IEI Integration RACK-360G User Manual

RACK-360G
4U Rackmount Chassis
Version: 1.0
Quick Installation Guide
Relative HuVibratio
Shock: 10G acceleration peak to peak
midity: 5~95%
n:
o 5-17H mplitude displacement
z, 0.1” double a
o 1 40
7-6 Hz, 1.5G acceleration peak to peak
ABOUT THE RACK-360G
The 4U, heavy-duty steel RACK-360G rackmount industrial chassis is designed industrial environments where it will be exposed to dust, wide temperature variations, and shocks and vibrations, among other things.
AT/ATX compatible
to operate reliably in
SPECIFICATIONS
Form Factor: StandaSBC Form Factor: FConstruction: Heavy-duty steel Slots Number: 14-slot (360G), 7-slot (360GATCooling(s): 1 x 12cm fan Drive Bay Combinations:
o 3 x 5.25” Optical drive o 2 x 5.25” Optical drives
drive) + 1 x 3.5” FDD (flop
o
2 x 5.25” Optical drives + 2 x 3.5” FDDs
DimensOperating Temperature
ions (DxWxH):
o 435.5mm x 431mm x 176mm
rd 4U, 19” wide
ull-size, slot CPU cards
X)
s
+ 1 x 3.5” HDD (hard disk
py disk drive)
: 0~40°C
PACKING LIST
When you unpack the chassis, make sure the following i
tems have been shipped.
1 x Quick Installation Guide 1 x Power Cord 2 x Handles and handle plates 1 x Screw Set 2 x Keys
DETAILS OF INCLUDED SCREWS
The attached screw set includes five types of screws. Screws used for chassis installation are shown below.
1 2 3 4 5
Peripherals/Parts Screw Labels in the Picture Above
5.25” Disk Drives 5
3.5” FDD 5
3.5” HDD 1
2.5” HDD 4 Power Supply Unit 1 Rackmount Bracket 3
Table 1: Screws for Peripheral/Parts
3 Backplane 2
RACK-360G QIG IEI Technology Corp. Page 1
IMENSION DRAWING
D
e dimensions of RACK-360G are shown on the diagram below.
Th
320.00
431.00
176.00
176.00
431.00
Figure 1: Dimension Drawing (measurement units: millimeter)
I
O
RACK-360G QIG IEI Technology Corp. Page 2
INSTALLATION STEPS
To install the RACK-360G chassis, the following installation steps must be completed:
Step 1: Unpack the chassis. Step 2: Install the front handles. Step 3: Remove the top cover and hold-down clamp. Step 4: Install the PSU (power supply unit). Step 5: Install the backplane. Step 6: Install the CPU card. Step 7: Install the PCI and ISA expansion cards. Step 8: Install the disk drives. Step 9: Connect the cables. Step 10: Replace the hold-down clamp and the top cover.Step 0:
The installation steps outlined above are described in detail below. Please refer to the relevant section.
STEP 1: UNPACK
The RACK-360G is shipped in a plastic bag that is placed inside a cardboard box. The accessories are also shipped with the chassis. When you unpack the chassis you must: Make sure all the accessories and components listed above are
present
Make sure the chassis has not been damaged in anyway.
STEP 3: TOP COVER AND HOLD-DOWN CLAMP REMOVAL
STEP 3.1:REMOVE THE TOP COVER
The top cover is secured by a total of six screws, three on each side, of the chassis. Remove the screws and slide the cover toward the rear of the chassis.
To remove the top cover, please follow the steps below.
Step 1: Remove all six top cover retention screws. Remove three
retention screws from each side of the chassis.
Figure 3: Top Cover Retention Screws
Step 2: Slide the cover backwards and then lift it up gently. Step 0:
STEP 2: FRONT HANDLE INSTALLATION
Two handles are shipped with the RACK-360G chassis. The handles are installed on the sides, at the front of the chassis. Each handle is secured to the chassis by four retention screws. To install the handles, please follow the steps below.
Step 1: Align the retention screw holes on the side of the chassis
with the retention screw holes in the handle.
Step 2: Insert and fasten four retention screws for each handle.
Step 0:
Figure 2: Front Handle Retention Screws
Figure 4: Remove the Top Cover
STEP 3.2: HOLD-DOWN CLAMP REMOVAL
Detach the hold-down clamp by removing the two screws located on each side of the chassis and lift the hold-down clamp off the chassis.
Figure 5: Remove the Hold-Down Clamp
RACK-360G QIG IEI Technology Corp. Page 3
Loading...
+ 6 hidden pages