chapter 3 bookmark “Tests and Adjustments” in the PDF Service Guide
License Key Redemption
1
.
NOTEThe enclosed Option Entitlement Certificate is a receipt, verifying that you have purchased a
licensed option for the PNA of your choice. You must now use a Keysight Web page to request
a license key for the instrument that will receive the option.
To enable the option product, you must request a license key from: http://www.keysight.com/find/
softwarelicense. To complete the request, you will need to gather the following information:
•From the certificate
❏ Order number
❏ Certificate number
•From your instrument
❏ Model number
❏ Serial number
❏ Host ID
The instrument information is available on the network analyzer – on the analyzer’s Help menu, click About
Network Analyzer.
If you provide an email address, Keysight will promptly email your license key. Otherwise, you will your receive
your license key via postal mail.
1. See “Downloading the Online PNA Service Guide” on page 5.
4 Installation Note N5225-90103
Page 6
Downloading the Online PNA Service Guide
To view the online Service Guide for your PNA model number, use the following steps:
1. Go towww.keysight.com.
2. In the Search box, enter the model number of the analyzer (Ex: N5242A) and click Search.
3. Click Technical Support > Manuals.
4. Click Service Manual.
5. Click the service guide title to download the PDF file.
6. When the PDF of the Service Guide is displayed, scroll through the Contents section bookmarks to locate
the information needed.
Protecting Your Workspace from Electrostatic Discharge
For information, click on the Chapter 1 bookmark, “Electrostatic Discharge Protection” in the PDF Service
1
.
Guide
ESD Equipment Required for the Installation
DescriptionKeysight Part Number
ESD grounding wrist strap9300-1367
5-ft grounding cord for wrist strap9300-0980
2 x 4 ft conductive table mat and 15-ft grounding wire9300-0797
ESD heel strap (for use with conductive floors)9300-1308
1. See “Downloading the Online PNA Service Guide” on page 5.
Installation Note N5225-90103 5
Page 7
Tools Required for the Installation
DescriptionQtyPart Number
T-10 TORX driver - set to 9 in-lbs (1.02 N.m)1N/A
T-20 TORX driver - set to 21 in-lbs (2.38 N.m)1N/A
5/16-in (8 mm) nutsetter or open end torque wrench - set to 10 in-lbs (1.13 N.m)1N/A
CAUTIONUse a 5/16-in torque wrench set to 10 in-lbs on all cable connections.
Estimated full instrument calibration time . . . . . . . . . . . . . 4.5 hours
6 Installation Note N5225-90103
Page 8
Items Included in the Upgrade Kit
1
Check the contents of your kit against the following list. If any part is missing or damaged, contact Keysight
Technologies. Refer to “Getting Assistance from Keysight” on page 3.
Table 1Contents of Upgrade Kit N5225-60103
Ref
Desig.
--Installation note (this document)1N5225-90103
A38,
A41
A46,
A49
W12A29 port 1 receiver coupler to W111N5245-20050
W18A32 port 2 receiver coupler to W171N5245-20049
W21A29 port 1 receiver coupler to A37 reference mixer switch1N5245-20118
0–60 dB source step attenuator233325-60016
0-35 dB receiver step attenuator233325-60017
--Attenuator bracket
--Attenuator bracket
--Cable clamp81400-1334
--Cable tie51400-0249
--Front panel overlay1N5225-80002
Machine screw, M3 x 8, pan head (to attach brackets to attenuators; to attach
-receiver attenuators to deck)
--Machine screw, M3 x 6, pan head (to attach source attenuators to deck)40515-0430
(For source attenuators.)2N5245-00015
(For receiver attenuators.)2N5225-00001
DescriptionQty Part Number
170515-0372
W33RF cable, A32 port 2 receiver coupler to front-panel REF 2 SOURCE OUT1N5245-20010
W47REF 2 RCVR R2 IN to A27 mixer brick (R2)1N5245-20119
W81RF cable, A29 test port 1 receiver coupler to A38 test port 1 source attenuator1N5245-20029
W82RF cable, A38 test port 1 source attenuator to front-panel Port 1 SOURCE OUT1N5245-20077
W93RF cable, A32 test port 2 receiver coupler to A41 test port 2 source attenuator1N5245-20029
W94RF cable, A41 test port 2 source attenuator to front-panel Port 2 SOURCE OUT1N5245-20031
W97RF cable, front-panel Port 1 RCVR A IN to A46 port 1 receiver attenuator1N5245-20054
W98RF cable, A46 port 1 receiver attenuator to A27 mixer brick (A)1N5245-20056
W103RF cable, Port 2 RCVR B IN to A49 port 2 receiver attenuator1N5245-20055
W104RF cable, A49 port 2 receiver attenuator to A27 mixer brick (B)1N5245-20057
--Ribbon cable, A23 test set motherboard J205 to A46 port 1 receiver attenuator
--Ribbon cable, A23 test set motherboard J208 to A49 port 2 receiver attenuator
1. In addition to the upgrade kit, the shipment includes an Option Entitlement Certificate. Refer to “License Key Redemption”
on page 4 for important information about this certificate.
N5245-60026
2
Was 8121-0982
Installation Note N5225-90103 7
Page 9
Table 1Contents of Upgrade Kit N5225-60103
Ref
Desig.
--Ribbon cable, A23 test set motherboard J549 to A38 test port 1 source attenuator
--Ribbon cable, A23 test set motherboard J546 to A41 test port 2 source attenuator
NOTEExtra quantities of items such as protective plastic caps, screws, cable ties, and cable clamps
DescriptionQty Part Number
2N5245-60006
may be included in this upgrade kit. It is normal for some of these items to remain unused after
the upgrade is completed.
8 Installation Note N5225-90103
Page 10
Installation Procedure for the Upgrade
The network analyzer must be in proper working condition prior to installing this option. Any necessary repairs
must be made before proceeding with this installation.
WARNINGThis installation requires the removal of the analyzer’s protective outer covers. The analyzer
must be powered down and disconnected from the mains supply before performing this
procedure.
Overview of the Installation Procedure
Step 1. Obtain a Keyword and Verify the Information.
Step 2. Remove the Outer Cover.
Step 3. Remove Some Bottom-Side (Test Set) Cables.
Step 4. Assemble the A46 and A49 Receiver Attenuator Assemblies.
Step 5. Install the A46 and A49 Receiver Attenuator Assemblies.
Step 6. Assemble the A38 and A41 Source Attenuator Assemblies.
Step 7. Install the A38 and A41 Source Attenuator Assemblies.
Step 8. Install Some Bottom-Side (Test Set) Cables.
Step 9. Remove the Old Lower Front Panel Overlay.
Step 10. Reinstall Front Panel Assembly.
Step 11. Install the New Lower Front Panel Overlay.
Step 12. Reinstall Front Panel Jumpers.
Step 13. Position the Cables and Wires to Prevent Pinching.
Step 14. Reinstall the Outer Cover.
Step 15. Enable Option 217.
Step 16. Perform Post-Upgrade Adjustments and Calibration.
Step 17. Prepare the PNA for the User.
Installation Note N5225-90103 9
Page 11
Step 1. Obtain a Keyword and Verify the Information
Follow the instructions on the Option Entitlement Certificate supplied to obtain a license key for installation of
this upgrade. Refer to “License Key Redemption” on page 4.
Verify that the model number, serial number, and option number information on the license key match those of
the instrument on which this upgrade will be installed.
If the model number, serial number, or option number do not match those on your license key, you will not be
able to install the option. If this is the case, contact Keysight for assistance before beginning the installation of
this upgrade. Refer to “Contacting Keysight” on page 3.
Once the license key has been received and the information verified, you can proceed with the installation at
step 2.
Step 2. Remove the Outer Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the PDF Service Guide1.
1. See “Downloading the Online PNA Service Guide” on page 5.
10 Installation Note N5225-90103
Page 12
Step 3. Remove Some Bottom-Side (Test Set) Cables
CAUTIONBe careful not to damage the center pins of the semirigid cables. Some flexing of the cables
may be necessary but do not over-bend them.
1. Place the analyzer bottom-side up on a flat surface.
2. Remove the following cables. To see an image showing the location of these cables, click the Chapter 6
1
bookmark “Bottom RF Cables, Standard 2-Port Configuration, Option 201” in the PDF Service Guide
These cables may be discarded - they will not be reinstalled.
•W12 (N5245-20109) A29 port 1 receiver coupler to W11
•W18 (N5245-20111) A32 port 2 receiver coupler to W17
•W19 (N5245-20039) A29 test port 1 receiver coupler to front-panel Port 1 SOURCE OUT
•W21 (N5245-20120) A29 port 1 receiver coupler to A37 reference mixer switch
•W31 (N5245-20040) A32 test port 2 receiver coupler to front-panel Port 2 SOURCE OUT
•W35 (N5245-20121) A32 port 2 receiver coupler to front-panel REF 2 SOURCE OUT
•W37 (N5245-20041) Front-panel Port 1 RCVR A IN to A27 mixer brick (A)
•W40 (N5245-20042) Port 2 RCVR B IN to A27 mixer brick (B)
.
•W46 (N5245-20011) Front-panel REF 2 RCVR R2 IN to A27 mixer brick (R2)
These cables must be saved - they will be reinstalled.
•W41 (N5245-20006) A37 reference mixer switch to
front-panel REF 1 SOURCE OUT
•W42 (N5245-20007) REF 1 RCVR R1 IN to A37 reference mixer switch
•W36 (N5245-20155) Front panel jumpers (quantity = 6)
NOTE: Remove and save the cable guards for the front panel jumpers.
1. See “Downloading the Online PNA Service Guide” on page 5.
Installation Note N5225-90103 11
Page 13
Step 4. Assemble the A46 and A49 Receiver Attenuator Assemblies
Refer to Figure 1 for this step of the procedure. New parts are listed in Table 1 on page 7. Use a T-10 TORX
driver to tighten all screws.
Figure 1Port 1 and Port 2 Receiver Attenuator and Bracket Assembly
12 Installation Note N5225-90103
Page 14
Step 5. Install the A46 and A49 Receiver Attenuator Assemblies
Refer to Figure 2 for this step of the procedure. New parts are listed in Table 1 on page 7. Use a T-10 TORX
driver to tighten all screws.
Figure 2Port 1 and Port 2 Receiver Attenuator Assemblies Installation
Installation Note N5225-90103 13
Page 15
Step 6. Assemble the A38 and A41 Source Attenuator Assemblies
Refer to Figure 3 for this step of the procedure. New parts are listed in Table 1 on page 7. Use a T-10 TORX
driver to tighten all screws.
Figure 3Source Attenuator and Brackets Assembly
14 Installation Note N5225-90103
Page 16
Step 7. Install the A38 and A41 Source Attenuator Assemblies
Refer to Figure 4 for this step of the procedure. New parts are listed in Table 1 on page 7. Use a T-10 TORX
driver to tighten all screws.
Figure 4Source Attenuator Assemblies Installation
Installation Note N5225-90103 15
Page 17
Step 8. Install Some Bottom-Side (Test Set) Cables
CAUTIONFollow instructions carefully when making cable connections, especially wire harness
connections. Incorrect connections can destroy components, resulting in additional customer
costs.
Install the Semirigid Cables
To see an image showing the location of these cables, click the Chapter 6 bookmarks “Bottom RF Cables, 2-
port Configuration, Option 217” in the PDF Service Guide
Install the following new cables in the order listed.
•W103 (N5245-20055) Port 2 RCVR B IN to A49 port 2 receiver attenuator
1
. New parts are listed in Table 1 on page 7.
•W94 (N5245-20031)
A41 port 2 source attenuator to front-panel Port 2 SOURCE OUT
•W33 (N5245-20010) A32 port 2 receiver coupler to front-panel REF 2 SOURCE OUT
* As shown in Figure 5 on page 17, install four cable clamps (part number 1400-1334) to secure W33 (part
number N5245-20010).
1. See “Downloading the Online PNA Service Guide” on page 5.
16 Installation Note N5225-90103
Page 18
Figure 5Location of Cable Clamps to Secure W33
•W104 (N5245-20057) A49 port 2 receiver attenuator to A27 mixer brick (B)
•W47 (N5245-20119) REF 2 RCVR R2 IN to A27 mixer brick (R2)
•W47 (N5245-20119) REF 2 RCVR R2 IN to A27 mixer brick (R2)
•W18 (N5245-20049) A32 port 2 receiver coupler to W17
•W12 (N5245-20050) A29 port 1 receiver coupler to W11
•W82 (N5245-20077)
•W42 (reuse) (N5245-20007) REF 1 RCVR R1 IN to A37 reference mixer switch
•W41 (reuse) (N5245-20006) A37 reference mixer switch to
•W21 (N5245-20118) A29 port 1 receiver coupler to A37 reference mixer switch
Installation Note N5225-90103 17
A38 port 1 source attenuator to front-panel Port 1 SOURCE OUT
front-panel REF 1 SOURCE OUT
Page 19
If the two screws that attach the reference mixer switch to the test set deck were loosened, torque these
screws now to 9 in-lbs.
* As shown in Figure 6, install a cable tie (part number 1400-0249) to secure W21 (part number N5245-
20118).
Figure 6Location of Cable Tie to Secure W21
•W98 (N5245-20056) A46 port 1 receiver attenuator to A27 mixer brick (A)
•W81 (N5245-20029) A29 port 1 receiver coupler to A38 port 1 source attenuator
•W93 (N5245-20029)A32 port 2 receiver coupler to A41 port 2 source attenuator
Install the Ribbon Cables
To see an image showing the location of these cables, click the Chapter 6 bookmarks “Bottom Ribbon Cables
1
and Wire Harnesses, 2-port, Option 217” in the PDF Service Guide
. New parts are listed in Table 1 on page 7.
Connect step attenuator ribbon cables as follows:
•(N5245-60006) A38 port 1 source step attenuator to A23 test set motherboard J549
•(N5245-60006) A41 port 2 source step attenuator to A23 test set motherboard J546
•(N5245-60026) A46 port 1 receiver step attenuator to A23 test set motherboard J205
•(N5245-60026) A49 port 2 receiver step attenuator to A23 test set motherboard J208.
1. See “Downloading the Online PNA Service Guide” on page 5.
18 Installation Note N5225-90103
Page 20
Step 9. Remove the Old Lower Front Panel Overlay
Refer to Figure 7 for this step of the procedure. Although this figure shows a 4-port PNA, the concept is the
same for a 2-port PNA. New parts are listed in Table 1 on page 7.
1. From the back side of the front panel, use a blunt object in the cutouts in the lower front dress panel to
push on the old overlay (item
2. From the front side of the front panel, pull off the overlay completely and discard it.
3. Remove any adhesive remaining on the front panel.
Figure 7Lower Front Panel Overlay Replacement
) and separate it from the front dress panel.
①
Installation Note N5225-90103 19
Page 21
Step 10. Reinstall Front Panel Assembly
For instructions on reinstalling the front panel assembly, click the Chapter 7 bookmark “Removing and
1
Replacing the Front Panel Assembly” in the PDF Service Guide
.
Step 11. Install the New Lower Front Panel Overlay
Refer to Figure 7 on page 19 for this step of the procedure. New parts are listed in Table 1 on page 7.
1. Remove the protective backing from the new front panel overlay, N5225-80002 (item
2. Starting from either side, loosely place the overlay in the recess on the lower front panel, ensuring that it
fits tightly against the edges of the recess.
3. Once the overlay is in place, press it firmly onto the frame to secure it.
➁).
Step 12. Reinstall Front Panel Jumpers
As shown in Figure 8, reinstall the six front panel jumper cables (part number N5245-20155).
Figure 8Front Panel Jumper Cables Installation
1. See “Downloading the Online PNA Service Guide” on page 5.
20 Installation Note N5225-90103
Page 22
Step 13. Position the Cables and Wires to Prevent Pinching
System
Service
Option Enable
On the top side of the PNA, carefully position the grey flex cables so they can’t be pinched between the covers
and the rails.
On the bottom side of the PNA, carefully fold or push down the ribbon cables and wires so they can’t be
pinched between the hardware and the outer cover. Ribbon cables and wires must never be positioned on top
of hardware.
Step 14. Reinstall the Outer Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the PDF Service Guide1.
Step 15. Enable Option 217
Procedure Requirements
•The analyzer must be powered up and operating to perform this procedure.
•The Network Analyzer program must be running.
•A keyboard must be connected to the network analyzer.
Option Enable Procedure
1. To start the option enable utility, press UTILITY , then , then . An
option enable dialog box will appear.
2. Click the arrow in the Select Desired Option box. A list of available options will appear.
3. In the Select Desired Option list, click 217 - Configurable TS + Attens.
4. Using the keyboard, enter the license key in the box provided. The license key is printed on the the license
message you received from Keysight. Enter this key exactly as it is printed on the message.
5. Click Enable.
6. Click Yes in answer to the displayed question in the Restart Analyzer? box.
7. When the installation is complete, click Exit.
Option Verification Procedure
Once the analyzer has restarted and the Network Analyzer program is again running:
1. On the analyzer’s Help menu, click About Network Analyzer.
2. Verify that “217” is listed after “Options:” in the display. Click OK.
NOTEIf Option 217 has not been enabled, perform the ”Option Enable Procedure” again. If the
option is still not enabled, contact Keysight Technologies. Refer to “Getting Assistance
from Keysight” on page 3.
Installation Note N5225-90103 21
Page 23
Step 16. Perform Post-Upgrade Adjustments and Calibration
Adjustments
The following adjustments must be made due to the hardware changes of the analyzer.
•source adjustment
•receiver adjustment
These adjustments are described in the PNA Service Guide and in the PNA on-line HELP. A list of equipment
required to perform these adjustments is also found in the service guide.
To view this service guide information, click the Chapter 3 bookmark “Tests and Adjustments” in the PDF
Service Guide
After the specified adjustments have been performed, the analyzer should operate and phase lock over its
entire frequency range.
Operator’s Check
Perform the Operator’s Check to check the basic functionality of the analyzer. For instructions, click the
Chapter 3 bookmark “Tests and Adjustments” in the PDF Service Guide
If you experience difficulty with the basic functioning of the analyzer, contact Keysight. Refer to “Contacting
Keysight” on page 3.
1
.
1
.
Calibration
Although the analyzer functions, its performance relative to its specifications has not been verified. It is
recommended that a full instrument calibration be performed using the analyzer’s internal performance test
software. To view information on the performance test software, click the Chapter 3 bookmark “Tests and
1
Adjustments” in the PDF Service Guide
.
Step 17. Prepare the PNA for the User
1. If necessary, reinstall front jumper cables.
2. Install the cable guards, pushing them over the front jumper cables until the cushioning material touches
the front panel of the PNA.
3. Install the dust caps on the test ports.
4. Clean the analyzer, as needed, using a damp cloth.
1. See “Downloading the Online PNA Service Guide” on page 5.
22 Installation Note N5225-90103
Page 24
This information is subject to change without notice.