Jaypro Sports FNFB-40 User Manual

FNFB-40
(40 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM)
Installation Instructions
Call Jaypro Sports Equipment at 1-800-243-0533
during regular business hours for technical support.
Rev: - Page 1 of 8
JAYPRO SPORTS
P A R T S L I S T
ITEM #
QTY
DESCRIPTION
1
2
26 FT FIELD NET POLE (LOWER POLE HALF)
2
2
22 FT (UPPER POLE HALF)
3
2
GROUND SLEEVE WELDMENT / END CAP
4
2
5/16 - #10 POLYESTER BLACK BRAIDED HOISTING ROPE x 85 FT 5 2
6 5/8 ID BLACK CAP
6
4
3/8"-16 x 7-3/8" LONG EYEBOLT STAINLESS STEEL
7
4
3/8"-16 HEX HD LOCK NUT, SS
8
8
3/8" FLAT WASHER, SS
9
2
3/8’’ QUICK-LINK SS
10
2
2’’ SWIVEL PULLEY
11
16
5/16” x 3 1/8” SNAP HOOK, ZP
12
2
6" LONG GALV. STEEL CLEAT
13
4
1/4"-20 x 8 1/2" HEX HD SCREW
14
4
1/4" FLAT WASHER , SS
15
12
1/4" WASHER LOCK, SS
16
4
1/4"-20 NYLON LOCK NUT, SS
17
4
1/4-20 ACORN NUT SELF-LOCK
18
2
3/16” COATED AIRCRAFT CABLE 50’
19
8
1/4" WIRE ROPE CLIPS
20
4
1/4" WIRE ROPE THIMBLES
21
12
3/16 OD 11/16 RIVET (ALUMINUM)
22
100
8" BLACK CABLE TIE
23
1
3-1/2" x #36 KNOTTED NYLON SQ. MESH, UV TREATED WITH 1/4" ROPE BORDER (BLACK) 40 H x 40 W
40 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM
IMPORTANT NOTICE:
1) BEFORE EACH USE CHECK EQUIPMENT FOR PROPER CONNECTING
HARDWARE AND STRUCTURAL INTEGRITY. REPLACE DAMAGED OR MISSING HARDWARE IMMEDIATELY.
2) USE OF THIS EQUIPMENT OTHER THAN INTENDED, MAY BE HAZARDOUS.
3) ALTERATION OR MODIFICATION OF THIS EQUIPMENT MAY BE
HAZARDOUS AND RESULT IN INJURY. FOR REPAIR OR REPLACEMENT, CONTACT YOUR DEALER OR JAYPRO SPORTS.
Rev: - Page 2 of 8
TOOLS REQUIRED:
Concrete, block or crushed stone.
CONCRETE
Note these are suggested dimensions for average soil conditions, consult local building codes.
STEEL REBAR
40’ BETWEEN POLES
(1) 3/8” Socket Wrench and Box Wrench (1) 7/16” Nut Driver (1) 9/16” Socket Wrench and Box Wrench (1) Cable Cutters (1) 3/16 in Rivet Gun
SPECIAL NOTES:
Spacing between poles is 40 ft. Net should be removed and stored after the season is over. Net should be removed prior to a major storm or high winds.
Layout & Excavation: Clear working area from obstructions. Determine the proper location for the poles on the field. (See Figure 2)
Install Sleeves: Dig footing hole using the dimensions shown in Figure 1. Pack bottom of footing hole with 12of gravel or concrete block or pour 12-1/4 inch concrete pad and allow concrete pad to cure for 48 hours. Install ground sleeve and pour concrete as shown in Figure 1. While not required, Jaypro recommends using 6 lengths of 5/8 inch rebar, 54 inches long, wired together into a 24 inch diameter basket and placed around the ground sleeve in the footer hole. Wait 48 hours before inserting poles. The top of the ground sleeve should be flush with the finished grade.
Rev: - Page 3 of 8
Figure 1
Figure 2
Loading...
+ 5 hidden pages