JUKI AC-172N-1790 Setup Manual

ENGLISH
AC-172N-1790
SETUP MANUAL
1. VERIFICATION OF THE LOCATION OF PRESET BOARD AND SUB CLAMP CATCH PLATE
When you install the sewing machine in your plant, be sure to adjust the adjusters and check that the sewing
machine is properly installed. Check the alignment between the preset board and the sub clamp catch plate
following the steps of procedure described below.
1-1. Preparation of the power supply and the air supply
Refer to
Manual.
1-2. Preparation of the adjusters
Turn the adjusters (1 - 7) until they come in contact with the oor. After they have come in contact with the
oor, turn the adjusters clockwise by one revolution to lift them.
Adjuster
"!.3-2. Connecting the power supply"
1
Adjuster
2
Adjuster
3
Adjuster
4
and
"!.3-3. Installing the air hose"
Adjuster
5
Adjuster
in the Instruction
6
Adjuster
7
– 1 –
Loading...
+ 4 hidden pages