KERN & SOHN NFB 1.5T0.5LM User Manual

KERN & Sohn GmbH
Ziegelei 1 D-72336 Balingen E-Mail: info@kern-sohn.com
Installation instructions Drive-through scale
KERN KFD V20
Version 1.2
10/2013 GB
KFD V20-IA-e-1312
GB
KERN KFD V20
Version 1.2 10/2013
Installation instructions Drive-through scale
Contents
1 General ........................................................................................................... 3
2 Technical data ................................................................................................ 3
2.1 Dimensions ................................................................................................................................. 4
3 Appliance overview ....................................................................................... 5
4 Basic Information (General) .......................................................................... 6
4.1 Documentation ........................................................................................................................... 6
4.2 Proper use .................................................................................................................................. 6
4.3 Improper Use .............................................................................................................................. 6
4.4 Warranty ..................................................................................................................................... 6
4.5 Monitoring of Test Resources .................................................................................................... 7
5 Basic Safety Precautions .............................................................................. 7
5.1 Pay attention to the instructions in the Operation Manual.......................................................... 7
5.2 Personnel training ....................................................................................................................... 7
6 Transport and storage ................................................................................... 7
6.1 Testing upon acceptance ........................................................................................................... 7
6.2 Packaging / return transport ....................................................................................................... 7
7 Unpacking, Setup and Commissioning ....................................................... 8
7.1 Installation Site, Location of Use ................................................................................................ 8
7.2 Unpacking, Scope of delivery ..................................................................................................... 9
7.3 Assembly, levelling ..................................................................................................................... 9
7.4 Connecting a display unit ......................................................................................................... 10
8 Operation ...................................................................................................... 10
8.1 Operation limits ......................................................................................................................... 11
8.2 Load/unload weighing bridge ................................................................................................... 11
9 Service, maintenance, disposal .................................................................. 12
9.1 Daily check ............................................................................................................................... 12
9.2 Cleaning ................................................................................................................................... 12
9.3 Service, maintenance ............................................................................................................... 12
9.4 Disposal .................................................................................................................................... 12
9.5 Instant help ............................................................................................................................... 13
10 Service documentation ............................................................................... 14
10.1 Overview, setting regulation, tolerances .................................................................................. 14
10.2 Check and adjustment of the corner load................................................................................. 16
11 Preload, Deadload and Overload settings ................................................. 18
KFD V20-IA-e-1312 2
1 General
Model
Weighing range Max
Read­ability d
Verificati on value e
Minimum load Min
Preload additive
Cable length approx.
Net weight approx.
kg g g
kg
kg m kg
KFD 600V20M
600
200
200
4
120 4 85
KFD 600V20LM
600
200
200
4
120 4 85
KFD 1500V20M
1500
500
500
10
300
3
140
KFD 1500V20LM
1500
500
500
10
300
3
140
These installation instruction contain all data necessary for placing and
commissioning the following weighing bridges:
KERN KFD 600V20M KERN KFD 600V20LM KERN KFD 1500V20M KERN KFD 1500V20LM
2 Technical data
3 KFD V20-IA-e-1312
2.1 Dimensions
KFD V20-IA-e-1312 4
3 Appliance overview
Access ramp
Weighing bridge
Cover of weighing cell feet
Connection cable
5 KFD V20-IA-e-1312
4 Basic Information (General)
4.1 Documentation
These installation instructions contain all data necessary for placing and commissioning the weighing bridges KERN KFD V20. In combination with a display unit, described below as weighing system, for operation configuration, please refer to the operating instructions of the display unit.
4.2 Proper use
The balance you purchased is intended to determine the weighing value of material to be weighed. It is intended to be used as a “non-automatic balance”, i.e. the material to be weighed is manually and carefully placed in the centre of the weighing plate. As soon as a stable weighing value is reached the weighing value can be read.
4.3 Improper Use
Do not leave permanent load on the weighing bridge. This may damage the measuring system.
Impacts and overloading exceeding the stated maximum load (max) of the weighing system, minus a possibly existing tare load, must be strictly avoided. The weighing system could be damaged. Never operate in an explosive environment. The serial version is not explosion protected. Changes to the weighing system's design are not permitted. This may lead to incorrect weighing results, safety-related faults and destruction of the balance. The weighing system unit may only be operated in accordance with the described default settings. Other areas of use must be released by KERN in writing.
4.4 Warranty
Warranty claims shall be voided in case
Our conditions in the operation manual are ignored The appliance is used outside the described uses Structural changes of the device Mechanical damage and damage caused by media, liquids Natural wear and tear The appliance is improperly set up or incorrectly electrically connected Overload of the measuring system
KFD V20-IA-e-1312 6
Loading...
+ 12 hidden pages