KAT KT2 EXPANSION PACK SETUP GUIDE
KT2EP5 Pad Pack Assembly Instructions
A. You can place the add-on 11" Kat pad
wherever you choose. The most common
setup is to position the pad as a snare drum
and move the existing pad to the 2nd floor
tom position as pictured. Clamp and L-Rod
placement is shown in illustration 1
B. After you place the Clamp and L-Rod onto
the horizontal tube place your Kat pads side
by side as shown in illustration 2
1
2
C. Use the existing snare cable to attach the
new 11" pad as your main snare drum then
plug in the provided trigger cable into the 9"
floor tom pad and plug the other end into the
tom 4 expansion input on the back of the KT2
module as shown in illustration 3
You can also add another cymbal trigger pad
to the KT2 module by purchasing the KT2EP2
KAT expansion pack
For more information about KAT Percussion visit www.katpercussion.com
Also join us on Facebook , Twitter, and YouTube
KMC Music, Inc., 55 Griffin Road S., Bloomfield, CT 06002-9005
3