FNFB-40
(40 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM)
Installation Instructions
Call Jaypro Sports Equipment at 1-800-243-0533
during regular business hours for technical support.
www.jaypro.com
Rev: - Page 1 of 8
JAYPRO SPORTS
26 FT FIELD NET POLE (LOWER POLE HALF)
GROUND SLEEVE WELDMENT / END CAP
5/16 - #10 POLYESTER BLACK BRAIDED HOISTING ROPE x 85
FT 5 2
3/8"-16 x 7-3/8" LONG EYEBOLT STAINLESS STEEL
3/8"-16 HEX HD LOCK NUT, SS
5/16” x 3 1/8” SNAP HOOK, ZP
6" LONG GALV. STEEL CLEAT
1/4"-20 x 8 1/2" HEX HD SCREW
1/4"-20 NYLON LOCK NUT, SS
1/4-20 ACORN NUT SELF-LOCK
3/16” COATED AIRCRAFT CABLE 50’
3/16 OD 11/16 RIVET (ALUMINUM)
3-1/2" x #36 KNOTTED NYLON SQ. MESH, UV TREATED WITH
1/4" ROPE BORDER (BLACK) 40’ H x 40’ W
40 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM
IMPORTANT NOTICE:
1) BEFORE EACH USE CHECK EQUIPMENT FOR PROPER CONNECTING
HARDWARE AND STRUCTURAL INTEGRITY. REPLACE DAMAGED OR
MISSING HARDWARE IMMEDIATELY.
2) USE OF THIS EQUIPMENT OTHER THAN INTENDED, MAY BE HAZARDOUS.
3) ALTERATION OR MODIFICATION OF THIS EQUIPMENT MAY BE
HAZARDOUS AND RESULT IN INJURY. FOR REPAIR OR REPLACEMENT,
CONTACT YOUR DEALER OR JAYPRO SPORTS.
Rev: - Page 2 of 8
TOOLS REQUIRED:
Concrete, block or crushed stone.
Note these are suggested dimensions for average
soil conditions, consult local building codes.
(1) 3/8” Socket Wrench and Box Wrench (1) 7/16” Nut Driver
(1) 9/16” Socket Wrench and Box Wrench (1) Cable Cutters
(1) 3/16 in Rivet Gun
SPECIAL NOTES:
Spacing between poles is 40 ft.
Net should be removed and stored after the season is over.
Net should be removed prior to a major storm or high winds.
Layout & Excavation:
Clear working area from obstructions. Determine the proper location for the poles on the
field. (See Figure 2)
Install Sleeves:
Dig footing hole using the dimensions shown in Figure 1. Pack bottom of footing hole
with 12” of gravel or concrete block or pour 12-1/4 inch concrete pad and allow concrete
pad to cure for 48 hours. Install ground sleeve and pour concrete as shown in Figure 1.
While not required, Jaypro recommends using 6 lengths of 5/8 inch rebar, 54 inches long,
wired together into a 24 inch diameter basket and placed around the ground sleeve in the
footer hole. Wait 48 hours before inserting poles. The top of the ground sleeve should be
flush with the finished grade.
Rev: - Page 3 of 8
Figure 1
Figure 2