Jaypro Sports FBGP-20 User Manual

JAYPRO SPORTS
HIGH SCHOOL OFFSET GOAL POST, FBGP-20
LIST OF MATERIALS
IMPORTANT FOR INSTALLATION DETAILS AND ASSEMBLY INSTRUCTIONS OF THE CONCRETE SUPPORT FOOTING, PLEASE REFER TO THE “FBGP-600 FOOTING INSTALLATION” DIAGRAM.
PIECE NO. PART NO. DESCRIPTION QTY. 1 FBGP-20US BOTTOM UPRIGHT 2 2 FBGP-20XS CROSSBAR 2 3 FBGP20TUS TOP UPRIGHT 4 4 HS5067 HEX HEAD SCREW 5/8”-11 x 2” 8 5 HW2043 FLATWASHER 5/8” 8 6 EC0010 2” DOME CAP 4 7 HS291 HEX HEAD SCREW 3/8”-16 x 2 ½” 8 8 HW2047 FLATWASHER 3/8” 8 9 HN265 LOCKNUT 3/8”-16 8 10 HN2112 HEX NUT 5/8”-11 8 11 HW340 LOCKWASHER 5/8” 8
CRITICAL REFERENCE DIMENSIONS
1) FROM GROUND LEVEL TO TOP OF CROSSBAR (2) IS 10’.
2) FROM END LINE TO CENTER LINE OF BOTTOM UPRIGHT (1) IS 55”.
3) DEPTH OF FOOTING HOLE IS 5’6”. CONCRETE TO BE 4000 PSI MIX.
4) TOP OF CONCRETE IS 8” BELOW GROUND SURFACE.
ASSEMBLY INSTRUCTIONS
1) ASSEMBLE ANCHOR ROD TO LEVELING PLATE BY INSTALLING 7/8”-9 HEX NUT ONTO ANCHOR ROD AND ENGAGING 7” OF THREAD. SLIP ANCHOR ROD THRU HOLES IN LEVELING PLATE ORIENTING THE ANCHOR ROD. INSTALL SECOND 7/8”-9 HEX NUT ONTO ANCHOR ROD AND TIGHTEN DOWN SO THAT THE LEVELING PLATE IS NOW HELD SECURELY BETWEEN THE TWO NUTS. PLACE INTO CONCRETE, LEVEL AND SQUARE.
2) THE LIFT RING WELDED TO THE BOTTOM UPRIGHT (1) SHOULD BE USED TO SUPPORT THE WEIGHT OF THE BOTTOM UPRIGHT ONLY. IT IS NOT INTENDED TO BE USED TO SUPPORT THE ENTIRE ASSEMBLED STRUCTURE.
3) SET CROSSBAR CAREFULLY (2) ONTO BOTTOM UPRIGHT (1) AND ASSEMBLE USING 5/8”-11 x 2” HEX HEAD SCREWS (4), 5/8” HEX NUTS (10), LOCK WASHERS (11), AND FLATWASHERS (5). TIGHTEN EACH HEX HEAD SCREW THROUGH THE FLAT PLATE ON THE UPRIGHT (1) AND INTO THE C-CHANNEL ON THE CROSSBAR (2). THEN TIGHTEN THE 5/8”-11 HEX NUT (10) FIRMLY TO ENGAGE THE 5/8” LOCKWASHER AND SECURELY LOCK THE ASSEMBLY. DO NOT
Loading...
+ 1 hidden pages